Carolina Power and Light Company
ATTN: Mr. J. A. Jones, Senior Executive
Vice President and Chief
Operating Officer
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
Subject: Report Nos
0-400/82-15 and 50-401/82-15
This refers to the routine safety inspection conducted by Mr. M. D. Hunt
I
of this of fice on May 10-13, 1982, of activities authorized by NRC Construc-
tion Permit Nos. CPPR-158 and CPPR-159 for the Shearon Harris facility
and to the discussion of our findings held with Mr. R. M. Parsons, Project
General Manager, at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews
with personnel, and observations by the inspectors.
Within the scope of this inspection, no violations or deviations were disclosed.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Document Room unless you notify this of fice, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with the requirements
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
,
-_m u
\\m)
4%
F. J. Long, Acting Chief
Reactor Projects Branch 1
Division of Project and
Resident Programs
Enclosure:
See Page 2
kh
o
TEol
.
.
Carolina Power and Light Company
2
JUtl
4 1982
Enclosure:
Inspection Recort Nos.
50-400/82-15 and 50-401/82-15
cc w/ encl:
R. M. Parsons, Project General Manager
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of North Carolina
RII
RII
RII *
R.II '-
RII
0L
$'
IFV
VZ
$n p
TECon(lon
MHunt
aw
ARHerdt CHeh-
F Lo g
U&A/de
C$/t /82
06/S /82 Old'l/82
/ /82
-