ML20056G723

From kanterella
Jump to navigation Jump to search
Comments on Draft Region V Realignment Study.Comments Include Addl Benefits of Option 2 Not Mentioned in Rept & Addl Consideration for Option 4
ML20056G723
Person / Time
Issue date: 09/07/1993
From: Runyan M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Jonathan Montgomery
NRC
Shared Package
ML20056G560 List:
References
NUDOCS 9309070091
Download: ML20056G723 (1)


Text

-

[

UNITED STATES et -

NUCLEAR REGULATORY COMMISSION 3

.S FIEGION V e

k 8

1450 MARIA LANE 4

WALNUT CREEK. CAUFORNIA 94596-5368 g

MEMORANDUM FOR:

John M. Montgomery Deputy Regional Administrator FROM:

Michael Runyan Reactor Inspector, Engineering Branch Division of Reactor Projects

SUBJECT:

COMMENTS ON THE DRAFT REGION V REAllCNMENT STUDY (1)

Additional benefits of Option 2 not mentioned in the report:

(a)

This option would result in all four NRC regions and headquarters being within one time zone difference, resulting in better communications and coordination.

- (b)

Region-based inspector objectivity would be improved because inspectors would be travelling to 12 reactor sites as opposed to 4 or 8 under the current alignment.

(c)

This option best anticipates the impending shutdown of WNP-2.

(2)

Additional consideration for Option 4:

(a)

Loss of geographical 8% pay for Region V employees will be substantially offset by lack of a Texas state income tax.

Michael Runyan Reactor Inspector, Engineering Branch Division of Reactor Projects

/4 s

/

a 9309070091 930812 i

PDR COMMS NRCC 3pg

-CORRESPONDENCE PDR