g 1 5 s82
-
Docket No. 50-263
Northern States Power Company
ATTN:
Mr. Dennis E. Gilberts
Senior Vice President
Power Supply
414 Nicollet Mall
Minneapolis, MN 55401
Gentlemen:
This refers to the routine safety inspection conducted by Messrs.
C. H. Brown and A. L. Madison of this office on March 1 through
April 30, 1982, of activities at Monticello Nuclear Generating Station
authorized by NRC Operating License No. DPR-22 and to the discussion
of our findings with Mr. Wayne Shamla at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
During this inspection, cercain of your activities appeared to be in non-
compliance with NRC requirements and NRC commitments, as specified in
the enclosed Appendixes. A written response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy
of this letter, the enclosures, and your response to this letter will
be placed'in the NRC's Public Document Room.
If this report contains
any information that you (or your contractors) believe to be exempt from
disclosure under 10 CFR 9.5(a)(4), it is necessary that you (a) notify
!
this office by telephone within ten (10) days from the date of this
letter of your intention to file a request for withholding; and (b) submit
,
I
within twenty-five (25) days from the date of this letter a written appli-
!
cation to this office to withhold such information.
If your receipt of
this letter has been delayed such that less than seven (7) days are avail-
l
able for your review, please notify this office promptly so that a new
duc date may be established. Consistent with Section 2.790(b)(1), any
'
,
i
l
I,
8207300373 020715
7, 60f
PDR ADOCK 05000263
l
G
1
l
'
.
.
Northern States Power Company
2
July 15, 1982
.
such application must be accompanied by an affidavit executed by the owner-
of the information which identifies the document or part sought to be
withheld, and which contains a full statement of the reasons which are the
-bases for the claim that the information should be withheld from pablic
disclosure. This section further requires the statement to address with
specificity the considerations listed in 10 CFR 2.790(b)(4). The informa-
tion sought to be withheld shall be incorporated as far as possible into a
separate part of the affidavit.
If we do not hear from you in this regard
within the specified periods noted above, a copy of this letter, the
enclosures, and your response to this letter will be placed in the Public
Document Room.
The responses directed by this letter (and the accompanying Notice) are
not subject to the cicarance procedures of the Office of Management and
Budget as required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
- 6r!ginal signed by R.L. Spessard"
R. L. Spessard, Director-.
'
Division of Project and
Resident Programs
Enclosures:
1.
Appendix A, Notice
of Violation
2.
Appendix B, Notice
of Deviation
-
3.
Inspection Report No.
50-263/82-01(DPRP)
cc w/encis:
W. A. Shamla, Plant Manager
)
DMB/ Document Control Desk (RIDS)
'
Resident Inspector, RIII Monticello
j
Resident Inspector, RIII Prairie
'
Island
John W. Ferman, Ph.D., Nuclear
Engineer, MPCA
l
RI
RII
RII/d-
/t
'
eyes /jp
t eete
""A
Spes ar,p
/
($
k
J