ML20054D672

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-438/82-05 & 50-439/82-05 on 820302-05.No Noncompliance Noted
ML20054D672
Person / Time
Site: Bellefonte  Tennessee Valley Authority icon.png
Issue date: 03/29/1982
From: Cantrell F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML20054D673 List:
References
NUDOCS 8204230260
Download: ML20054D672 (2)


See also: IR 05000438/1982005

Text

-

.

.

A bavd

MAR 2 91982

k

e

Tennessee Valley Authority

ATTN:

Mr. H. G. Parris

RECEIVED

9

Manager of Power

P-

500A Chestnut Street Tower II

.:

APR 221982> I

-

asumi T

Chattanooga, TN 37401

{ uma m

Tac

Gentlemen:

/f

,

Subject: Report Nos.

438/82-0Dand50-439/82-05

4

-

x _ _ _-

This refers to the routine safety ir,spection conducted by Mr. E. H. Girard of

this office on March 2-5, 1982, of activities authorized by NRC Construction

Permit Nos. CPPR-122 and CPPR-123 for the Bellefonte facility and to the dis-

cussion of our findings held with Mr. F. Gilbert, Construction Engineer, at

the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no violations or deviations were disclosed.

We have examined actions you have taken with regard to previously reported

unresolved items.

The status of these items is discussed in the enclosed

inspection report.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosure will

be placed in the NRC's Public Pocument Room unless you notify this office, by

telephone, within ten days of the date of this letter and submit written appli-

cation to withhold information contained therein within thirty days of the date

of this letter.

Such application must be consistent with the requirements of

10 CFR 2.790(b)(1).

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

F. S. Cantrell, Acting Chief

Reactor Projects Branch 1

Division of Projects and

Resident Programs

Enclosure:

See Page 2

g204 28 0~ ~2M

q

rEo(Q

-

.

.

Tcnnessee Valley Authority

2

MAR 2 91982

Enclosures:

Inspection Report Nos. 50-438/82-05

and 50-439/82-05

cc w/ encl:

H. J. Green, Director of Nuclear Power

A. M. Qualls, Plant Superintendent

W. R. Dahnke, Project Manager

D. L. Terrill, Project Engineer

J. F. Cox, Supervisor, Nuclear

Licensing Section

H. N. Culver, Chief, Nuclear Safety

.

Review Staff

bcc w/ encl:

NRC Resident Inspector

Document Management Branch

State of Tennessee

.

RII $r

0?$

RII

RII

RII

g

RC(rlenjak

f

EHGirard:ht

ARHprdt

FSCantrell

3/ 4/82

3/)t/82

3p82

3/g/82