Forwards IE Insp Repts 50-454/82-10 & 50-455/82-07 on 820501-0618 & Notice of Violation
ML20058C452
Person / Time
Site: Byron  Constellation icon.png
Issue date: 07/08/1982
From: Spessard R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Reed C
COMMONWEALTH EDISON CO.
Shared Package
ML20058C456 List:
References
NUDOCS 8207260352
Download: ML20058C452 (2)


See also: IR 05000454/1982010

Text

.

,

gyC B

OO

Docket No. 50-454

Docket No. 50-455

Commonwealth Edison Company

NITN:

Mr. Cordell Reed

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the routine safety inspection conducted by Messrs. W. L. Forney,

C. Ramsey and J. Ulic of this office on May 1 through June 18, 1982, of

activities at Byron Station Units 1 and 2, authorized by NRC Construction

Permits No. CPPR-130 and No. CPPR-131 and to the discussion of our findings

with Mr. V. I. Schlosser and others of your staff at the conclusion of the

inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and

interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as specified in the enclosed Appendix.

A written response is required.

In accordance with 10 CFR 2.790 of the Commistion's regulations, a copy of

this letter, the enclosures, and your response to this letter will be placed

in the NRC's Public Document Room.

If this report contains any information

that you (or your contractors) believe to be exempt from disclosure under

10 CFR 9.5(a)(4), it is necessary that you (a) notify this office by tele-

phone within ten (10) days from the date of this letter of your intention

to file a request for withholding; and (b) submit within twenty-five (25)

days from the date of this letter a written application to this office to

withhold such information.

If your receipt of this letter has been

delayed such that less than seven (7) days are available for your review,

please notify this office promptly so that a new due date may be estab-

lished. Consistent with Section 2.790(b)(1), any such application must

be accompanied by an affidavit executed by the owner of the information

s

which identifies the document or part sought to be withheld, and which

0

contains a full statement of the reasons which are the bases for the

claim that the information should be withheld from public disclosure.

8207260352 820708

PDR ADOCK 05000454

G

PDR

.%4~o/

._____

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

l

Commonwealth Edison Company

2

This section further requires the statement to address with specificity

the considerations listed in 10 CFR 2.790(b)(4). The information sought

to be withheld shall be incorporated as far as possible into a separate

part of the affidavit.

If we do not hear from you in this regard within

the specified periods noted above, a copy of this letter, the enclosures,

and your response to this letter will be placed in the Public Document

Room.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

Horiginal signed by R.L. Spe::--d

R. L. Spessard, Director

Division of Project and

Resident Programs

Enclosure:

Inspection Reports

No. 50-454/82-10(DPRP) and

No. 50-455/82-07(DPRP)

cc w/ enc 1:

Louis 0. De1 George, Director

of Nuclear Licensing

V. I. Schlosser, Project Manager

Gunner Sorensen, Site Project

Superintendent

R. E. Querio, Station

Superintendent

DMB/ Document Control Desk (RIDS)

Resident Inspector, RIII Byron

Resident Inspector, RIII

Braidwood

Karen Borgstadt, Office of

Assistant Attorney General

Myron M. Cherry

t

h

IpI

III

RIII

ayes /dm

'nop k

y 9. >

y

.s

-

4

ylliams

Spessard

6/g/82

y,j,,

g,

!

___________

-_-

1