Partial Chronology Re Allegation Concerning Core Drilling Through Rebar in Reactor & Offgas Bldgs at Facility.Related Info Encl
ML20053D732
Person / Time
Site: LaSalle  Constellation icon.png
Issue date: 05/11/1982
From:
NRC
To:
Shared Package
ML20049J771 List:
References
FOIA-82-168 NUDOCS 8206070263
Download: ML20053D732 (72)


Text

{{#Wiki_filter:Do Nof D4c/ou PARTIAL LASALLE CHRONOLOGY 11/7/75 off-gas roof poured.

9/25/79 CECO QA notices surface cracks on underside of off-gas ceiling.

7/31/80 work at LaSalle due to injury. 1/26/82 Doug Longenie (Channel 5) call to Warnick, 1/28/82 Warnick memo of Longenic call. 2/3/82(?) First show of Channel 5 " drilling for dollars" three show item. 2/4/82 Foster call to 2/22/82 J. Goodie (Ill Att. General's office) calls G. Phillip. 2/23/82 G. Phillip returns Goodie call following contact with R. Walker. 2/16/82 Phillip memo of Goodie call (Foster is at Ginna). 3/6/82 J. Goodie calls Foster. (date in error? Most likely 3/5/82). 3/8/82 J. Goodie calls Foster, mentions " nuclear experts" 3/8/82 Foster calls 3/10/82 CECO checks off-gas building roof thickness. 3/13/8Eoster memo of J. Goodie, calls. 3/16/82 Date of affidavit. 3/17/82 Date of affidavit. 3/18/82 G., die letter to NRR (not known in RIII), documents phone call to EdVrnia. 3/22/82 Goodie letter received in NRR. 3/22/82 Date of Warnick discussion with Norelius re allegations, inspection. 3/24/82 date of Illinois Attorney General's petition. 3/24/82(?) F. Hawkins to site to review concerns. 3/25/82 Warnick memo to Norelius sends memos, requests inspection. ARM form. 3/25/82 Illinois Att. General's office press release. ' 3/25/82 RIII learns of press release through media inquiries at approx 2 p.m.. 3/25/82 RIII sends PN to headquarters at approx. 4:30-5:00 p.m.. 3/26/82 Foster call to J. Goodie. 8206070263 820511 fhg PDR FOIA KODNERB2-168 PDR

2 j .sw 3/26/82 meeting in RIII to review RIII handling, need for IE assessment. 3/27/82 CECO survey of underside of off-gas building ceiling for cracks. - 3/29/82 Conference call (Denton, Case, Stello, DeYoung, Keppler). 3/29/82 CECO makes additional off-gas ceiling t' ickness measurements. 3/31/82 Foster memo of J. Goodie call of 3/26/82. 3/31/82 Meeting in Bethesda (RIII, NRR, CECO, J. Goodie, ) 4/1/82 Shoemaker in RIII, 4/2/82 Shoemaker to site. 9 7 -m

,7g NONC$0RMANCE REPORT FOR CONSTRUCO IND TEST Cemmemith dison T % 33. 2 t ,, g men maafMD; t'217W'Y+h'EmM44 M 1 N I a [O I N Mr9 W O M

  • H 3MW F1MMJWAWS tWAWtW6M W#End " '

3. DticI.PfloN of 6tLM (lowiP**tNI. a4att e.at, cowPomet N1, Pastg gitan NQ,Pagg NQ,gga NQ,LQylP HQ) a.

mje, a A a s was_,c.- u.aa s e

$Ylitaa AND LpNit 3. s 4. ma&Nyf aCryttt/$ PP&itt P.J / A N/A_t A C wL C.

s. CattGoer Dawct O umai coNDaisoN 9 OeitretD D;eNG

% DwG NONCONeos=Nct DistCT Docuel N1s TION C SUPPtite iNSPIOloN O CON 1LAClos saituet SPtc NoNCoNsonwhct @ CON 51suClion O ttst

10. Ot$CaittioN of NoNCONFon%ANct it.

P.O. Na a P.O. alt aa No.

12. acto tag N4 12, wona stoutti s.O VC4d d ts c mmb du-Jm g (,, g,

y /A g4/ LaJ M. Y C-t A (; CD Oe./C ta sWS \\tA bit kk.Atk t-Na aat Diraa MENT Dalt i i 1 bC LA. Ct mo C" c.acf c_ 0 a ev 5Cb

  • 3k' ~* I see c-hke ct. vias L C-L.6

~0~c,;;. gbyg,f3;/A Q l.

  1. eh7 Ycssw o u,

_ca scPv c,a b IC C 07. O m. (f 77 a $ciY EGu. a v c _ _ ms. -wom.m -,m:-.mes i, m mm-, _m... is. CAust of NoNcoNf o4MA'{t

  • ^C / C \\f h*S C.b c1c_

( tGA g.. f i so, action stoviato to ccad &*a,- - ~:r v.T t b /cpgh L )O Ak eT C3 s.4 % m 4 cb Jo L e obwa t.t Sb c,w Ce sbu.ch Cc .q M c f.

