Text
.
l
)
PHILADELPHIA ELECTRIC COMPANY 4
2301 M ARKET STREET P.O. BOX 8699 PHILADELPHIA. PA.19101 SHIELOS L. D ALTROFF ELacim*C Pm o C lom October 31, 1980 Re:
Docket !io s. 50-277 50-278 "r.
Thomas A.
Inpolito, Chief Operating Reactors 3 ranch J3 71 vision of Operating Reactors US ?!uclear Regulatory Connission
'l a s h i n g t o n, DC 20555 SU3 JECT:
Peach 30ttom Fire Protection Progran
References:
- 1) Letter da t e d !!ovembe r, 1973, T.
A.
- Ippolito,
'I R C to E.
G.
- Bauer, Philadelphia Electric Company
- 2) Letter dated !!ay 23, 1979, T.
A.
- Ippolito,
!!RC to E.
G.
'l a u e r, Philadelphia Electric Conpany
Dear Str. Ippolito:
This letter provides additional information and connitaenta regarding the Peach 3otton Fire Protection Program as a result of a telephone conversation on October 25, 1980 between tJ.
C.
Birely of Philadelphia Electric Company and D.
Verrelli and S.
H ttd s o n of the !!u c le a r Regulatory Connission.
1.
?IRC Recuirement (PF-47 of reference 1)
Exterior hose should be hydrostatically tested annually; interior hose should be so tested every three years.
Resnonse
'J e oronosed in a subnittal dated February 16, 1979, S.
L.
Daltroff to T.
A.
Ippolito, to hydrostatically test or replace all exterior hoses on a two year interval.
The !!IIC has taken f00b s
/
D l
8011040 %/
f 2
9 D**D
- D A
oo o
2 It r.
T.
A.
Ipoolito, Chief Page 2 exception to this nroposal.
Therefore, in order to conform with the NRC criteria, Philadelphia Electric Company's position is revised to read as follows: Exterior hose shall be 7
hydrostatically tested or replaced with an appropriately tested hose annually.
Interior hose shall be hydrostatically tested or replaced with an appropriately tested hose every three years.
2.
NRC Requirement (Section 3.2.6 of reference 2)
Determine the need to upgrade the reacter feed pump turbine oil reservoir doors to provide a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> fire rating.
Resnonse The existing doors are certified by Underwriters Laboratories as having a 3 hour3.472222e-5 days <br />8.333333e-4 hours <br />4.960317e-6 weeks <br />1.1415e-6 months <br /> fire rating, and therefore satisfies the NRC requirement.
3.
':RC Requirement (Section 3.2.3 (3) of reference 2)
Study the feasibility of installing remote alara lamps for new or existing smoke detectors which are obstructed from sight in large rooms with nultiple detectors.
Resnonse Philadelphia Clectric Company previously conaitted to the i
incorporation of this feature into the early warning detector systen where the local detector alara indicator are obstructed from sight in large rooms with multiple detectors.
The NRC staff J
has requested the locations where we have concluded tnis feature is required.
i The cable spreading room smoke detector systen will be provided with a remote indicator panel outside the roon.
Each smoke detector in the cable spreading room will have a lamo on the panel to indicate detector actuation.
The systen'in other areas of the plant for~which 'RC approval has been received, will not require renote laups.
We will evaluate the need for this feature on additional detector systens as they are approved by the N P,C.
4 Should you have any questions on the above, clease do not hesitate to contact us.
Very truly yours, i
' /
-.I
<- ? _ _
t 1
-