ML20055B639
| ML20055B639 | |
| Person / Time | |
|---|---|
| Site: | Pilgrim |
| Issue date: | 07/07/1982 |
| From: | Starostecki R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20055B637 | List: |
| References | |
| 50-293-82-16, NUDOCS 8207220575 | |
| Download: ML20055B639 (1) | |
Text
--_
APPENDIX A NOTICE OF VIOLATION Boston Edison Company Docket No. 50-293 Pilgrim Nuclear Power Station License No. DPR-35 As a result of the inspection conducted on May 10, 1982 - June 13, 1982, and inaccordancewiththeNRCEnforcementPolicy(10CFRPart2,AppendixC),
47 FR 9987 (March 9, 1982), the following violation was identified:
Technical Specification 6.11 requires that procedures for radiation protection be adhered to for all operations involving radiation exposure. Procedure No.
6.1-012. " Access to High Radiation Areas", Revision 8, requires that if a Health Physics control point is established for a specific work area, the Health Physics representative will be responsible to assure that the area is locked or access to the area is othemise controlled.
Contrary to the above, on June 4,1982, the responsible Health Physics represen-tative at an established control point for the Traversing In-Core Probe drive mechanism high radiation area did not lock or control access to the area.
This is a Severity Level IV Violation (Supplement IV).
Pursuant to the provisions of 10 CFR 2.201, Boston Edison Company is hereby required to submit to this office within thirty days of the date of this Notice, a written statement or explanation in reply, including:
(1) the corrective steps which have been taken and the results achieved:
(2) the corrective steps which will be taken to avoid further violations; and (3) the date when full compliance will be achieved. Under the authority of Section 182 of the Atomic Energy Act of 1954, as amended, this response shall be submitted under oath or affimation.
Where good cause is shown, consideration will be given to extending your response time.
The responses directed by this Notice are not subject to the clearance procedures of the Office of Management and Budget as required by the Papemork Reduction Act of 1980, PL 96-511.
Dated JUL 0 71982
'mm Richard W. Starostecki, Director Division of Project and Resident Programs B207220575 999,9, gDRADOCK 05000293 PDR
.