ML20054D868

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-261/82-10 on 820308-10.No Noncompliance Noted
ML20054D868
Person / Time
Site: Robinson Duke Energy icon.png
Issue date: 03/29/1982
From: Cantrell F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML20054D869 List:
References
NUDOCS 8204230461
Download: ML20054D868 (2)


See also: IR 05000261/1982010

Text

ellau)

.

MAR 291982

'

o

t

S

Carolina Power and Light Company

c3

ATTN: Mr. J. A. Jones, Senior Executive

RECEWED

Vice President and Chief

p

APR 221982>

-

, p ym mman $r

Operating Of ficer

"

'

411 Fayetteville Street

g

saap ummer a

Raleigh, NC 27602

ff

Gentlemen:

@

Subject: Report No. 50-261/82-10

This refers to the special safety inspection conducted by Mr. L. A. Franklin of

this office on March 8-10, 1982, of activities authorized by NRC Operating

License No. DPR-23 for the H. B. Robinson facility and to the discussion of our

findings held with Mr. R. B.

Starkey,

Jr.,

Plant General Manager, at the

conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection rcport.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously identified

enforcement matters and unresolved items. The status of these items is discussed

in the enclosed report.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written

application to withhold information contained therein within thirty days of the

date of this letter. Such application mJst be Consistent with the requirements

of 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

-~

F. S. Cantrell, Acting Chief

Reactor Projects Branch .

Division of Project and

Resident Programs

i

Enclosure: '(See Page 2)

l

02042899(M

_

q

f6ofQ

/

MAR 2 91982

Carolina Power and Light Co.

2

Enclosure:

Inspection Report No. 52-261/82-10

cc w/ encl:

R. B. Starkey, Jr. , Plant Manager

bcc w/ encl:

Document Management Branch

State of North Carolina

NRC Resident Inspector

RII

R

f5

RII

RII

C hub;.,

Y^

-

Af8M'2 /f2

RCBut'cher ,

FSCantrell

LAFranklin:es

r

J/i

3b6/82

3//f/82

3

/82

3/ 6/82

2