Forwards IE Insp Repts 50-259/82-04,50-260/82-04 & 50-296/82-04 on 820126-29 & Notice of Violation
ML20054D917
Person / Time
Site: Browns Ferry  Tennessee Valley Authority icon.png
Issue date: 02/23/1982
From: Cantrell F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20054D903 List:
References
NUDOCS 8204230502
Download: ML20054D917 (2)


See also: IR 05000259/1982004

Text

, 9 (lcid

'.o'..

-

.

.o

.

FEB 2 3 1982

!

l

!

. Tennessee Valley Authority

ATTN: Mr. H. G. Parris

Manager of Power

,

"

500A Chestnut Street Tower II

l

Chattanooga, TN 37401

Gentlemen:

,

Subject: Report Nog 0

-260/82-04 and 50-296/82-04

This refers to the routine safety inspection conducted by Mr. W. P. Kleinsorge

of this office on January 26-29, 1982, of activities authorized by NRC Operating

License Nos. DPR-33, DPR-52 and DPR-68 for the Browns Ferry facility. Our pre-

liminary findings were discussed with Mr. G. T. Jones, Plant Superintendent, at

the conclusion of the inspection.

j

Areas examined during the inspection and our findings are discussed in- the

'

enclosed inspection report.

Within these areas, the inspection consisted of

i

selective examinations of procedures and representative records, interviews with

!_

personnel, and observations by the inspector.

'

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements.

This item and references to pertinent

,

requirements are listed in the Notice of Violation enclosed herewith as

4

Appendix A.

Elements to be included in your response are delineated in

Appendix A.

j

We have examined actions you have taken with regard to previously identified

'

enforcement matters. These are discussed in the enclosed inspection report.

I

One new unresolved item is identified in the enclosed inspection report. This

"

item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

be placed in the NRC's Public Document Room unless you notify this office, by

!-

telephone, within ten days of the date.of this letter and submit written appli-

!

cation to withhold information contained thereir. within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

,

The responses directed by this letter and the enclosures are not subject to the

j

clearance procedures of. the Office of Management and Budget as required by the

i

Paperwork Reduction Act of 1980, PL 96-511.

,

!

?

!

j

820423 a 60%

.

e

'

!

l

L

',

-

.

.

,

.

.

Tennessee Valley Authority

2

pgg p 3 1982

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

'

F. S. Cantrell, Acting Chief

Reactor Projects Branch 1

Division of Resident and

Reactor Project Inspection

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-259/82-04,

50-260/82-04 and 50-296/82-04

cc w/enci.

H. J. Green, Director of Nuclear Power

G. T. Jones, Plant Superintendent

R. E. Rogers, Project Engineer

H. N. Culver, Chief, Nuclear Safet,y

Review Staff

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Alabama

RJJ ,

,RII 7

RII

RI

at/ RII

'/~.

- h.' '

h(

9-

Y

,,bMPKleinsorge:ht

fARHerdt

CEMurphy

RB cher$

/FSCantrell

/' 2//1/82

2$r/82

2/p/82

2/ 9/82 .

2/23/82