Text
-
.
.
A bavd
MAR 2 91982
k
e
Tennessee Valley Authority
ATTN:
Mr. H. G. Parris
RECEIVED
9
Manager of Power
P-
500A Chestnut Street Tower II
.:
APR 221982> I
-
asumi T
Chattanooga, TN 37401
{ uma m
Tac
Gentlemen:
/f
,
Subject: Report Nos.
438/82-0Dand50-439/82-05
4
-
x _ _ _-
This refers to the routine safety ir,spection conducted by Mr. E. H. Girard of
this office on March 2-5, 1982, of activities authorized by NRC Construction
Permit Nos. CPPR-122 and CPPR-123 for the Bellefonte facility and to the dis-
cussion of our findings held with Mr. F. Gilbert, Construction Engineer, at
the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no violations or deviations were disclosed.
We have examined actions you have taken with regard to previously reported
unresolved items.
The status of these items is discussed in the enclosed
inspection report.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will
be placed in the NRC's Public Pocument Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written appli-
cation to withhold information contained therein within thirty days of the date
of this letter.
Such application must be consistent with the requirements of
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
F. S. Cantrell, Acting Chief
Reactor Projects Branch 1
Division of Projects and
Resident Programs
Enclosure:
See Page 2
g204 28 0~ ~2M
q
- rEo(Q
-
.
.
Tcnnessee Valley Authority
2
MAR 2 91982
Enclosures:
Inspection Report Nos. 50-438/82-05
and 50-439/82-05
cc w/ encl:
H. J. Green, Director of Nuclear Power
A. M. Qualls, Plant Superintendent
W. R. Dahnke, Project Manager
D. L. Terrill, Project Engineer
J. F. Cox, Supervisor, Nuclear
Licensing Section
H. N. Culver, Chief, Nuclear Safety
.
Review Staff
bcc w/ encl:
NRC Resident Inspector
Document Management Branch
State of Tennessee
.
RII $r
0?$
RII
RII
RII
g
RC(rlenjak
f
EHGirard:ht
ARHprdt
FSCantrell
3/ 4/82
3/)t/82
3p82
3/g/82