Forwards IE Insp Rept 50-346/82-09 on 820506-0601 & Notice of Violation
ML20058E909
Person / Time
Site: Davis Besse 
Issue date: 07/15/1982
From: Streeter J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML20058E920 List:
References
NUDOCS 8207300251
Download: ML20058E909 (2)


See also: IR 05000346/1982009

Text

.

.

JUL 1 5 082

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. Richard P. Crouse

Vice President

Nuclear

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. W. G. Rogers,

and P. M. Byron of this office on May 6. through June 1, 1982, of activities at

Davis-Besse Nuclear Power Station authorized by NRC Operating License No. NPF-3

and to the discussion of our findings with Mr. T. Murray at the conclusion of

the inspection.

The enclosed copy of our inspection report identifies areas examined during the

inspection. Within these areas, the inspection consisted of a selective exami-

nation of procedures and representative records, observations, and interviews

with personnel.

During this inspection, certain of your activities appeared to be in noncom-

pliance with NRC requirements, as specified i the enclosed Appendix. A written

response is required.

In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this

letter, the enclosures, and your response to this letter will be placed in the

NRC's Public Document Room.

If this report contains any information that you

(or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),

it is necessary that you (a) notify this office by telephone within ten (10)

days from the date of this letter of your intention to file a request for with-

holding; and (b) submit within twenty-five (25) days from the date of this letter

a written application to this office to withhold such information.

If your re-

ceipt of this letter has been delayed such that less than seven (7) days are

available for your review, please notify this office promptly so that a new due

date may be established. Consistent with Section 2.790(b)(1), any such appli-

cation must be accompanied by an affidavit executed by the owner of the infor-

mation which identifies the document or part sought to be withheld, and which

contains a full statement of the reasons which are the bases for the claim that

the information should be withheld from public disclosure. This section further

requires the statement to address with specificity the considerations listed in

10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated

J, -6C f

F207300251 820715

PDR ADOCK 05000346

L

0

PDR

. _ _ _ _

N

.

.

'

Toledo Edison Company

2

July 15, 1982

f

as far as possible into a separate part of the affidavit.

If we do not hear

from you in this regard within the specified periods noted above, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the Public Document Room.

m

The responses directed by this letter (and the accompanying Notice) are not

subject to the clearance procedures of the Office of Management and' Budget as

required by the Paperwork Reduction Act of 1980, PL 96-511.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

J. F. Streeter, Chief

Projects Branch 2

'

Enclosures:

1.

Appendix, Notice

of Violation

i

2.

Inspection Report

No. 50-346/82-09(DPRP)

cc w/encis:

T. D. Murray, Station

Superintendent

DMB/ Document Control Desk (RIDS)

~ Resident Inspector, RIII

Harold W. Kohn, Power Siting

Commission

Helen W. Evans, State of Ohio

4

Robert M. Quillin, Ohio

Department of Health

l

.