ML20054H063
| ML20054H063 | |
| Person / Time | |
|---|---|
| Site: | Brunswick |
| Issue date: | 03/31/1982 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Jackie Jones CAROLINA POWER & LIGHT CO. |
| Shared Package | |
| ML20054H031 | List: |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737 NUDOCS 8206220536 | |
| Download: ML20054H063 (2) | |
See also: IR 05000324/1982005
Text
Yt l/o w
' . . '
c.
MAR 31 199g
Carolina Power and Light Company
ATTN: Mr. J. A. Jones, Senior Executive
Vice President and Chief
Operating Officer
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
Subject:
Report Nos. b/82-05)n'd 50-325/82-05
This refers to the routine safety inspection conducted by Mr. L. W. Garner of
this office on January 15 - February 15, 1982, of activities authorized by NRC
Operating License Nos. DPR-71 and DPR-62 for the Brunswick facility. Our
-
preliminary findings were discussed with Mr. C. R. Dietz, Plant Manager, at the
conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements. These items and references to pertinent
'
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
During the inspection it was found that certain activities under your license
appeared to deviate from comitments to the Commission and have safety signif-
icance. This item is identified in the Notice of Deviation enclosed herewith as
Appendix B.
Please provide us in writing within 30 days of your receipt of this
letter your comments including a description of corrective actions that have been
=
or will be taken, corrective actions which will be taken to avoid further
deviations, and the date your corrective actions were or will be completed.
Two new unresolved items are identified in the enclosed inspection report.
These
items will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure (s)
will be placed in the NRC's Public Document Room unless you notify this office,
by telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter.
Such application must be consistent with the requirements
of 2.790(b)(1).
The responses directed by this letter and the enclosures are not subject to the
-
clearance procedures of the Office of Management and Budget as required by the
'
Paperwork Reduction Act of 1980, PL 96-511.
8206220536 820609
PDR ADOCK 05000324
O
,
j
_ _ . . . ..
. _ _ _
.
.
Corolina Power & Light Company
2
MAR 311982
Should you nave any questions concerning tnis letter, we will be glad to discuss
,
tr,e'n vsi th you.
'
Sincerely,
S
R. C. Lewis, Director
Division of Resident arc
Reactor Project Inspection
l
Enclosures:
1.
Appenaix A, flotice of Violation
2.
Appendix B, flotice of Deviation
3.
Inspection Report tios. 50-324
50-325/82-05
cc .s/ encl-
'~. R. Dietz , Plan t ibnager
bcc w/enci
'iRC Resicen t In spec tor
Document Management Brancn
Sta te of 'lortn Carolina
cd \\f
[
-.
4
RII
d4
RI:
rr
RI:
RII(Il$.
%L
"y
,
(, . 4a c ,'
c
L '. . '.uarner:ls
.
C3arger
- Scantrell
CAlderson
RClewis
3/
,82
-J/ ? (;'/l
3/b732
3/g/82
J/
/82
3f7g'82
_ _ _ _ _ _ _ _ _ _ _ _