August 25, 1993 i

Docket No. 50-461 DISTRIBUTION Docket File NRC & Local PDRs Mr. Richard F. Phares PDIII-2 r/f JRoe l

Director - Licensing JZwolinski JDyer Clinton Power Station CMoore DPickett Post Office Box 678 RHernan OGC Mail Code V920 ACRS(10)

BClayton, RIII Clinton, Illinois 61727 TChen, RES r

Dear Mr. Phares:

SUBJECT:

CLINTON POWER STATION - REVIEW OF RESPONSE TO GENERIC LETTER 88-20, SUPPLEMENT NO. 4 - INDIVIDUAL PLANT EXAMINATIONS FOR EXTERNAL EVENTS (TAC NO. M83607)

The NRC issued Supplement No. 4 to Generic Letter 88-20 on June 28, 1991, to require each licensee and each construction permit holder to conduct an individual plant examination of external events (IPEEE).

Guidance was provided with the generic letter supplement in the form of NUREG-1407,

" Procedural and Submittal Guidance for the Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities." The supplement requested a response that would 1) identify the method and approach selected for the IPEEE, 2) describe the method to be used if it has not previously been submitted for staff review, and 3) identify the milestones and schedule for performing the IPEEE and submittal of the results to the NRC.

Following our review of your initial response to Supplement No. 4, we informed yo2 by letter on October 14, 1992, that your scheduled completion date did not support the Commission's goal of closure on the severe accident issue by mid-1994.

However, upon review of your letter dated November 23, 1992 (U-602066), we have determined that, for the reasons provided, your decision to maintain your original schedule to complete and submit the IPEEE in September 1995 is acceptable.

Please keep us informed of any changes to your schedule or methodology.

Sincerely, original signed by Douglas V. Pickett, Senior Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation cc:

See next page OFC kA:PDIII-2 PM:PDIJI-2 D:PDIII-2 NAME CMdORE DPdETT JDYER k TU/93

[/M/93 2

DATE

! /-793

/

COPY LYES /NO (YES/NO YES[NO)

{!)) { Q ] $ %

\\

9309090106 930825 PDR ADOCK 0500046 70 P

PDR

August 25, 1993

~

ilocketNo.50-461 DISTRIBUTION Docket File NRC & Local PDRs Mr. Richard F. Phares PDIII-2 r/f JRoe Director - Licensing JZwolinski JDyer Clinton Power Station CMoore DPickett Post Office Box 678 RHernan OGC Mail Code V920 ACRS(10)

BClayton, RIII clinton, Illinois 61727 Tchen, RES i

Dear Mr. Phares:

SUBJECT:

CLINTON POWER STATION - REVIEW OF RESPONSE TO GENERIC LETTER 88-20, SUPPLEMENT NO. 4 - INDIVIDUAL PLANT EXAMINATIONS FOR EXTERNAL EVENTS (TAC NO. M83607) l The NRC issued Supplement No. 4 to Generic Letter 88-20 on June 28, 1991, to require each licensee and each construction permit holder to conduct an individual plant examination of external events (IPEEE). Guidance was provided with the generic letter supplement in the form of NUREG-1407,

" Procedural and Submittal Guidance for the Individual Plant Examination of External Events (IPEEE) for Severe Accident Vulnerabilities." The supplement requested a response that would 1) identify the method and approach selected for the IPEEE, 2) describe the method to be used if it has not previously been submitted for staff review, and 3) identify the milestones and schedule for performing the IPEEE and submittal of the results to the NRC.

Following our review of your initial response to Supplement No. 4, we informed you by letter on October 14, 1992, that your scheduled completion date did not support the Commission's goal of closure on the severe accident issue by mid-1994.

However, upon review of your letter dated November 23, 1992 (U-602066), we have determined that, for the reasons provided, your decision to maintain your original schedule to complete and submit the IPEEE in September 1995 is acceptable.

Please keep us informed of any changes to your schedule or methodology.

Sincerely, original signed by Douglas V. Pickett, Senior Project Manager Project Directorate III-2 Division of Reactor Projects - III/IV/V Office of Nuclear Reactor Regulation ec: See next page OFC bA:hDIII-2 PM:PDQI-2 D:PDIII-2 NAME C'HIORE DPdETT JDYER I TU/93 I//[/93 i 93 DATE

/

/

/

COPY YES/NO (YEShNO YESf i

O Mr. Richard F. Phares Clinton Power Station Illinois Power Company Unit No. 1 cc:

Mr. J. S. Perry Illinois Department Senior Vice President of Nuclear Safety Clinton Power Station Office of Nuclear Facility Safety Post Office Box 678 1035 Outer Park Drive Clinton, Illinois 61727 Springfield, Illinois 62704 Mr. J. A. Miller Mr. J. W. Blattner Manager Nuclear Station Project Manager Engineering Department Sargert & Lundy Engineers Clinton Power Station 55 East Monroe Street Post Office Box 678 Chicago, Illinois 60603 Clinton, Illinois 61727 Sheldon Zabel, Esquire Schiff, Hardin & Waite 7200 Sears Tower 233 Wacker Drive Chicago, Illinois 60606 Resident Inspector U.S. Nuclear Regulatory Commission RR#3, Box 229 A Clinton, Illinois 61727 Mr. R. T. Hill Licensing Services Manager General Electric Company 175 Curtner Avenue, M/C 481 San Jose, California 95125 Regional Administrator, Region III 799 Roosevelt Road, Building 4 Glen Ellyn, Illinois 60137 i

Chairman of DeWitt County c/o County Clerk's Office DeWitt County Courthouse Clinton, Illinois 61727 Mr. Robert Neumann Office of Public Counsel State of Illinois Center j

100 W. Randolph, Suite 11-300 Chicago, Illinois 60601 l

l l

)

-