  • a 2_. M f, L.S4L 12E-

,t.ht % h, tr. contactivt action ELC@ltQ 10 PItVENT 8tCyge[Nct of NONcoNf o8%aNcl(*4#tt N/a sp NOT E NQwN) b e e. Uc) s k bo s.s sk J wA.C.d ( c A. (c (M h.d C.[6 I $ ~1 ... m itw a~D a,,.o.at .,,,,0,,%bA lo/3 J E W e l A k /3/ n,,,,e,,,,,, 0. ko& /n/:y -rsnists.'ea.r. Penirev r.. i.. r r.- case ING. Nit eiNG ctPasimi r.i' araD ca*( 'ar-Til" emu:.aWs5HfNTMst#19WM BRi eMilN2M(e} 'h E ti[eliMFr?IfM@&rN@ia9fa%5m%'l4MMT1 Pa" d to. OtscaiPiiou of Action 1astN to CCastct tat NoNcomon%aNct Ote WM s Demuk C4.7 Ot L pcJ (* U h 1 sA E t O.Tt3C.C C JCa C3 0 J (* e. t g a u I5 CA A.3 M & i?_ CL.k-NC..kb C Ct\\*> - OM M,wq, LAC. t e..A i

20. oticairlioN of coastClivt aClioN INitialtD to Pet.tsi etcosalNct

( C)V\\ C/ c. C f Ct.A3 % W e > s' / 414 AS t.1C k e ( ded" k O s a .

  • -a C-La A C +3 M c2 4(32 sk f

121 Di5PolilioN CourttitD tv:

22. DiiPosit N

Pri t e ' s^ to tre b.Ncad DCD ll Cik77 f7 a.a os oe e..T ur Ni ' oeve 1; aw c r!+.u huci o~ soost ci INae~t a s / 4asa a - P.3*'M?_5N',"ITA'MMMYh*MMJIde}ll:I:(eii k'l:(.T.Isil {e]2 WpZ@_WS WAQMy;UWGMWiJWTyaJ P a o.

23. Cosatctivt action (c/A) atview

/

  • h' '

Q ((=/C - ? ? jgf Ma~~' ~ '~'

e lE73 nov. 1 Y O!Gil COUStrUCi!OD CompaDV i l A Usva34DH OS guy F. ATKINSSN COMPANY iss I .W" > l 1 d NONC ONFORMANCE REPORT r CONSTRUCTION COMPANY 8$ Walsh No. 132 Date 8-23-77 l. EAElbu ur.5CRIPTION OF NONCONFORMANCE: During a patching operation on Reactor #2 containment wall a void was located at approximately 156 ( void centerline) beneath the corbel for beam No. 2RB-435 and contained in pour No. 2RCWllC poured on 10-12-76. (See attached reference figure 1.) Nenconformance identified by: Walsh Q.A. Depa-tment 8-23-77

Title:

Date: PROPOSED ACTION AND/OR PISOLUTION: Reform area of void and pressure grout with Embeco 636. Conduit will be placed in void through the form (see attached Figure II. Det. A.) for bleeding trapped air. The grouting operation will continue until grout g flows from the bleeder. The form will rarain in place the. duration of the cure period, then removed and the bleeders trinmed flush to the call. I STEPS TO PREVENT RECURPINCE: Reinstruct concrete. crews of proper consolidation practices and to maintain close Q.A. observation and direction. 3 e.c. C. E. G. M C.(2. N h ct l I , APPROVAL:' F /O.S [7) Date WALSH QA e e OWNER be d. n,/ det.CChADate 10 i'l 7 7 k.,J k Q % nn % f.% V p, j x REJECT / REPLACE l l ACCEPT AS GS l l REPAIR l - ' ) CORRECTIVE ACTION VERIPICATION: WALSH QA ed/r. //I. .Date // 77 f

/ I) 15 (.' s. V Ett v. (BOT. 5 LhP.) 76 l' . '.i - i' ' 2 R B-435 i 3'-8 '" N 3'- 0" = A-( A pC.- 9 f'_ /' ? f.g" g u-Z'- O,, I PIPE SLEEVE l N J A-2RB-435 1 ?@,n i s

r. s db hhh

.r'Se ij ~. --.- A I ~ ~ 1'- 10" p= DET. - A F i c, I .f/79 'l*- .w--- - - - - ~ ~ ~~--

(z') () ~ ,.[,:....' i l A9 (Pm T e-3 / mi t 1 exierenc i PtPE -e 1 g- ~ xfk-x 4.o g-. ) 2 '- 6 / nPPRoY. g1 i .p ro3:j,,. s,. -,, i / /Q j ^ r 7 Q qrg_... 1 7 h.ij i ee FOR ^ INF02MATHON guv 1 ] $3 I I Fie I 5 /77 -.N* m

'5** '.iJ ij: Septen.ber 16,197/ Cargent f. Lundy Engineers 55 East }baroe Street Chicago, Illinois 60603

Subject:

IaSalle County Station, Units 1 and 2 NCR #179 Attontion: fir. E.li. Wetver Gentlemen: Attscaed is a co;.;; of HCit #179 re;;ardinc a void in the Unit #2 Contain=ent concrete. I'lcoac review the proposed resolution and give us your engincorind reco ::.ondation. Ve:-r truly yours, JE NG$ T. ':.

