Stntitn Diracsive 3.
r n /
Apprzval MI9/Z Criginal Date M/f-/P2__
/
/
Revised Date MCCUIRE' NUCLEAR STATION DUKE POUER COMPANY HANDLING OF HEAVY LOADS Purpose The purpose of this directive is to discuss handling heavy loads using cranes It will also discuss rigging practices and use of monorails and jib and hoists.
booms.
References NUREG-0612.
Definitions A load whose weight is greater than the combined weight of a Heavy Load singic spent fuel assembly and its handling tool. ( > 1500 lbs.).
The safest path that will be followed when a heavy load is being Load Path moved by a crane or hoist.
Monorail - A specific fixed structural rail, usually an I-beam, on which a lifting device is placed to make lifts on a specific piece of equipment in a predetermined direction.
A projecting arm attached at a pivot point on which a hoist travels Jib lifting only equipment located directly under the jibs radius.
Administration In making a lift, using a lifting device which does not travel a fixed path, a safe load path or zone shall be utilized if a heavy load is being noved.
The load path should be used for all other lifts but is not mandatory.
G206030471 B2072b PDR ADOCK 05000369 P
PDR i
~~7
(.
Stetion Directive 3.3.7 Pc9a # 2 e
Inspections All lif ting devices at station shall be inspected according to the applicable ANSI standard.
The only exception to this is the special lifting devices which shall be This is due to NUREG-612's inspected to the requirements in ANSI N14.6-1978.
interpretation of special lifting devices. The special lifting devices will be defined and placed in the station's FM program by the Accountable Engineer on cranes or will be included in the installation instructions.
Rigging Rigging shall be performed by qualified people. Qualifications will involve experience and/or training.
In all rigging practices, the proper lifting device should be selected according to the weight of load to be moved.
Honorails and Jibs Monorails and jibs are installed in the plant for specific pieces of equipment.
Since the Their intended use is for the aid in removal of this equipment.
monorailsand jibs are fixed, the load path for them is the area directly under them.
Movement of Loads s.
~
In moving of heavy loads, the following items shall be conaidered:
(1) Move steadily with load along the specified load path.
(2) Move as close to the floor as possibic.
(3)
Insure rigging is secure and adequately sized.
If for any reason there is an obstruction in the load path, the closest,
(
(4) most direct route shall be made to move around it and back to the load l
path if obstruction cannot be moved.
D L
._.