Responds to Util Re Receipt of Draft IE Insp Rept 50-309/82-05 & Request for Extension of Review Deadline Until 820703.Insp Rept Was Not Draft,But Expedited Final Version.Request for Extension Not Granted
ML20054M395
Person / Time
Site: Maine Yankee
Issue date: 06/15/1982
From: Starostecki R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Randazza J
Maine Yankee
Shared Package
ML20054M396 List:
References
NUDOCS 8207130144
Download: ML20054M395 (2)


See also: IR 05000309/1982005

Text

a

e,

Maine Yankee Atomic Power Company

ATTN: Mr. J. B. Randazza

Vice President

' Nuclear Operations

,

83 Edison Drive

JUN 15 ,1982

Augusta, Maine 04336

-

Gentlemen:

Subject:

NRC INSPECTION REPORT 50-309/82-05

Reference:

YOUR JUNE 4,1982 LETTER REGARDING SUBJECT REPORT

In the referenced letter, you indicate receiving a draft of NRC Inspection

Report 50-309/82-05 on June 1, 1982.

You also requested an extension of the

l

review deadline to July 3, 1982. This should clarify your understanding of the

status of the subject inspection report and respond to your request for extension.

Although the copy of the subject report you received on June 1 indicated it was

a draft, you should note that, in fact, it was an expedited version of the final

report signed by me on May 28, 1982.

The May 28, 1982 letter forwarding the report did not forward our enforcement

actions resulting from the findings of the report because of our current practice

of issuing the inspection report separately from our proposed enforcement in

cases where we need further information to understand the central issues involved.

An enforcement conference was held with you on June 2,1982, to obtain this

information.

Regarding your request for extension, it is not NRC policy to withhold reports

from public distribution pending licensee review of the factual content of the

report or its cover letter.

Rather, NRC withholds reports solely based on the

considerations discussed in 10 CFR 2.

Therefore, your request for a 30 day

extension has not been granted. You have 30 days from the date of the report to

identify information which you consider proprietary in nature and request the

withholding of this information.

.

You are welcome to respond, in writing, to the report findings. Your response

will be considered when we determine the scope of enforcement actions we will

pursue.

.

OFFICIAL RECORD COPY

f

8207130144 820615

lb

PDR ADOCK 05000309

O

PDR

.

.

-

.

S

'

JUN 151982

If you have further questions, we will be available to reply.

Sincerely,

Original Signed BYt

Richard W. Starostecki, Director,

Division of Project and Resident

Programs

cc:

E. W. Thurlow, President

J. H. Garrity, Senior Director, Nuclear Engineering and Licensing

E. C. Wood, Plant Manager

R. H. Groce, Senior Engineer, Licensing (YAEC)

J. A. Ritsher, Attorney (Ropes and Gray)

Public Document Room (PDR)

Local Public Document Room (LPDR)

Nuclear Safety Information Center (NSIC)

NRC Resident Inspector

State of Maine

bcc:

Region I Docket Room (with concurrences)

Chief, Operational Support Section (w/o encis)

1

RI:bf)RF

DPk

'

RI: PRP

Gal 1o/pja

Brunner

Star 5stec)

6[f/gv

0FFI /.

ECORDCOPY

_

-

-- _