7. a tt s General Ocaign Engineer 1

P.TJ/ayp l Attach. GR.4y. ~ INFORIAAll0H ~ ONLY L .b77 ~. . x..

,p'/...- d. .S..@.1 y,,,,.r,.,$< SARGENT & tuNDY 3 ENGINEERS '

  • l.I ' ! d *J '

g, 55 E AST MON RO E STREET J gg i(( CwlC AGO. ILLINot s 60 60 3 [r, p.,., o f gk'g'. s Teterwonc sia a6e.aOOO . 5 ). 0 ,e.. [{,; ;.,. ' 1.1, 1.15.8 ,- 1. f - '.* 4.. i . UD .u Q f0'-

c....:,h *[.7 '. o i t:.,;.t..%,,-

i

n. ;.

.p...u September 22, 1977 .,y. 4,' ! '..; ',;',. F - Projeet Nos. 4266, 4267 .,1 ' v. c. e i' .,'y.$,. J qh ,g ;.,..'3., Commonwealth Edison Company .. F. s..' LaSalle County Station - Units 1&2 .t '1 i}l1z,:Qy*HCR'#179 r,.i,,e :.., -. - 1 ;,2.e.. - g; u. s e. .t...-+...g..; Mr. T. E. Watts General Design Engineer i 'Y.Y t...eCommonwealth Edison Company f 3!!'tP. O. Box 767 Chicago, Illinois 60690

Dear Mr. Watts:

We have reviewed NCR #179 regarding the void in the Unit 2 containment wall concrete. We concur with the proposed repair procedure, and have no additional comments to offer. . The structural integrity of the Unit 2 reactor conta nment will not i .be. affected providing the repa rs are comp e el t d as outlined. i 4 Yours very truly, .g: s, '., '. ':,0-V. Reklaitis

v. wums a..

.s. M l.!l.;' ' :s. EI h.- Structural Project Engineer M VR; cah.

-9 '., 'iIn duplicate

...i

Copies:

":' ':..'. :,' L. J. Burke B. M. McCann E. R. Weaver '),.. ;- [ ::i<.-! D. C. Haan %S LMh ,b,

.?
.S.'M.'Kazmi Q

j Egsg g' ,f E. R. Kurtz ~ .L. .. e 4 -

ys'

..:.J..). .0,i.' o .r,.

  • s.

.,.. u'. ng/.. e-

yfe .p.% Y. em h/ A & H cNGINEERING COR6 0 An GON i k'"f:.'i.1.*.**I". AFFILIA1ED OFFICES e BUFFALO, NEW YORK - ROCHESTER, NEW YORK I penteeristm BLL. E A S T PE Ont a. GLL. S PalNG F eE L D. O L L, CAADONDALE.9LL, C HIC A C O. ILL. COLUnseue,gueO wi t, L a F A T E TT E. IMO. pop (Egg $1139 EtP CODE 48408 ISP CODE 4 3 703 Ier CODE 4390s Ier LODE #0434 38P CODE 43339 1sP CODE 4790s peg 3 N. ts& Git t T 97. e901 M. as a sse o f. Sta N egT ee en8e L awte tapeg paea w. es taeosef art 990 r eta wa v om. N. asse M. wt stgNN AWS. Psecest 83173 sga. pose PMONE $ 3099 #94 4 346 PMOest #3 5 7 3 e44 4e4 3 Po*Oest s e le t 949.f303 PMoset e s ta s e 37.seco PMont etest see.ee35 PoeON E e28 7 t d e a.4 tla REPORT OF CONCRETE PLACEMENT ESTED FOR: Commonwealth Edison Company DATE OF POUR: August 25, 1977 Chicago, Illinois ROJECT: LaSalle County Station REPORT NO.: D-101 846 Units 1 and 2 Part3 of 5 Page 3.1 EMARKS: The following is a summary report of concrete inspection performed on the above date. Tests performed in accordance with TP-I>-101 SAFETY ' t IT8 U n 'O D T i ~~ DATCH PLANT INSPECTION MiF 4-#0Bt.kJWasign s.s.a./ Cubic Yard Brand / Source I NIETE CLASS: BA-45 CD m f, Ibs. 58 5 IIllinois Coment TypcI Peru,r 7IAL Cu. Yds.: 272 F.A., lbs. 1420 Conc. sand / Mat. ser. Yd. u 32 ),IDADS: 34 C.A., lbs. 1730

