ML20058E619
| ML20058E619 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 11/29/1993 |
| From: | Beach A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | Barkhurst R ENTERGY OPERATIONS, INC. |
| Shared Package | |
| ML20058E621 | List: |
| References | |
| NUDOCS 9312070080 | |
| Download: ML20058E619 (5) | |
See also: IR 05000382/1993032
Text
Ib
.
,g"%
h
NUCLEAR REGULATORY _ COMMISSION
R EGION IV
kk
[
611 RY AN PLAZA DRIVE, SUll E 400
P
AR L INGTON, TLxAS 76011 8064
j
e..**
ffJV 2 91993
Docket:
50-382
License: NPF-38
Entergy Operations, Inc.
ATTN: Ross P. Barkhurst, Vice President
Operations, Waterford
P.O. Box B
Killona, Louisiana 70066
SUBJECT: NRC INSPECTION REPORT 50-382/93-32 (NOTICE OF VIOLATION)
This refers to the inspection conducted by Mr. E. J. Ford and
Ms. J. L. Dixon-Herrity of this office on September 19 through
October 30, 1993.
The inspection included a review of activities authorized
for your Waterford Steam Electric Station, Unit 3, facility. At the
conclusion of the inspection, the findings were discussed with those members
of your staff identified in the enclosed report.
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures-
and representative records, interviews with personnel, and observation of
activities in progress. The purpose of the inspection was to determine
whether activities authorized by the license were conducted safely and in
accordance with NRC requirements.
Based on the results of this inspection, certain licensed activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice).
The violation is of concern because the continuous
failure to follow a system operating procedure and' return a deviated valve to
its normal locked closed position resulted in the failure of the automatic
makeup for the-ultimate heat sink, allowing the ultimate heat sink water level
to fall below the Technical Specification requirement.
The valve had been
deviated open and not questioned since August 17, 1993.
A second violation was identified that involved the failure to promptly
identify and document the failure of a valve to stroke as required by the
Technical Specification. This violation is considered to be a second example
of the apparent violation identified in NRC Inspection Report 50-382/93-33,
which involved the failure to promptly identify and correct the inoperability
of containment spray Valve CS-125A. This violation is of concern because your
failure to promptly identify the inoperable status of Valve MS-120B and to
enter this inoperability into your corrective action system is. indicative of a
continuing problem to properly implement your corrective action system.
With respect to the first violation, you are required to respond to this
letter and should follow the instructions specified in the enclosed Notice
9312070080 931129
[
^
m
_ _
.
. _
_
_
___
_
_
_
__ _ _ . - . .
__
_
_ . . . _ _
.
- '
r
l
'
i
Entergy Operations, Inc.
-2-
'
l
i
when preparing your response.
In your response, you should document the
!
specific actions taken and any additional actions you plan to prevent
recurrence. After reviewirg your response to this Notice, including your
i
proposed corrective acticas and the results of future inspections, the NRC
will determine whether further NRC enforcement action is necessary to ensure
{
compliance with NRC regulatory requirements.
With respect tc the second violation, you are requested to address your
corrective %.tions as a part of your response to the violation identified in
NRC Inspection Report 50-382/93-33.
!
!
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
!
this letter and its enclosures will be placed in the NRC Public Document Room.
The responses directed by this letter and the enclosed Notice are not subject
to the clearance procedures of the Office of Management and Budget as required
1
by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.
\\
Should you have any questions concerning this inspection, we will be pleased
j
to discuss them with you.
j
Sincerely,
W
A. Bill Beach, Direc or
Division of Reactor Projects
Enclosures:
1.
Appendix A - Notice of Violation
2.
Appendix B - NRC Inspection Report
50-382/93-32
cc w/ enclosures:
Entergy Operations, Inc.
ATTN: Harry W. Keiser, Executive
Vice President & Chief Operating Officer
P.O. Box 31995
Jackson, Mississippi
39286-1995
Entergy Operations, Inc.
ATIN: Jerrold G. Dewease, Vice President
Operations Support
P.O. Box 31995
Jackson, Mississippi 39286
.
.
,
<.'
i
!
.
'
i
i
!
Entergy Operations, Inc.
-3-
.j
i
'
!
!
t
Wise, Carter, Child & Caraway
l
ATTN: Robert B. McGehee, Esq.
P.O. Box 651
l
Jackson, Mississippi 39205
~j
Entergy Operations, Inc.
ATTN:
D..F. Packer, General
Manager Plant Operations
P.O. Box B
Killona, Louisiana 70066
!
Entergy Operations, Inc.
]
ATIN:
L. W. Laughlin
j
Licensing Manager
P.O. Box B
-i
Killona, Louisiana 70066
'
Chairman
Louisiana Public Service Commission
'
One American Place, Suite 1630
Baton Rouge, Louisiana 70825-1697
f
Entergy Operations, Inc.
l
,
'
ATTN:
R. F. Burski, Director
i
Nuclear Safety
l
P.O. Box B
'
Killona, Louisiana 70066
l
Hall Bohlinger, Administrator
Radiation Protection Division
i
P.O. Box B2135
1
Baton Rouge, Louisiana 70884-2135
!
Parish President
i
St. Charles Parish
,
P.O. Box 302
Hahnville, Louisiana 70057
j
,
Mr. William A. Cross
,
Bethesda Licensing Office
3 Metro Center
Suite 610
Bethesda, Maryland 20814
Winston & Strawn
ATTN: Nicholas S. Reynolds, Esq.
1400 L Street, N.W.
Washington, D.C.
20005-3502
l
!
I
.
._
_
-.
8
--
-
.
.__
.
4
- . .
L!
Entergy Operations, Inc.
-4-
NOV 2 9 E
!
!
!
bec to DMB (IE01)
l
!
bec distrib. by RIV:
J. L. Milhoan'
Resident Inspector
.!
Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503
l
MIS System
DRSS-FIPS
j
RIV File
Project Engineer (DRP/D)
l
Section Chief (DRP/TSS)
[
,
!
!
,
!
!
!
h
l
!
i
!
i
!
$
,
l
i
I
n
~
RIV:RI Yh
SRI @fh
DRP/D M /.
C:DRP/M
D; drph
'
.v
i
JDixon-Herrity;df
EJFord
KMKennedy
TFStetka
ABBeach
-
11/21/93
11/f1/93
11/)9/93
11/29/93
11/A4/93
c
C
Y
'
, . - . .
. . ~ . -
,
- ,
.
-.
-,
-j.
.d
,
r
Entergy Operations, Inc.
-4-
NOV 2 91993
j
!
AcctoDMBf(IE01')-.
,
bec distrib. by RIV:
J. L. Milhoan
Resident Inspector
i
Section Chief (DRP/D)
Lisa Shea, RM/ALF, MS: MNBB 4503
i
'
MIS System
DRSS-FIPS
$
RIV File
Project Engineer (DRP/D)
Section Chief (DRP/TSS)
!
!
,
l
.
)
i
i
'
()
RIV:RI Nh
SRI @f h
DRP/D M /.
C:DRP/D[
D(3RP h
a
y
JDixon-Herrity;df
EJFord
KMKennedy
TFStetka
ABBeach
,
i
11/21/93
11/d/93
11/)9/93
11/29/93
11/M/93
i
i
1