r

,t,.

. b Y. ;t,,,"

t 4;, *o O, 4p W a

^

'~

L; G

j.:

ENCIDSURE I BRUNSWICK STEAM ELECTRIC PLANT, UNITS.1 AND 2 -

'NRC DOCKETS.50-325 &L50-324

-OPERATING LICENSES ~.DPR-71 & DPR-62' SUPPLEMENT TO REQUEST FOR LICENSE. AMENDMENT 4

^

p OFFSITE/0NSITE ELECTRICAL DISTRIBUTION SYSTEM

' Corrected Page-Brunswick - Unit 1 Page 3/4 8-1 1

t i)!

? ',

,1 i

i.;

-. t

.. i_

i E

9008280053 900821 I

PDR ADOCK O$000324 P

PDC

e' 1

f n

4 f,Y-

'3/418 ELECTRICAL' POWER SYSTEMS; 3/4.8.1 A.C.: SOURCES v

[

p OPERATINC t

LIMITINC CONDITION FOR OPERATION n

3.8.1.1 As'a minimum, the following A.C. electrical power sources ~ shall be t

OPERABLE:'

a.

Two physically independent circuits,'per unit, between the offsite transmission' network and the onsite Class lE distribution system, and b.

Four separate and' independent diesel generators, each-with:

l.

A separate engine-mounted fuel tank containing a minimum of J100 gallons of fuel,-

l

-2.-

A separate day f uel tank containing a minimum of 22,650 gallons of fuel, and i

3.

'A separate fuel transfer pump.

a I

c. '

A plant fuel storage, tank containing a' minimum of 74,000 gallons of f ue l~.

APPLICABILITY': OPERATIONAL CONDITIONS 1, 2, and 3.

J ACTION a.

With one offsite circuit of the above required A.C. elect rical powg '

l

-soure'es not capable of supplying the Class IE distribution system:

I 1.

Demonstra the OPERABILITY of the remaining A.C. offsite source' by-perfore ag Surveillance Requirement 4.8.1.1.1.a within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> -thereaf ter; 2.

Demonstrate 'the OPERABILITY of the diesel generators by performing Surveillance Requirements _4.8.1.1.2.a.4 and I

4.8.1.1.2.a.5 within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> and at least once per'72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> thereafter; 3.

Restore the inoperable offsite circuit to OPERABLE status within-

-72 hours or be in at least HOT SHUYDOWN within'the'next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

With' Unit 2 in OPERATIONAL CONDITIONS 4 or 5 and one Unit 2 offsite' I

circuit of the above two required A. C. electrical power sources not

,- capable of. supplying the Class lE distribution system, restore the inoperable offsite circuit to OPERABLE status within 45 days or place.

.,b Unit 1 in'at least 110T SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />. The provisions of ACTIONS 3.8.'1.1.a.l. 3.8.1.1'.a.2, and 3.8.1.1.a.3 are not applicable.

1 BRUNSWICK - UNIT 1 3/4 8-1 Amendment'No.