  1. 67 Crush ed stone /Ma t. Se r. Yd.

lant: Walsh WRA, oz. N/A Pozzolith 300ri/Mst. Bldre, j GNIC IMPURITIES: Lighter than AEA, oz. 1.2 Amex / Amer. Admixtures Standard . Water, Gal. '1btal 35.9 on site Well #2 FLY ASH, lbs. N/A Chicago FlyAsh/Will Co. Stc; EEGATE GPADATION - is PASSING EVE SIZE 100 50 30_ 16 8_ l 4 3/8" 1/2" 3/4" 1" F.M.i Moisture B .A. (Spec.) 0/10 5/30 25/60 50/05 80/10095/100 100 2.3/3.1 N/A ,A. (Field) See page J.1 to i ,A. (Spec. ) o/s _ c/lo 20/s5 90/100 100 N/A ,A. (Field) I to werpTrn / WM SH-QA nuww --,,,, ~ FIELD INSPECTION WF ) 3 CATION OF POUR (S): Auxiliary Building #2 Slab, Lines"21-24"and"N-R", Elevation 749'; (2A1431-A (40k W. s ST CYLINDERS CAST 'IOTAL CONCRUTC BA'IEHED (Cu. Yd.) : .m UP EO. (S) SI) MP " AIR is CONC. TEMP. F RSIECTED (Cu. Yd.) : h i I-25-6-II 3 3.5 75 i - 2 5-6-I 2'd 3.9 69 'IUTAL CONCREFE PIACED (Cu. Yd. ) : 260 2-25-6-11 3S 3.8 67 REMARKS: see ramrk sheet 9 e f i l n t Concicte $ pervisor M MA['&M~ ~ BY: b Quality Control Supervisor

.I.- ..\\.- g; /,j[jy' ' j 14 Et l'd l:W(L5D W E .il0Pd6.3 CO8PORAT[O[d g-t. 7:'~.';r p'...", AFFILIATED OFf CES BUFFALO, (U.W YORK ROCitESTER, NEW YORK I o ~ _J P..* _J., PE O... _.} _l J __ l J, L.,. v.t F, C. G g. % P *..e.... L ..L.L. i, co or..... LL. ... e. 2 o.,n. O. .L L. .,.,e.,...3 gry canho O.L., r-o-s.e ....L L.

i. i, r. O....ca..s.....,...

i.e e.ont.cc.... C..s .t k. COL ua. U.. O...O -L. o.1 3 - c.on.. l i.,coc.c.... ...a.-..... .. ~ .....i.- . c-c...u...in..... o - c.......n... ,-O .ve. -o- ,33. - c...........n -o~c... i ..........na l.- REMARKS SHEET ) ,,. TESTED FOR CommonWoalth Edison Co. DATE August 25, 1977 b-L ,[,, y-7, m Chicago, Ill, 2 .3.;. RELA"ED

PROJECT LaSalle County Station OUR REPORT NO. '

D-101 846 ~. % - Uns.ts 1 and 2 , y, Part, 3,, of c;,_ Page 3.2 ." RE!/.AR KS: , IOCAfIQ4* Auxiliary Building #2 Slab, Lines "21-24" and "N R", Elevation 749; 2A14Sl-A (4000) y'..- Approximately 12 cubic yards of D?-45 sent to location Miscellancous Non-Structural; Tickets #A15870 and A15871 ? Approxirately 4 cubic yards of grout placed at location 2A14S1-A not . f.: included in any of the above totals; Ticket #A15789 m.u.,.,:... .... ~ 1 e.- ..v., .s t.~. . ~.. qg..sem.ma w=:..am=.w..rm.aaw.mcmsn.i.m. n=m m.wm+ - x.m-r. w. p*...,. A *.. . o n%. .e. ..#.'a.

u...

ACCEPTED /,ygsB@ ,n -f.[ .~ \\','4 :- v... f,.r .a N..{[ A & H Form No. D-lOl-2 Ulc V. 4) t

=====.

