SEP 2 4 1993
-
,
Docket Nos. 50-325, 50-324
i
Carolina Power and Light Company
ATTN: Mr. R. A. Anderson
Vice President
Brunswick Steam Electric Plant
P. O. Box 10429
Southport, NC 28461
.
Gentlemen:
)
SUBJECT:
NOTICE OF VIOLATION AND NOTICE OF DEVIATION
(NRC INSPECTION REPORT NOS. 50-325/93-39 AND 50-324/93-39)
This refers to the inspection conducted by M. Shymlock of this office on
,
August 23 - 27, 1993. The inspection included a review of activities autho-
rized for your Brunswick facility. At the conclusion of the inspection, the
,
findings were discussed with those members of your staff identified in the
enclosed report.
.
l
Areas examined during the inspection are identified in the report. Within
these areas, the inspection consisted of selective examinations of procedures
and representative records, interviews with personnel, and observation of
activities in progress.
Based on the results of this inspection, certain of your activities appeared
to be in violation of NRC requirements, as specified in the enclosed Notice of
Violation (Notice), and other activities appeared to deviate from commitments
to the NRC, as specified in the enclosed Notice of Deviation. We are
!
concerned about the violation and deviation because you failed to determine
correctly the functional status of a plant design feature and you failed to
meet a commitment to test this feature in the established time frame. These
issues are discussed below.
,
i
Your engineering organization did not correctly determine the functional
capability of the Emergency Diesel Generator (EDG) 2X LOCA jet assist feature.
i
Your letter to the NRC dated March 6,1993 regarding this issue stated that no
'
modifications were performed on this system which would have altered the
original tested capability. Based on performance of start-up testing you
.
concluded that the 2X LOCA feature met its design functional capability. The
!
testing performed on July 16, 1993 demonstrated that the EDG 2X LOCA jet
assist feature did not meet its design capability and your original functional
,
assessment was incorrect. Your September 20, 1991, response to an NRC Notice
of Violation dated August 21, 1991, documented your commitment to perform EDG
2X LOCA logic testing during the upcoming Unit I and Unit 2 refueling outages.
l
However, the Unit 2 testing was not performed until July 16, 1993.
It is our
understanding that the testing of Unit I will be performed prior to restart
from the current outage.
t
080071
\\\\
l
"
9310120083 930924
ADDCK 05000324 4
G
ppg
Q
fhf
5
'
.
.
,
..
'
Carolina Power & Light
2
Company
In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of
this letter and its enclosures will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us.
Sincerely,
original signed by
J.
P.
Jaudon/for
Albert F. Gibson, Director
Division of Reactor Safety
Enclosures:
1.
2.
Notice of Deviation
3.
NRC Inspection Report
cc w/encls:
Mr. W. S. Orser
Executive Vice President
Nuclear Generation
Carolina Power & Light Company
P. O. Box 1551 Mail Code - CPB 12
Raleigh, NC 27602
Mr. H. W. Habermeyer, Jr.
Vice President
Nuclear Services Department
Carolina Power & Light Company
P. O. Box 1551
- Mail OHS 7
Raleigh, NC 27602
J. M. Brown
Plant Manager Unit 1
Brunswick Steam Electric Plant
P. O. Box 10429
Southport, NC 28461
C. C. Warren
Plant Manager Unit 2
Brunswick Steam Electric Plant
P. O. Box 10429
Southport, NC 28461
(cc w/encls cont'd - See page 3)
l
b
t
.-
.-
."
.
, ,
Qaroli~na Power & Light
3
SEP 2 4 o93
!
Company
l
i
(cc w/encls cont'd)
Mr. Mark S. Calvert
i
Associate General Counsel
i
Brunswick Steam Electric Plant
P. O. Box 10429
-
-
Southport, NC 28461
.
Kelly Holden, Chairman
Board of Commissioners
P. O. Box 249
Bolivia, NC 28422
'
Dayne H. Brown, Director
Division of Radiation Protection
N. C. Department of Environment,
Commerce & Natural Resources
P. O. Box 27687
Raleigh, NC 27611-7687
H. A. Cole
Special Deputy Attorney General
State of North Carolina
P. O. Box 629
t
Raleigh, NC 27602
'
Robert P. Gruber
Executive Director
Public Staff .NCUC
i
P. O. Box 29520
Raleigh, NC 27626-0520
,
Public Service Commission
,
State of South Carolina
P. O. Box 11649
Columbia, SC 29211
bec w/ encl:
Document Control Desk
,
H. Christensen, RII
P. Milano, NRR
j
NRC Resident Inspector
U.S. Nuclear Regulatory Commission
i
Star Route 1, Box 208
Southport, NC 28461
RII:DRS
RIJ:DS
RII:DRS
RI :DRP -
RII:
'
c$2
to
17df)
}
RMoore/)'}PFillitn
MShymlock
HCh istensen
CJ ian
09/fd93
09/J#93
09/p7/93
09/Q/93
09/ 'f93
p
3