ML20054L877

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec 3.8.1.1,action Statement a, Allowing Continued Operation in Interim Until Required Repairs Can Be Performed on Diesel Generator 2.Effective 820701-08 Only
ML20054L877
Person / Time
Site: Brunswick  Duke Energy icon.png
Issue date: 07/03/1982
From:
CAROLINA POWER & LIGHT CO.
To:
Shared Package
ML20054L874 List:
References
NUDOCS 8207090029
Download: ML20054L877 (1)


Text

.

BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 1 DPR-71 OPERATING LICENSE CONDITION Operating License Paragraph 2.C.(2)(b)

Effective July 1, 1982, and until July 8, 1982, Action statement "a" of Technical Specification 3.8.1.1 shall read as follows:

ACTION:

a. With either one offsite circuit or one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirements 4.8.1.1.1.a and 4.8.1.1.2.a.4 within two hours and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter; restore at least two offsite circuits and four diesel generators to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SRUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

.1 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 .

DPR-62 OPERATING LICENSE CONDITION s

Operating License Paragraph 2.c. (2)(c)

Effective July 1, 1982, and until July 8, 1982, Action statement "a" of Technical Specification 3.8.1.1 shall read as follows:

1-l ACTION:

l

a. With either one offsite circuit or one diesel generator of the above required A.C. electrical power sources inoperable, demonstrate the OPERABILITY of the remaining A.C. sources by performing Surveillance ,

l Requirements 4.8.1.1.1.a and 4.8.1.1.2.a.4 within two hours and at least once per 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> thereafter; restore at least two offsite circuits and four diesel generators to OPERABLE status within 7 days or be in at least HOT SHUTDOWN within the next 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> and in COLD SHUTDOWN within the following 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, l

8207090029 820703 l PDR ADOCK 050003gg P

i

_ _ . . _ _ _ _ . . _ _ __. _ _ _ _ _ .. . _.