JUL 1 5 082
Docket No. 50-346
Toledo Edison Company
ATTN:
Mr. Richard P. Crouse
Vice President
Nuclear
Edison Plaza
300 Madison Avenue
Toledo, OH 43652
Gentlemen:
This refers to the routine safety inspection conducted by Messrs. W. G. Rogers,
and P. M. Byron of this office on May 6. through June 1, 1982, of activities at
Davis-Besse Nuclear Power Station authorized by NRC Operating License No. NPF-3
and to the discussion of our findings with Mr. T. Murray at the conclusion of
the inspection.
The enclosed copy of our inspection report identifies areas examined during the
inspection. Within these areas, the inspection consisted of a selective exami-
nation of procedures and representative records, observations, and interviews
with personnel.
During this inspection, certain of your activities appeared to be in noncom-
pliance with NRC requirements, as specified i the enclosed Appendix. A written
response is required.
In accordance with 10 CFR 2.790 of the Commission's regulations, a copy of this
letter, the enclosures, and your response to this letter will be placed in the
NRC's Public Document Room.
If this report contains any information that you
(or your contractors) believe to be exempt from disclosure under 10 CFR 9.5(a)(4),
it is necessary that you (a) notify this office by telephone within ten (10)
days from the date of this letter of your intention to file a request for with-
holding; and (b) submit within twenty-five (25) days from the date of this letter
a written application to this office to withhold such information.
If your re-
ceipt of this letter has been delayed such that less than seven (7) days are
available for your review, please notify this office promptly so that a new due
date may be established. Consistent with Section 2.790(b)(1), any such appli-
cation must be accompanied by an affidavit executed by the owner of the infor-
mation which identifies the document or part sought to be withheld, and which
contains a full statement of the reasons which are the bases for the claim that
the information should be withheld from public disclosure. This section further
requires the statement to address with specificity the considerations listed in
10 CFR 2.790(b)(4). The information sought to be withheld shall be incorporated
J, -6C f
F207300251 820715
PDR ADOCK 05000346
L
0
. _ _ _ _
N
.
.
'
Toledo Edison Company
2
July 15, 1982
f
as far as possible into a separate part of the affidavit.
If we do not hear
from you in this regard within the specified periods noted above, a copy of
this letter, the enclosures, and your response to this letter will be placed
in the Public Document Room.
m
The responses directed by this letter (and the accompanying Notice) are not
subject to the clearance procedures of the Office of Management and' Budget as
required by the Paperwork Reduction Act of 1980, PL 96-511.
We will gladly discuss any questions you have concerning this inspection.
Sincerely,
J. F. Streeter, Chief
Projects Branch 2
'
Enclosures:
1.
Appendix, Notice
of Violation
i
2.
Inspection Report
No. 50-346/82-09(DPRP)
cc w/encis:
T. D. Murray, Station
Superintendent
DMB/ Document Control Desk (RIDS)
~ Resident Inspector, RIII
Harold W. Kohn, Power Siting
Commission
Helen W. Evans, State of Ohio
4
Robert M. Quillin, Ohio
Department of Health
l
.
RII
RIII
RIII
$
fb
p
DEI
Byron
reet
f eye /
7/ /82
QM
j
.
4
,y
-- - --
,
. . . ,
. . - , -
,
, ,
,,
r
- - , .
. . - -
". . -