Second Interim Rept Re Nonlow Stress Impression Stamping of safety-related Piping,Initially Reported 820204.Training Sessions Conducted Emphasizing Stamp Types & Correct Usage. Anticipated Completion Is 820715
ML20054E413
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 06/02/1982
From: Chiangi N
CAROLINA POWER & LIGHT CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
10CFR-050.55E, 10CFR-50.55E, CQAD-82-966, CQAD-82-9665E, NUDOCS 8206110188
Download: ML20054E413 (2)


Text

I i'

1p

\\

t; Carodna 'Po'vi4st ufhEcomsiany 02 JUNE l, lhk

  • 2 File: SH N-2/18 CQAD 82-966 Item 70 Mr. James P. O'Reilly United States Nuclear Regulatory Commission Region II 101 Marietta Street, Northwest Atlanta, Georgia 30303 SHEARON HARRIS NUCLEAR POWER PLANT UNITS 1 AND 2 DOCKET NOS. 50-400 AND 50-401 NON-LO" ~,r RE? IMPRESSION STAMPING OF SAFETY-RELATED PIPING INTERIM REPORT NO. 2

Dear Mr. O'Reilly:

On February 4, 194"., the NRC (Mr. C. Julian) was notified by Carolina Power &

Light Company (Messrs. L. E. Jones and K. V. Hate') of an item considered-potentially reportable per the provisions of 10CFR50.55(e). The NRC was informed that non-low stress impression stamps were found to have been used on-various safety-related piping systems for identification of' field weld numbers.

The intent of this letter is to inform you that Carolina Power & Light Company has not been able to complete its evaluation concerning this matter because of delays in obtaining a definition of low stress stamps and the lack of ability to measure impression radiuses. To date, training sessions have been conducted. emphasizing stamp types and correct usage, also removal of high stress stamps from the field has been' completed. Evaluation of the scope.and impact of stress calculations is continuing.

It is now anticipated that the completion of the reportability evaluation will be accomplished by July 15, 1982, at which ' time, the NRC will be informed of the results. ' Completion of corrective action and' submittal of final report,-

if this item is deemed reportable, will be accomplished by November 1, 1982.

820611015B 820602 PDR ADOCK 05000400 g

PDR 411 Fayetteville Street

  • P. O. Box 1551
  • Raleigh, N. C. 27602

[{ Q mmw;.asmeswm -

Mr. -James P. - O'Railly

-_2

'Juna 2, 1982 a

Thank you for your consideration in this matter.

Yours.very truly, w. Em_7 N. J. Chia i - Manager Engineeri Construction Quality Assurance / Quality Control NJC/pdd cc:

Mr. G. Maxwell Mr. V. Stello (2)