DATE

  • 8-2577 _ LOCATION 3,,,414nry Bui1rling !? ninh. T innn a21-24" anr1 "N-R". Elevatis j

~749 '; 2nl4SI-A-(4000p CONCRETE CLASS nA-45 (445.1) S A,.t,n 'lii- .o Part3 of_ 5, Page_ 3.3 { ] NUMBER TICKET ' SLUMP. AIR CONCRETE AIR UNIT CONTENT ) TEMP. TEMP. WEIGl!T REMARKS t P P LBS/I'T3 8l MpPrTPTr A'PTON ?-A 3-5 7 r,0 Mnv. p /3 N/A N/A 3 A15791 3 3.5 75 80 N/A Cyliniers made A15803 2-3/4 3.7 73 79 WA N/A' A15814 3\\ 4.3 68 78 WA lyA A158'26 2 3.9 69 77 N/A Cylinders mde A15842' 3 3.7 69 74 N/A IVA A15850 3 3.8 67 72 N/A Cylinders mde Jf.A15865 3k 4.0 69 72 N/A N/A .t ^\\ .s s,m> < r:sg.c '.:. wpm: < Mav-3; W~'s''"'*--+' '~ Af((fl[,) / k.. *.i N I'

  • 9 lb ' ? )

A & II Form No. D-101-3 (Rev. 4)

nt / Walsh Construction Company / p yg,,7,,4 A DIVISION OF GUY F. ATKINSON COMPANY @est Qancesi Stxonger, T. W. H ALLIG A N THORNDALE CIRCLE w ygg3.p,,,gg,,as

putt, DARIEN. CONN. 00820 C. C. SCHW(N 855 7781 N. C. WILD E 781 THIRD AVENUE
  1. g g

NEW YOR K. N. Y. 80017 y p, W. A. DUR KIN. J9 O / I * O n T.J.McGRATH 2400 CUMDERLAND DRIVE @.E.ORR YALPAR AISO. INDIANA 46383 W. J. WHITE (21st AS2.Stel Cear.eller 3 707 8. STREET. N. W. 0.0. BURR WASHINGTON. D. C. 20036 (202) 833-9768 10 WEST ORANGC AVENUE SOUTH SAN FR ANCISCO. cal.IF. 94089 ~ OFFICE AT: R. R. #1 Marseilles, 71. 61341 GENERAL 1. 'Ihe vibrator should be placed in the concrete rapidly and should penetrate at least six inches into the preceding layer if there is one. 2. The vibrator should be held stationary for about 5 to 15 seconds. 3. The vibrator should not be inserted within two feet of any unconfined edge. 4. In thin slabs the vibrator should be sloped toward the horizontal . as necessary so that it is fully embedded. 5. '1he distance between insertions should be such that the areas visibly affected by the vibrator overlap by a few inches. 6. When concrete piles up (for example at the end of the pump line or a trenie) this pile can be leveled by inserting the viarator into the pile to " melt" it down. But concrete should not be noved horizontally with the vibrator. 7. If concrete must be noved horizontally a shovel should be used. AII

..4 3 .'e

4.,,g.,

e 4 * . g p' e** g

    • ,.?

e' e, . **.o e s. . s. -w ..= e .:.. T. ~. - v*

  • j.

= ,{ ,e .. e. .t .*6 ., s . p. e.,

  • I s*

. a.% ~. r-

  • . t.

.ge e t r.- d. .e. e-,- s.e g .. e*. e .e ..

  • g.8.e*

. e e *4 .g* .e,.'

  • e

~

  • e.

.g,

7. t

,e e i. s .e 4 b

  • ..9 -

g s

6. e
  • .w-

= = "

  • e

\\ * ~e (, _ m se 4 e L y e (e ..t e$ e .e* A 6

  • e a*

ee s. A p e e ,' 4 d .h o o n eof *OO e

  • 9.'n % $ s 4

g n ~ o . =, 7 -. a.e p

  • e.. e. b,

ge e *e O .d e' A .. c. . N. e ,t e e .g l9

3..

e.. .c eg e ..= = t-9 e l e. .4 e I e .e, e e m A I. ' i e*9 A N '6 I e e m* - e Oa e Oa 4 Q s e-. *. ( e,g e**,*

g

= , e e e. .J. r ..s'.. g* *s.

  • s-a

.,.e .-., 1.. e. V * .g.. / .g e.. . ?. .* e e .e,. ,,...*,.,......s v . g. g = = * % 1*

  • e..*..

e- .4 a **g =* 8 g 1, . 3 3 = .e..,...4 .8 9 e e s e e e s 4 J N. . r. m. L O

.s

s. e *p..(
3

-2 9 s s*

  • 1,

.*/ ?,*,*,," g. ..e. .g*.. 5. e t .e ' . e.. ,c 5 s.

  • .t s.

.e s . s. 3 ] . *

  • J.;.

s s* y .y ..z.,

  • .* o *

.,..a .a. ,3 .4* I_ r. .,4.. .J. A.

s. r..

.,.t. s.a. 6 ) L; .* *;- * : y..>,.. *

    • o

~* 4 4 - n... =

  • .. a

~..g 8,. s-

p..

J: ,6 . ^p**.*..,,.*'* e., s (.'. '. ..t.. ..r e.

  • . =...,.

