Forwards Insp Rept 50-302/93-17 on 930606-0710 & Notice of Violation
ML20056E983
Person / Time
Site: Crystal River 
Issue date: 08/09/1993
From: Sinkule M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Beard P
FLORIDA POWER CORP.
Shared Package
ML20056E984 List:
References
NUDOCS 9308250376
Download: ML20056E983 (3)


See also: IR 05000302/1993017

Text

._

.

.

_ _ .

_ -_

- . .

.

-

.

.-

.

(;

-

.

AUG - 91993

M

sq y

-

E $

1

Docket No. 50-302

License No. DPR-72

,

Florida Power Corporation

Mr. P. M. Beard Jr.

Senior Vice Presid-1, Nuclear Operations

ATTN: Manager, fDci ir Operations Licensing

P. O. Box 219 - Li a

Crystal River, FL 34423

Gentlemen:

$

SUBJECT: NOTICE OF VIOLATION

,

(NRC INSPECTION REPORT NO. 50-302/93-17)

P

This refers to the inspection conducted by P. Holmes-Ray and R. Freudenberger

of this office on June 6 - July 10,1993. The inspection included a review of

activities authorized for your Crystal River facility. At the conclusion of

the inspection, the findings were discussed with those members of your staff

,

identified in the enclosed report.

Areas examined during the inspection are identified in the report. Within

these areas, the inspection consisted of selective examinations of procedures

,

and representative records, interviews with personnel, and observation of

activities in progress.

.

t

Based on the results of this inspection, certain of your activities appeared

to be in violation of NRC requirements, as specified in the enclosed Notice of

l

Violation (Notice). The violations are of concern because of the most recent

i

higher rate of personnel errors.

In addition, the enclosed Inspection Report

identifies activities that violated NRC requirements that will not be subject

to enforcement because the licensee's efforts in identifying at,d/or correcting

'

!

the violation meet the criteria specified in Section VII.B. of the Enforcement

Policy.

>

The Inspection Report also identified an additional example of a violation

,

cited last month in NRC Inspection Report No. 50-302/93-13 for failure to

maintain plant' system alignments in accordance with procedures. We will

evaluate your response to that violation to ensure corrective actions are

adequate to prevent recurrence of this additional example.

You are required to respond to this letter and should follow the instructions

-

specified in the enclosed Notice when preparing your_ response.

In your

response, you should document the specific actions taken and any additional

actions you plan to prevent recurrence. After reviewing your response to this

Notice, including-your proposed corrective actions and the results of future

inspections, the NRC will determine whether further NRC enforcement action is

i

necessary to ensure compliance with NRC regulatory requirements.

l

l

'

i

'

9308250376 930809

g

(l

l

PDR

ADOCK 05000302

'g

,

o

""

3fo/

,

.

.

_

-.

-

--

.

.

.-_

-

-.

..

-

..

--

..

_

.

- - _

!

.

.

.,

I

f

AVG - 91933

Florida Power Corporation

2

In accordance with 10 CFR 2.790 of the NRC's " Rules of Practice," a copy of

this letter, its enclosures, and any reply will be placed.in the NRC Public

i

Document Room.

l

The responses directed by this letter and the enclosed Notices are not subject

to the clearance procedures of the Office of Management and Budget as required

!

by the Paperwork Reduction Act of 1980, Pub. L. No. 96.511.

i

i

J

,

Should you have any questions concerning this letter, please contact us.

'

. Sincerely,

Original signed by:

{

Marvin V. Sinkule

.

'

Marvin V. Sinkule, Chief

i

Reactor Projects Branch 2

'

Division of Reactor Projects

Enclosures:

'

l.

Notice of Violation

i

2.

NRC Inspection Report

j

cc w/encls:

l

Gary L. Boldt

!

Vice President, Nuclear Production

i

Florida Power Corporation

l

P. O. Box 219-SA-2C

!

Crystal River, FL 34423-0219

B. J. Hickle, Director

Nuclear Plant Operations

Florida Power Corporation

P. O. Box 219-NA-2C

i

Crystal River, FL 34423-0219

,

}

R. C. Widell, Director

l

Nuclear Operations Site Support

!

Florida Power Corporation

!

P. O. Box 219-NA-21

l

Crystal River, FL 34423-0219

!

A. H. Stephens

General Counsel

{

MAC - A5D

P. O. Box 14042

i

St. Petersburg, FL 33733

I

cc w/encls cont'd:

(See page 3)

.

. .

. .

.

. -

.

. . _ . -

_ - - - - _ , . . - . _ . _ . _ , - . . . - . . . . _ . _ . _ . _ , _ _ , . _

. '

_

-

.

AUG - 9 1993

Florida Power Corporation

3

cc w/encls cont'd:

Attorney General

Department of Legal Affairs

The Capitol

Tallahassee, FL 32304

Bill Passetti

Department of Health and

Rehabilitative Services

1317 Winewood Boulevard

Tallahassee, FL 32399-0700

Administrator

Department of Environmental

Regulation

Power Plant Siting Section

State of Florida

2600 Blair Stone Road

Tallahassee, FL 32301

Robert G. Nave, Director

Emergency Management

Department of Community Affairs

2740 Centerview Drive

Tallahassee, FL 32399-2100

Chairman

Board of County Commissioners

Citrus County

110 N. Apopka Avenue

Inverness, FL 36250

Robert B. Borsum

B&W Nuclear Technologies

1700 Rockville Pike, Suite 525

Rockville, MD 20852-1631

bec w/encls.

K. Landis, RII

S. Vias, RII

I

H. Silver, NRR

NRC Resident Inspector

Document Control Desk

RI ,DRP

RI

-]

RS

Kla'n is

08/b/93

08M /93