ML20054D735

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-269/82-08,50-270/82-08 & 50-287/82-08 on 820309-12.No Noncompliance Noted
ML20054D735
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 03/25/1982
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML20054D736 List:
References
NUDOCS 8204230333
Download: ML20054D735 (2)


See also: IR 05000269/1982008

Text

OFFICIAL COPY

MAR 251982

e

A

s

S*

s

Duke Power Company

RECEtVgg

ATTN: Mr. W. 0. Pa rker, Jr.

p

9

Vice President, Steam Production

2

App 22I982h

-

P. O. Box 2178

~

--

E

n% "

amud

p

Charlotte, NC 28242

Gentlemen:

'o

/f

Subject:

Report Nos.h269/82-D50-270/82-08 and 50-287/82-08

'

This refers to the routine safety inspection conducted by Mr. D. L. Andrews of

this office on March 10-11, 1982, of activities authorized by NRC Operating

License Nos. DPR-38, DPR-47 and DPR-55 for the Oconee facility and to the

discussion of our findings held with Mr. W. H. Owen, Senior Vice President,

Engineering and Construction, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinatinns of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no violations or deviations were disclosed.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Document Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter. Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. J. Long, Acting Chief

Reactor Projects Branch 2

Division of Project and

Resident Programs

<

Enclosures:

Inspection Report

Nos. 50-269/82-08,

50-270/82-08 and 50-287/82-08

cc w/ encl:

J. E. Smith, Station Manager

8304230 37 3

rec d'0"

_.

- _ _

_

_ _ _ _ _

__

_ _ _

_ _ _ _ _ _ _ _

.

.

MAR 2 51982

Duke Power Company

2

bec w/ enc 1:

NRC Resident Inspector

Document fianagement Branch

State of South Carolina

DEP, IE

Pacific Northwest Laboratories

RII:EPOS

RII:PRP

RII:PRP

RII:

RII:PRP

DLAndre s gr

AIga$nis

ant

n

s

FJL

3/p /82

3/13 /82

F3/ZJ/82

3/3J/82

3/2 /82

S

5

JPM 4 <

3/2yrz