ML20053E589
| ML20053E589 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 06/04/1982 |
| From: | Mardis D FLORIDA POWER CORP. |
| To: | Eisenhut D Office of Nuclear Reactor Regulation |
| References | |
| RTR-NUREG-0737, RTR-NUREG-737, TASK-1.A.1.3, TASK-1.C.1, TASK-1.D.1, TASK-1.D.2, TASK-2.B.1, TASK-2.B.2, TASK-2.D.1, TASK-2.F.2, TASK-2.K.3.18, TASK-2.K.3.30, TASK-2.K.3.31, TASK-3.A.1.2, TASK-3.A.2.2, TASK-3.D.3.4, TASK-TM 3F-0682-01, 3F-682-1, GL-82-05, GL-82-10, GL-82-5, TAC-49544, TAC-49573, NUDOCS 8206090048 | |
| Download: ML20053E589 (4) | |
Text
'
I
.cnc2 pk:d !
-$" "O f
q p..
r
. n. Z,.
LQ Q9),
vy S W W;& 5$'z,
&
- f:2 P
r g-y>;AG M
Power c........_
June 4,1982
- 3F-0632-01 File: 3-0-26 Mr. Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, D.C. 20555
Subject:
Crystal River Unit 3 Docket No. 50-302 Operating License No. DPR-72 Status of NUREG-0737 Items
Dear Mr. Eisenhut:
By letter dated May 5,1982, the NRC requested an updated completion schedule for selected NUREG-0737 Items. The schedule is to include: (1) confirmation of and date of completion for completed items; (2) completion schedule for incomplete items; and (3) justification of delay and interim measures being taken for incomplete items not scheduled for completion before the NUREG-0737 implementation date. Pursuant to 10 CFR 50.5te(f), Florida Power Corporation hereby provides the attached schedule and comments in response to this information request.
If you have any further questions, please contact this office.
Very truly yours, d
David G. Mardis Acting Manager Nuclear Licensing Attachment g
GF:mm cc:
Mr. 3. P. O'Reilly, Regional Administrator Office of Inspection & Enforcement U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 3100 Atlanta, GA 30303 8206090048 820604 PDR ADOCK 05000302 P
PDR General Office 3201 Tnirty-fourtn street soutn. P O Box 14042 st Petersburg. Florida 33733 e 813-866-5151
1 f
STATE OF FLORIDA COUNTY OF PINELLAS D. G. Mardis states that he is the Acting Manager, Nuclear Licensing, of Florida Power Corporation; that he is authorized on the part of said company to sign and file with the Nuclear Regulatory Commission the information attached hereto; and that all such statements made and matters set forth therein are true and correct to the best of his knowledge, information, and belief.
Yl D. G. Mardls Subscribed and sworn to before me, a Notary Public in and for the State and County above named, this 4th day of June,1982.
(
4W Notar Public Notary Public, State of Florida at Large, My Commission Expires: May 29,1984
STATUS OF NUREG-0737 ITEMS June 4,1982 ITEM TITLE DESCRIPTION STATUS / REMARKS CURRENT SCHEDULE LA. I.3.1 Limit Overtime Limit overtime in in compliance with Item cvmpleted accordance with Generic Letter No.
prix to receipt NRC policy state-82-02 (dated 2/8/82) cf your letter on ment 2/15/82 L A.I.3.2 Minimum Shift Crew Augment current implemented in Complete per shift staffing CR-3 License your 4/17/81 Amendment No. 38 letter I.C.1 Emergency Procedures Abnormal Transient In progress Spring 1983 Operating Guidelines Refueling I.D.1 Control Room Design No reply required N/A N/A Review at this time I.D.2 Plant Safety Parameter No reply required N/A N/A Display Console at this time ll.B.1 Reactor Ceulant No reply required N/A N/A System Vents II.B.2.3 Plant Shielding No reply required N/A N/A Pt. 3 Environmental Qualification ILD.I.2 Relief Valve and Submit Plant Report Report submitted Complete per our Safety Valve Test on RV and SV Program on March 31,1982 3/31/82 letter Programs II.D. I.3 Block Valve Test Submit results of tes* In progress July 1,1982 Program program II.F.2 Instrumentation for No reply required N/A N/A Inadequate Core at this time Cooling
ITEM TITLE DESCRIPTION STATUS / REMARKS CURRENT SCHEDULE II.K.3.18 ADS Actuation item not applicable N/A N/A to CR-3 II.K.3.30 SB LOCA Analysis Revise SB LOCA Difficulties with August 31,1982 Methods model development have changed the completion date from June 1,1982 to August 31,1982.
II.K.3.31 Compliance with Submit Plant specific To be initiated January 1,1983 10CFR50.46 analysis upon completion of item II.K.3.30 III. A.I.2 Staffing Levels for Provide augmenta-Included in FPC Complete per our Emergency Situations tion of Staff Radiological Emer-2/16/82 letter gency Response Plan Rev. O l'I. A. I.2 Upgrade Emergency Complete Facilities to be October 1,1982 Support Facilities modification complete except for and Spring,1983 RECALL - to be in-Refueling stalled in Spring 1983. (Reference FPC letter dated 1/6/82)
Ill. A.2.2 Meteorological Data Complete in Pcogress. Clari-July 1,1983 modification fication from your Staff indicates that the scope and sched-ule for completion of this item is satisfactory.
III.D.3.4 Control Room Facility modified Chemical Monitors July 1,1982 Habitability by Licensee study to be installed.