Forwards Updated Completion Schedule,In Response to 820317 Request,For NUREG-0737 Items I.A.3.1,II.B.2,II.B.3,II.B.4, II.E.1.2,II.E.4.2,II.F.1 & II.K.2.10
ML20054C288
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 04/14/1982
From: Mardis D
FLORIDA POWER CORP.
To: Eisenhut D
Office of Nuclear Reactor Regulation
References
RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.3.1, TASK-2.B.2, TASK-2.B.3, TASK-2.B.4, TASK-2.E.1.2, TASK-2.E.4.2, TASK-2.F.1, TASK-2.K.2.10, TASK-TM 3F-0482-15, 3F-482-15, GL-82-10, GL-88-05, GL-88-5, TAC-49544, TAC-49573, NUDOCS 8204200311
Download: ML20054C288 (4)


Text

-- _-

2,e90%

[MhNo vit SWh kfffk ,w (S?

TQdit;Q/QM "dp%

l w ars M

Power C O n p o n a T e o se April 14,1982

  1. 3F-0482-15 g g File: 3-0-26 S  %

Mr. Darrell G. Eisenhut, Director A 'ICGIVED -9 Division of Licensing ,

~

Appyg7N h _

Office of Nuclear Reactor Regulation m e-m --

U.S. Nuclear Regulatory Commission 8Ceikp#

Washington, D.C. 20555

% /

Subject:

Crystal River Unit 3 p /'

Docket No. 50-302 Operating License No. DPR-72 Status of NUREG-0737 Items

Dear Mr. Eisenhut:

By letter dated March 17, 1982, the NRC requested an updated completion schedule for selected NUREG-0737 Items. The schedule is to include: (1) confirmation of and date of completion for completed items; (2) completion schedule for incomplete items; and (3) justification of delay and interim measures being taken for incomplete items not scheduled for completion before the NUREG-0737 implementation date. Florida Power Corporation hereby provides the attached schedule and comments in response to this

information request.

i If you have any further questions, please contact this office.

l 1

Very truly yours, S 0 mE David G. Mardis Acting Manager Nuclear Licensing Enclosure RAW:mm cc: Mr. J. P. O'Reilly, Regional Administrator f

pvh Of fice of Inspection & Enforcement i U. S. Nuclear Regulatory Commission fp 101 Marietta Street, Ste. 3100  ; ,

i Atlanta. GA inin3 8204200311 820414 PDR ADOCK 05000302 P PDR Ueneral Office 3201 Thirty fourth Street South e P O Box 14042 St Petersburg. Florida 33733 e 813-866 5151

STATE OF FLORIDA COUNTY OF PINELLAS D. G. Mardis states that he is the Acting Manager, Nuclear Licensing, of Florida Power Corporation; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief.

f

/_ - e4

. G. Mardib Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 14th day of April,1982.

Y{LMfdGY h- A M T-ru

'Notp'ry Public Notary Fublic, State of Florida at Large, l My Commission Expires: May 29,1984

. -- - - - . . . - . - ~

ATTACHMENT ITEM TITLE DE_ SCRIP flON STATUS / REMARKS CURRENT SCHEDULE I.A.3.1 Simulator Inclusion in Simulator Exam inclusion in NA Exams Licensing Exam Licensing Exam completed on 10/1/81. Item complete.

(Reference our 12/23/81 letter.)

II.B.2 Plant Waste Disposal Complete per our 10/2/81 letter. NA Shielding Panel Valve Operators Recently received equipment in Qtr. 3,1982 process of being installed.

Interim measures (NUREG-0578) still in effect. (Reference our 1/6/82 letter.)

II.B.3 Post-Accident Upgrade Post- System design and procurement Refuel IV Sampling Accident not complete. Interim measures (March 1983)

Sampling (NUREG-0578) still in effect.

System Installation is partially complete but will require refueling cutage for final installation.

II.B.4 Training for implement Mitigation of core damage NA Mitigating Training included in Hot License Core Damage Program (Replacement) Training Program and Operator Requali-fication Training Program on 10/1/81. Item complete.

II.E.1.2 Aux. Feed- Upgrade to System design complete with R'efuel IV water Initiation Safety Grade procurement and installation (March 1983) and Flow ongoing (reference our letter dated 3/11/81). Interim measures (NUREG-0578) still in etfect.

II.E.4.2 Contair. ment Lower Contain- Original setpoint meets intent NA Isolat!on ment Pressure of requirement. Item complete Dependability Setpoint to ' per our 12/13/80 letter.

Level Compati-ble with Norma!

Operation Isolate Purge Required system already NA Vent Valves on installed at time of NUREG-Radiation 0737 publication. Item Signal complete per our 12/15/80 letter.

1 4

, ~ , - , - - . - - - , .

9 ITEM TITLE DESCRIPTION STATUS / REMARKS CURRENT SCHEDULE II.F.1 Accident Noble Gas In progress. Awaiting design Refuel IV Monitoring Monitors changes and equipment (March 1983) delivery.

Iodine Monitors in progress. Awaiting design Refuel IV changes and equipment (March 1983) delivery.

High Range In progress. Awaiting equip- Refuel IV Radiation ment delivery. (March 1983)

Monitors Containment Installation partially Refuel IV Pressure complete. Awaiting delivery (March 1983)

Monitors of relay racks.

Containment In progress. Awaiting design Refuel IV Water Level changes and equipment (March 1983 Monitors delivery.

Containment in progress. Awaiting equip- Refuel IV Hydrogen ment delivery. (March 1983)

Monitors NOTE: The complete installation of all accident monitoring systems requires a plant outage for access to the containment building. Refuel IV is the next scheduled outage in which the installation of the monitors can be completed. Should an outage occur prior to RefuelIV, those modifications that can be completed within the projected duration of the outage will be done. Interim measure (NUREG-0578) stillin effect.

II.K.2.10 Safety Grade Install Antici- Anticipatory reactor trips NA Trip patory Trips installed by 12/13/81. Technical Specification under development.