)....' -5 8 ... *a *.- 9 if V'. -i(* a ,,. 7,;.v *.. I g 4 *.. * .t.. ~ ~. o 3 s. y s. ,. :1,

  • c -..,
5.. -

i, a s.- g r. , f. 4a=<'.., y s i > ; '6. * . g. 5f a +' g. g ..'. =... .s J .-r

  • s

,= ,I., .s.. g .e. ,1

  • ,,e e

.*..t. \\'s eI s . r. 6 r a .y;1 - t... c. I c o g, 4 1 r, l , Q,' .} I } ,\\ s e i L i e l [ lg 6 i i i 1' g, n. ..i [- ), g e h ,i y, u. = = l g p-1 4 } .s 3 s

f..

6 e 2 7 s l s' C I, e sa r, g ,1 C j u, A p T j !./j F F i. D I s. e 9 ,t.

f-e s
  • j

/

  • '.,.s i

. '%= I .w l

  • O*%.

~ 9.

3. t '

{ -p e s.i 1 l <, g j n.. s.* c al- {* .N j y,.,p t .~. e i l g e /e .N, 1 1 t, d :. Lo t i . e, g 1 -6... I. .. 'a

  • b.

g. g .. i t. 1 g l u'.... .. s. ". ' \\.. ,. p .\\ g.. *. I se.: s.

  • . ),.

e. I .n.., - .., pc. .T-# s.

  • y.,

. se

  • g

.a d 'l a i t..**,. 3* <s%g ... ~.'.e e. i 4 e* ' g. . J g.- t s.. ,S h,......*. e -. 8 / e e 4 p [ I. e d ^ o g g

4

4. ; =

i r .t s.

  • I=

g.....- s, p=* ,L. r = ., h i, F* p 6 .?.s j*.. 4 .s I

  • i =.

,p ..:s. 4 -q r 4

  • .4*

(

  • .. ', *g.,'.

b-9 ,A e e e e .e.. t e e e* a e 6 .s' .o e,.,, P. e%. j 'N - N '%i. , i s... ,1. %s}of s t . t. , 5.e n k'n 8, 4 q . 5 t e.. ?..n.,. '... ,1* , t s c-g.

  • ,s

-

  • 3 1

f .s... f .s

  • q a

.g. g ....e-3 p e ...f. ;7 ,e.,. 4 \\ ~ <- 4 9 '- k Ng, s, +*9 g e e 3 g.. s s g

  • 8 3

s .c . 1 i. s.. s,* f .* =. . t . 1 s .. ~. .t s. j s.. 9-Q. ,1 c. .s ..c... ./ n,, x. m s c s.. 2 ...~. .s. ..s. ... a. s .9. '. ?..' / R ~ .r ..,.:e. , u. I s ......o..

c......

.)s.;., . s...... . y.. ; x .s g .t , ' '.". ' *, *,:..~-.. a . '. h. u i e s ..,...~4.,s s. 3. %.. s y s. ,s,. .sh* ..;.. v .e ~ .x. m.- c ..*f. ?

g.,.i,...

e. ..4 e .x...... .......t. .s.. = ...o s. 9 - .~

o..

. "*;.*0 '.,. a. .w: -. a. l b..I.

  • s.,,.f_.

i

  • o 7

n._11, _.,s

'e. *. . g.. e .s.., g,, . e * )... * [

  • g...*
  • s'. e.*, s gI

. ~ -

  • g ** * g
  • e'

. e t'. ^* .e 5 * ,s, ,e 's a - s, .d 6 t e . c. i ..t .r a =,. t*=>.* ~. o

o. *e

. g... '.r- ,a.

g., /.

8. e, oe ? i g ,.?. e ..s. .. < :g g.

  • e a.,

..e a e ,s e' g r, J. 3 e e' l.. - " s s .s,. gl 4 =, e-e . 'h 3 3, e Q g. s. s-

  • ,. r-n e

e 0 I e e i ,f = a e.,*., ,n g Y,, ,.4,

  • n.-

.u .., g a, f,, 4 S e, ), g*

  • o e e

.ge g e 9,, 9 O 4 s. e e, ,e a 4 4 . *u.., . ) e,. s, o e e f o, e t e a e g e. e G , i,.

  1. ).
s. 'e.

eL o 4 s e g

  • A,.

e .gs. ,o n

  • ,s

.s,

e...

s .~e. 3 .. -* tt e) 1 o o. s e O to -g ... s, .t. = .,.a, s. e e g D s. ..\\ . ~ r.. e e o o ~ .d* .s t y. f*,Oe, e = S g g O,.

  • '.o a*

. *p A e.c -

  1. ..a*

O. / e e ,.s

  • l

.,4,9 g .p. Q

  • O,s

,e O .,Is* % o* r u r ~ ~ *, r-e .,*e. t e=*a p.- ,/ , b,* .s. ...,. 4 . r.' G*; A.. e i e d,. Q

  • ,*,.v.

q .v ,eeg ,y,,...

