ML20058J325
| ML20058J325 | |
| Person / Time | |
|---|---|
| Site: | Zion File:ZionSolutions icon.png |
| Issue date: | 07/22/1982 |
| From: | Hind J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML20058J328 | List: |
| References | |
| NUDOCS 8208090231 | |
| Download: ML20058J325 (2) | |
See also: IR 05000295/1982011
Text
r-
2Na
.
.
July 22, 1982
Docket No. 50-295
Docket No. 50-304
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
1
'
Gentlemen:
This refers to the special safety inspection conducted by Mr. A. G. Januska
of this office on May 10-14, June 18 and 25,1982, of activities at Zion
Nuclear Generating Station, Units 1 and 2,_ authorized by NRC Operating
Licenses No. DPR-39 and No. DPR-48 and to the discussion of our findings
with Mr. K. Graesser and others of your staf f at the conclusion of the
inspection.
The enclosed copy of our inspection report identifies areas examined during.
the inspection. Within these areas, the inspection consisted of a selective
examination of procedures and representative records, observations, inter-
views with personnel, and a review of the letter from F. G. Lentine to
J. G. Keppler dated June 24, 1982.
During this inspection, certain of your activities appeared to be in non-
compliance with NRC requirements, as specified in the enclosed Appendix.
A written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of
this letter, the enclosures, and your response to this letter will be placed -
in the NRC's Public Document Room.
If this report contains any information
that you (or your contractors) believe to be exempt from disclosure under
10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-
phone within ten (10) days from the date of this letter of your intention
to file a request for withholding; and (b) submit within twenty-five (25)
days from the date of this letter a written application to this office to
withhold such information.
If your receipt of this letter has been
delayed such that less than seven (7) days are available for your review,
please notify this office promptly so that a new due date may be estab-
'11shed.
Consistent with Section 2.790(b)(1), any such. application must
8208090231 820722
~
,
PDR ADOCK 05000295
G
N .3I
'
.
Commonwealth Edison Company
2
July 22, 1982
be accompanied by an affidavit executed by the owner of the information
which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the
claim that the information should be withheld from public disclosure.
This section further requires the statement to address with specificity
the considerations listed in 10 CFR 2.790(b)(4). The information sought
to be withheld shall be incorporated as far as possible into a separate
part of the affidavit.
If we do not hear from you in this regard within
the specified periods noted above, a copy of this letter, the enclosures,
and your response to this letter will be placed in the Public Document
Room.
The responses directed by this letter (and the accompanying Notice) are
not subject to the clearance procedures of the Office of Management and
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
J. A. Hind, Di ctor
8L Division of Emergency Preparedness
and Operational Support
Enclosures:
1.
Appendix, Notice
t
of Violation
2.
Inspection Report
No. 50-295/82-11(DEPOS)
No. 50-304/82-09(DEPOS)
cc w/encls:
Louis 0. De1 George, Director
of Nuclear Licensing
K. L. Graesser, Station
Superintendent
DMB/ Document Control Desk (RIDS)
Resident Inspector, RIII
Karen Borgstadt, Office of
Assistant Attorney General
Mayor John B. Spencer
City of Zion
RIII
RIII
RIII
RII'
bY
t
hPa;
Januska/jp
Ake son
h
d
HATES
7/8/82
1