ML20056G723
| ML20056G723 | |
| Person / Time | |
|---|---|
| Issue date: | 09/07/1993 |
| From: | Runyan M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Jonathan Montgomery NRC |
| Shared Package | |
| ML20056G560 | List: |
| References | |
| NUDOCS 9309070091 | |
| Download: ML20056G723 (1) | |
Text
-
[
UNITED STATES et -
NUCLEAR REGULATORY COMMISSION 3
.S FIEGION V e
k 8
1450 MARIA LANE 4
WALNUT CREEK. CAUFORNIA 94596-5368 g
MEMORANDUM FOR:
John M. Montgomery Deputy Regional Administrator FROM:
Michael Runyan Reactor Inspector, Engineering Branch Division of Reactor Projects
SUBJECT:
COMMENTS ON THE DRAFT REGION V REAllCNMENT STUDY (1)
Additional benefits of Option 2 not mentioned in the report:
(a)
This option would result in all four NRC regions and headquarters being within one time zone difference, resulting in better communications and coordination.
- (b)
Region-based inspector objectivity would be improved because inspectors would be travelling to 12 reactor sites as opposed to 4 or 8 under the current alignment.
(c)
This option best anticipates the impending shutdown of WNP-2.
(2)
Additional consideration for Option 4:
(a)
Loss of geographical 8% pay for Region V employees will be substantially offset by lack of a Texas state income tax.
Michael Runyan Reactor Inspector, Engineering Branch Division of Reactor Projects
/4 s
/
a 9309070091 930812 i
PDR COMMS NRCC 3pg
-CORRESPONDENCE PDR