Forwards IE Insp Rept 50-293/82-16 on 820510-0613 & Notice of Violation
ML20055B636
Person / Time
Site: Pilgrim
Issue date: 07/07/1982
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Harrington W
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML20055B637 List:
References
NUDOCS 8207220572
Download: ML20055B636 (2)


See also: IR 05000293/1982016

Text

_ _ _

(.

'

O

D

Docket No. 50-293

m0N

Boston Edison Company M/C Nuclear

ATTN: Mr. William D. Harrington

Senior Vice President, Nuclear

800 Boylston Street

Boston, Massachusetts 02199

Gentlemen:

Subject:

Inspection 50-293/82-16

This refers to the routine safety inspection conducted by Mr. J. Johnson of this

office on May 10 - June 13,1982, at the Pilgrim Nuclear Power Station, Plymouth,

Massachusetts, of activities authorized by NRC 1.icense ho. DPR-35 and to the

i

discussions of our findings held by Mr. Johnson with Mr. R. Machon and other

members of your staff periodically during the inspection and at the conclusion

l

of the inspection.

<

Areas examined during this inspection are described in the NRC Region I inspection

report enclosed with this letter. Within these areas, the inspection consisted

of selective examinations of procedures and representative records, interviews

with personnel, and observations by the inspector.

l

Based on the results of this inspection, it appears that one of your activities

was not conducted in full compliance with NRC requirements, as set forth in the

Notice of Violation, enclosed herewith as Appendix A.

This item of noncompliance

i

has been categorized into the level described in 10 CFR 2. Appendix C and the

,

Federal Register Notice 47 FR 9987 dated March 9, 1982. You are required to

respond to this letter; and, in preparing your response, you should follow the

instructions in Appendix A.

Our inspector also verified the steps you have taken to correct the violations

brought to your attention in the enclosures to our letters dated March 26, 1981

(ItemC)andJuly 29, 1931. These violations involved technically inadequate

procedures and improper control of procedure approval and distribution methods.

l

Our inspection has found that your corrective actions for two items (81-02-03

l

and31-12-01) described in Detail Paragraph 2 in the enclosed inspection are

incomplete. Your letters to this office dated June 16, 1981 (Item 81-02-03)

and September 8, 1981 (Item 81-12-01) describe intended corrective actions and

planned completion dates.

It appears that your stated actions were not effective

since these items have not been fully corrected.

In your reply to this letter

,

you are to submit an amended response covering the above items.

bur reply should

-

B207220572 ggoyoy

gDRADOCK05000g

ornce>

..

.. . . . . . . . . . .

-... . . . . . . . .

- - - - . .


.

. . . ~ . - - -

~ ~ . .

-

sununue >

. . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . .

. . . . . . . . . . . . . . . . .

- . . . . . . . . . . . . . . . . .

. . . . . . ~ . - - . . .

. - ~ ~ . . . - ~ ~

. . - - . - ~ ~ -

. . . . . . . . .

.

. . .

. . . . . .

. . . . . . . . . . . . . .

. -

- - . . . -

. . -

- ~ . -

- - - . - - -

-

--- - '

04rq

OFFICIAL RECORD COPY

usa mi-me

nac renu ais po. sci sncu caa

- . . _ _ . _

_ _ _ _. _ __ _ ,

.

_

.

. - .

_ _

-

. _ _ . ,

-

-

.-

.

.

-

.

-

_. -

i

E

.

s

.

.

Boston Edison Company M/C

2

Nuclear

JUL 0 71982

address specifcally (1) the reason (s) for the failure to fully correct the

,

identified items; (2) the corrective steps which you will take to prevent re-

.

currence of ineffective followup corrective actions; and (3) the date when full

'

compliance will be achieved. We continue to be concerned with your management

4

controls which pennitted these items to remain uncorrected.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures

'

will be placed in the NRC Public Document Room, unless you notify this office,

by telephone, within ten days of the date of this letter and submit written

4

application to withhold infonnation contained therein within thirty days of

the date of this letter. Such application must be consistent with the require-

'

mentsof2.790(b)(1).

Your cooperation with us in this matter is appreciated.

Sincerely,

Original SiSD'OIY'

Richard W. Starostecki, Director

Division of Project and Resident

,

Programs

Enclosures:

1.

Appendix A, Notice of Violations

2.

NRC Region I Inspection Report No. 50-293/82-16

cc w/ enc 1s:

J. N. Bonsall, Chairman, Department of Public Utilities

J. E. Howard, Vice President. Nuclear

R. D. Nachon, Nuclear Operations Manager - Pilgrim Station

A. V. Morisi, Manager, Nuclear Operations Support

Joanne Shotwell, Assistant Attorney General

Plymouth Board of Selectman

Public Document Room (PDR) (LPDR)

Local Public Document Room

I

l

NuclearSafetyIndermationCenter(NSIC)

NRC Resident Inspector

'

Conunonwealth of Massachusetts (2)

N

.

bec w/encls:

.

Region I Docket Room (w/ concurrences)

'

Chief Operational Support Section (w/o encls)

l

l

LA

a

no

!

omer p'N PRP..?

..h.I.t DP8P .. R19.$..

(/

d.J. L....

.

.

.

.... .

. . . . . . . .

'

-

$URNAME) AIo SQR[C} C.

..[.lSASSer..

Der..

. . . .l ." 1. . ..

. ......

...

.

. . .

-.

..

.

. 7lN8..k.. .

..7/h/E.h

..q. ..f.. .

..g.f.

..k.

}

oare )

..

.

.

.

.

. . . . ..

Nnc ronu m ooe Nacu om

OFFICIAL RECORD COPY

USGPO 1991-3E960