i.s

'[ *

  • h' *.[
    • DUKE POWER COM?ANY (1) ID No:*'

Changs No:

O/,4//g,fo/o{

,' e' PROCEDURE MAJOR C*ANGE d '/'

PROCESS RECORD Permansnt/ Restricted To g (2)

STATION: ,

(3) PROCEDURE TITLE:

(4) SECTION(S) OF PROCEDURE AFFECTED:

(5) DESCRIPTION OF CHANGE:

(Attach additional pages, if necessary.)

., /.. . .~ . - ~ .. ,

.~

,, = ,

(6) REASON FOR CF.ANGE:

. :. > c. .- !n'>

~

hq .:.. -s .

y .

~ ~

DATE:

(7) PREPARED BY:

(8) SAFETY EVALUATION ,

This change:

Yes No Represents a change to the station or procedures as described

, in the FSAR, or a test or experimene not described in the FSAR?

. Yes No

- Requires a change to the station Technical Specifications?

Yes No Involves an unreviewed safety question? .

If the answer to any of the abmre is "Yes", attach a detailed explanation.

As appropriate attach a completed " Nuclear Safety Evaluation Check List" form.

2 -- .

By:

~

Date:

.~-e-' ~~' - "J l

lK. .?

~' . .

-- . .- . ,, ~

~-

DATE: '

s I l -

-- (9) REVIEWED BY: -

7

' Cross-Disciplinary Review By: N/R: -

l . .

j. , ~'

- - -I. -

, - (10) TEMPORARY APPROVAL (IF NECESSARY):

__ - .c. . .

. By: .(SRO) Date:

By: Date:

' ~

DATE:

(11) APPROVED BY: - .

l (12) MISCELLANEOUS:

l Reviewed / Approved By: Date:

Reviewed / Approved By: Date:

(13) Page 1 of .-

8208030502 820726 Rev 14 .

' PDR ADOCK 05000369 PDa 9/20/77 p ,

f- . . - .

gf .. . . V . 4

<J. ,, ,

e s .. .

, DUKE PONER COMPANY -

(1) ID N3: MP/0/0/7650/08 PROCEDURE PREPA.uTION PROCESS RECORD ,

(2) STATION: McCuire Nuclear Station (3) PROCEDURE TITLE: Hooks - Safety Inspection

~.

(4) PREPARED BY: Al Sudduth . Ud DATE: 6!I'!D (5) REVIEWED BY: / f ).

9.4 Any indication of cracks noted '

d~uring visual inspection or found during non-destructive examination. ,

9.5 Cracks or deformation of end coweetions.

10.0 interference items ,

N/A .

~ ~

P d .'s s*

.. i

  • se. . ,.
  • l

_Procedurg 11.0 .

11.1 Visual Inspection 11.1.1 Look for evidence of damage from heat or chemicals.

11.1.2 Look for evidence of techanical deformation of the ho')k in-creased throat opening or, twist of the hook point froci the plane of the unbent shank.

11.1.3 Look for any evidence of cracks. Perform Section 11.2, if required.

11.1.4 compare any defect or damage with acceptance criteria, Section 9.0. If hooks is not satisfactory for service, tag it out of service and ensure that it is recoved and scrapped.

11.1.'5 If hook inspection is being performed as part of the " periodic inspedtion" section of MP/0/A/7650/05 or MP/0/A/7650/07, com-plete the Data Sheet, Enclosure 13.1 and attach it to the other data sheets being used in the crane or hoist inspection.

11.2 Non-destructive examination - Obtain the services of Quality Control to perform non-destructive exanination of the hook. This inspection may be performed in the field or at a suitable test station as agreed Attach a copy of the QA

. to by Maintenance and Quality Assurance. '

inspection report to Data Sheet #1. .

12.0 Restoration .

N/A 13.'O Enclosures .

13.1 Data Sheet #1 . .. .

u.

. ...3...:s.;}5.-

. . :9

_ s .k . _

.-.-- '._~.

l . .

f

, . ', . . . . . , ,] . ,

t '

l t

. .r.

- . ' ..a' ._-

t l

l

\

w . s.  :. _ _ _ . ,

WR No.

, j.$ .* . ,* / 4

.- ,p .. , ,

D2t2 DUKE POWER CO.TANY

/q McCUIRE MUCLEAR STATION M 1 BOOKS - SAFETY INSPECTION 5: s

=-a .*

es su ,=

. ca Evidence of damage from chemicals >:3 ca. > o El
1. .

p::

t5 ..,

Satisfactory Defective g-

-=s

. ct*J

2. Throat opening increase greater than 15% sa 8:2 -.W .O. 2 Satisfactory Defective

~.

3 i-j cm

.-=_,

3. Twist from plane of unbent hook greater t1ian 10 degrees -

3., .g.a _j ~

. . " ,. o , n Satisfactory Defective .~2 ,., t: * =

a.:  : c;> -

4. Cracks noted during visual inspection Satisfactory Defective
5. End connections Satisfactory Defective 1 .

Inspection performed by Reviewed by Maintenance Supervisor Date

  • ~

~,