  • .; '.,* 1 ;.. s,..,.;.

,e, , ()e #. / e ,6 , i. 4.m A s e 43 * .,e .. a .I. y. geA ,a e J. s e. e %.o c,.o

I . (- i 4 e .a. .e...%....* g /* ~6.y* < e pe. 3........

  • l d

9.e s e. =. l4 . v..: e, A f .e g 3,.e ,p, e. l'

  • )

p 4, ,,s .d g y e s. .s s s. ..s.

e. 't e'

3 .= g ..s;*e. 4. Ty.... ;,.. ~.,... e .e.. g.. s. d . '~. :, i e d Nl ,r -

  • g l

,.e 3,,., l j O, . s m.. 4 4 .I ....t.,t. s 9., .f g e L* ~. e o '\\ .".1 .q s* e ' =..' A N g ~.'

  • A.

l N gN N s e' 8 4. l ".:d.l. - s.e A y : l 4 8 g, 4 e O e 1,.

  • 1 I,

,OO a .Y*,'.*.,.- }. g g

  • g - -=

e e p. '2 ma s' . ~. pe s e o e o,, e

a. C. *.. **. d:e.

".'s-

2.. e e

9 *

  • y n

..- 6 i j o 1 ) l .d p, 8** Q e e ag g .e W.* ,e q eb e ..) o e ~ \\ O f (L l = r. ..n. I / A a s D q +. -m N 7 s p. s L.f g J* .e b 1 o ,a ~ ..s e 1' g, fO i 4,,. I. = .. er g I I- . ;*,9 - e 6 .e. .r.., s e . 4 e e ....*s, .,we g s e. ..m*.. ' e0 I o + ...,5 - - c. l 3 e o

  • e*

e, O o e.*. p =.s a g .'g. 9 -).. t i..'.' S, l4 pA** ~ M .i_,..,

  • I

.#1., ? p r3 n....... 8)g

  • ,.'t*.,.*

.p.., 8 8 ,p..- 0 9 e e .a * .9 A ,s e ..g

  • 4 (I

o. c . 4.- a, e 0 ,e o e-

.~. 4.- .v s. s. 5 ,3

. i e e.

. :,.... a v s .sg 7< y . y. z. i

m..,..

.s . ' f.,,. e.. . p.:. s,..s; y.- ..r....,,3 2.. r. s e. ..-a w...

..o-

,*.. c.. a.... :....,

....,..a.

.n g .s . s. ~ ... s. g s. s. .e ...g n .a S, .p .**s *. ~ ,t A.,...<.~*.

  • . p q *, s
s.,

~ d,. O.4.4 N a, s i . 4,,., 4 0. .A

  • s y.

. s. . b,,m ..s.o. s .m O t . e. 4 o .,.. e a 4 s s ....4 , o:, . *.a; . s. :. n

s. ".

r .. c..: .. ~. = s. ~ ew ~.. ..1 m ..... s .... r j. .1,.-

  • doan.t.co$ g.

E N //.l.:97/0W JON s . L..'

.4 se % '&

l =0,*3 - L. s. ,.s.. I.o .o *1 e,' f. 1.S i g %...' * * * ?. n *, '.A .O. ' ~A s ~. %. 0.. . %. ~ --. ....( \\ r n p., l.. *,.. p

  • ,A

, *

  • l.A

.,',.j .,.*, 3 ,o

  • o i...e i.'
  • ', a

.J A.

s...,.

.o g --....,e. .o s

,x.,... ..., n.. ., s ^ *.

  • 7*1*.

,***..'e,8 k 4.). .. ;.r...,u.:. .g . s.f

o..

.s '...i;. ..e o *.9 , es, 3.

5...
1........

.4, .=,. s. .e w. s o. s. .,3 ,.4 g # f . ( ;'. e

  • =o t;.

d* g e .. : -.- e s. ss s,o =,g.y s a

  • 4..
  • r d

a

  • /

.e. /. ,'.s ' = s /. c f.0

s.. g

.a {1} 4 .d. s. e ,t. sg

r.,

.*... ^. Q .,y. .d. a. 3

  • .e.....a s

. o .o ,= us.t.. g ~. e .s. ,...~ o .a l .e s s r,, ~ ,..?.

4..

l e ,s. .j 9 1 e* e 9 e s I .d .e. y ~ /,o 1 / o. , -,.s. .j e. i 8 .J ,1: o \\ l 4 3 ~ r. g e l \\. a- ..s. .t. j.d 1 .o ~. - -. i s. 4 .d I

  • e 2:

,s - 0 e s.* .,.x , v.. 4 4 ....,.... s.'...., l .g. l .,s.. s.. 3.'.. *. a v... %,. . ~.2 -. e

y.

a a ....p-s,.* .-t. ,3 . e .e.. ..... t e . ~.. * ' 's . - '4-4 -..: >.9.... e..... .,...;,..,.. s. t .g - .t. ..s 3..,. .....,<.s. ...t t }. .s.,, a *; .* e-3

  • ' ' '. " ;,*,* b,,..*,.*
  • *- i s.(.

