Responds to NRC Re Violations Noted in IE Insp Repts 50-259/82-04 & 50-296/82-04.Corrective Actions:Insp Form in QA Instruction Ltr Revised to Include Certification Level
ML20054D914
Person / Time
Site: Browns Ferry  
Issue date: 04/06/1982
From: Mills L
TENNESSEE VALLEY AUTHORITY
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML20054D903 List:
References
NUDOCS 8204230499
Download: ML20054D914 (3)


Text

-

TENNESSEE VALLEY AUTHORITY CHATTANOOGA. TENNESSEE 37 0 400 Chestnut Street Tower II April 6,1982 'p" g A S. tj d o e p U.S. Nuclear Regulatory Commission Region II ATTN: James P. O'Reilly, Regional Administrator 101 Marietta Street, Suite 3100 Atlanta, Georgia 30303

Dear Mr. O'Reilly:

This is in response to F. S. Cantrell's February 23, 1982 letter to H. G. Parris, Report Nos. 50-259/82-04, -260/82-04, and -296/82-04, concerning activities at the Browns Ferry Nuclear Plant which appeared to violate NRC requirements. Enclosed is our response to Appendix A, Notice of Violation. As of March 8, 1982, TVA had not yet received this report. As discussed with Austin Hardin of your staff on March 8, TVA was granted until April 8, 1982 to submit this response. If you have any questions, please call Jim Domer at FTS 858-2725.

To the best of my knowledge, I declare the statements contained herein are complete and true.

Very truly yours, TENNESSEE VALLEY AUTHORITY s

. M.

il 's, Maliag e Nuclear Regulation r N % fety Enclosure 8204230M M An Equal Opportumty Employer

ENCLOSURE RESPONSE - NRC INSPECTION REPORT NOS.

50-259/82-04, 50-260/82-04, AND 50-296/82-04 F. S. CANTRELL'S LETTER TO H. G. PARRIS DATED FEBRUARY 23, 1982 Appendix A - (259/82-04-01, 296/82-04-01) 10 CFR 50, Appendix B, Criterion V as implemented by TVA Topical Report c

TVA-TR 75-01, paragraph 17.2.5 requires activities affecting quality be accomplished in accordance with procedures. TVA N-0QAM, Part II, Section 6.3, paragraph 2.4 requires NDE personnel to enter their level of certification on nondestructive examination reports. TVA Procedure MAT-21 " Control of Torus Modification Activities," dated April 15, 1981, Appendix B, paragraph 3 3 requires welding electrodes to be maintained in electrode over.s separated by heat number.

Contrary to the above, on January 27-29, 1982, activities affecting quality were not accomplished in accordance with proceduces in that:

1.

A number of nondestructive examination reports did not identify the level of certification (Level I, II, or III) of the NDE personnel performing the examination.

2.

Type E-309-15 welding electrodes from two different batches / lots / heats were mixed together in one compartment of an electrode oven in the Unit 3 torus welding electrode issue station.

This is a Severity Level VI Violation (Supplement I.F).

Response

Example 1 1.

Admission or Denial of the Alleged Violation TVA admits the violation occurred as stated.

2.

Reasons for the Violation if Admitted The inspection form in Division Procedure Manual (DPM) N80E3 did not have a place for certification level.

3 Corrective Steps Which Have Been Taken and the Results Achieved The forms in Quality Assurance Section Instruction Letter (QA SIL) 10.2 have already beea revised to include this requirement and are being used. The division level document (DPM N80E3) has been revised to include this requirement and will be issued by April 30, 1982.

1 YM.._. h [

A.

M,

_.T' e

a 44.

4r

  • apt +*3W#'24' 4aWb 1waY.

S' E M-

^. -

'*#--y

=Who h

+

h '

1 0 <

4.

Corrective Steps Which Will Be Taken To Avoid Further Violations Use of correct forms will prevent further violations.

5.

Date When Full Compliance Will Be Achieved Full compliance was achieved on February 17, 1982, with revison of the forms in QA SIL 10.2 which are used by the inspectors during the performance of NDE inspections.

Exampic 2 1.

Admission or Denial of the Alleged Violation TVA admits the violation occurred as stated.

2.

Reasons for the Violation if Admitted There were approximately 13 electrodes which~were retrieved from the rod oven which were stamped with heat numbers different from the majority of the rods in the oven. The tool clerks were aware of the situation of two different heat numbers and made it a practice to physically segregate the rods. The clerks were negligent in maintaining these rods separately and there were no means other than taping them or wrapping them to keep them physically segregated. As a new rod batch was broken out, the pile rolled on top of the old heat number rods; and since they were not wrapped, the old rods' identities were lost.

3 Corrective Steps Which Have Been Taken and the Results Achieved l

l A survey was immediately conducted in the torus rod oven and approximately 13 rods were recovered, taped, and segregated until issued and used. Two rods that were confiscated were destroyed. A total of 36 sheet metal pans was made to keep the rods physically segregated in order to avoid the rods meshing together and their identity being lost. The rod trays were temporarily labeled with size, type, and heat number. The tool clerks involved were issued a verbal warning for failure to carr'; out their duties properly in maintaining physical segregation af the rods.

4.

Corrective Steps Which Will Be Taken To Avoid Further Violations The pans should avoid recurrence of this type. All clerks will be briefed on the possibility of mixing of rods when changing electrode batches. Additionally, outside the oven there is a diagram of the rod oven which clearly displays the tray arrangement.

5.

Date When Full Compliance Will Be Achieved Full compliance will be achieved by April 15, 1982, when the documenting of the verbal warning and the permanent stenciling of all rod oven trays will be completed.

DN-4 W