ML20054D919

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-348/82-03 & 50-364/82-02 on 811216-820115 & Notice of Violation
ML20054D919
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 03/09/1982
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML20054D871 List:
References
NUDOCS 8204230504
Download: ML20054D919 (2)


See also: IR 05000348/1982003

Text

'

. " ,

'

.

V/ clh to

MAR 0 91983

Alabama Power Company

ATTN: Mr. R. P. Mcdonald

Vice President-Nuclear Generation

P. 0. Box 2641

Birmingham, AL 35291

Gentlemen:

Subject:

Report Nos. M 48/82-0 M d 50-364/82-02

This refers to the routine safety inspection conducted by Mr. W. H. Bradford of

this office on December 16, 1981 - January 15, 1982 and to the management meeting

held at the Region II office on January 26, 1982, regarding the Unit 1 improper

containment spray header nozzle orientation.

The scope of the inspection related

to activities authorized by NRC Operating license NPF-2 and NPF-8 for the

Farley 1 and 2 facility. Our preliminary findings were discussed with

Mr. W. G. Hairston, Plant Manager, at the conclusion of the site inspection

and with Mr. R. P. Mcdonald and staff at the January 26, 1982 management meeting.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and references to pertinent

requirements are listed in the Notice of Violation enclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Roun unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold infonnation contai,ted therein within thirty days of the

date of this letter. Such application must be consistent with the requirements

of2.790(b)(1).

The responses directed by this letter and the ent.losures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Paduction Act of 1980, PL 96-511.

l

8204290609

<

.

'

! .

. .

Alabama Power Company

2

MAR 0 31932

Should you have any questions concerning this letter, we will be glad to discuss

,

them with you.

Sincerely,

R. C. Lewis, Director

Division of Project and

Resident Programs

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report flos. 50-348/82-03

and 50-364/82-02

cc w/ encl:

W. O. Whitt, Executive Vice President

F. L. Clayton, Jr., Senior Vice President

H. O. Thrash, General llanager-fluclear Generation

0. D. Kingsley, Jr., fianager, Nuclear Engineering

and Technical Services

J. W. McGowan, Manager-Safety Audit

and Engineering Review

W. C. Carr, Supervisor-Safety Audit

and Engineering Review

W. G. Hairston, III, Plant Manager

bcc w/ encl:

NRC Resident Inspector

,

'

Document Management Branch

State of Alabama

,

l

4

RII

RII

RII

RII

bM

'

Y

Y

b

VBlownlee

jLc.,i sloAXi

lfV

WBradford:dt

JRogge

f3[

_

,

'

@$ /82

3/$ /82

$/y/82

7/ /82

/

v

l

.

__

_ _ _ _ . _ _ _ _ . _ _ . ___