-s t . [. g ). o.. t 6 t s.o

MORRISON CONSTRUCTION CO., INC. TELEPHONES PRINCIPAL OFHCE l HAMMC7ND: 93).5036 1830 34 SUMMER STREET CHICAGO: SAgina,17036 HAMMOND, INDIANA TRANSMITTAL T:: Dair:.... 3&.9//8.. de....f.O.S T.E R..

Subject:

..N.t.k d.e.R C.. coms otscair:lON l 1 PC-17, Rev. 4 dated 4//6 "USE OF WELD DATA REPORT FOR PIPING Sl)BASSEMBLIES_ EOR _S17FS 2}" O.D. AND LARGER" i O APPROYAL 0 YOUR FILES Qg INFORMATION D{ AS REQUESTED D FABRICATION O ESTIMATING O ACTION REQUIRED: g RETURN.. .. COPIES BEARING CORRECTIONS OR APPROYAL FURNISH.. .. COPIES FOR FILE & DISTRIBUTION REMARKS: i l This is per your request of March 9,1978, regarding your investigation of a worker's comment - "that on individual did not pass his qualificatier test, but was allowed to perform welding". VERY TRULY YOURS, MORRISON CONSTRUCil0N'CO INC. AIL W.. ..M I DISTRIBUTION: / 8 Original to Addresse. [M Pink - Main Offic. Job File Yc!!ow - Field Copy

MORRISON CONSTRUCTION CO., INC. TELEPHONES PRINCIPAL OFFICE HAMdOND: 932.5036 1830.34 SUMMER STREET CHICAGO: SAginaw I.7036 HAMMOND, INDIANA TRANSMITTAL 3/8/78 Ts: Date: J mes E. Foster

Subject:

..MC.CO Welder Test _ Log _ U.S.N.B.C.. COPIES DESCRIPTION 1 Morrison Construction Company - LaSalle County Station Welder Test tog for January 12 & 13, 1977 O APPROVAL 0 YOUR FILES Q9 INFORMATION JD AS REQUESTED O FABRICATION O ESTIMATING O. ACTION REQUIRED: RETURN.. COPIES BEARING CORRECTIONS OR APPROVAL FU RNISH.. COPIES FOR FILE & DISTRIBUTION REMARKS: This is per your request of March 8,1978 regarding your investigation of a worker's comment "that on individual did not pass his qualification test, but was allowed to perform welding". _ _ _ 3hh1 YERY TRULY YOURS. MORRISON CONSTRUCil0N CO., INC. DISTRIBUTION: Original to Addressee Pink - Main OHice Job File Y.!!aw - Field Copy

I ce eso ea r.g l 7 MORRISON CONSTRUCTION CO.,.INC. TELEPHONES PRINCIPAL OFFICE CAMMOND: 932 5036 1830.34 $UMMER STREET IHICAGO: SAgin w I.7036 HAMMOND, INDI ANA TRANSMITTAL Date:..blAI Lk..8'?E. l<: /./UAA..k/h ....5 d-M

Subject:

..WL.d.11.<...$...0.r.. W.W . M.. ?ap2/Ad..W.And...dfAdLL&, COPILS DESCRIPTlON /m }sNdi4 Svadf)suku ne)Anh M / lA h t / It'e.s u 3, d M l'da b i l a z & 4 e A-n) //- /- 7 7 9' // e2 '77. lA'L' % &J1 WO4-6 n.) ' //-/ -7 7 ~0 P/- //L5 //- / -7 7 P/- FLS // 19 T/- //LS O APPROYAL 0 YOUR FILES FORMATION AS REQUESTED D FABRICATION O ESTIMATING O ACTION REQUIRED: RETURN.. .. COPIES BEARING CORRECTIONS OR APPROVAL e FURNISH.. .. COPIES FOR FILE & DISTRIBUTION REMARKS: L Ld])d)2K r d N YLd.dl,/u 9 /995 JLAWw 'I ht/AA.) 15 <t dEM _ s1&2La) M d 21) (2-t'LJAllMh&bd^ idb!'Ld14di* N 1%L W 1) Wvit.wa.o) RWo-tb $H tht /Y$ h5Lfde $dr f w/n v.suac VERY TRULY YOURS, MORRISON CON 51RUCil0N CO., INC. b!.")t..... -d. d.W.. M. DISTRIBUTlON: Original to Addressee Pini - Main OfCce Job File Ye!!ow - Field Copy

~ MORRISON CONSTRUCTION CO., INC. ,TE L,E, PHONES PRINCIPAL OFFICE HAMMOND: 932 5036 1830.34 SUMMER SIR ET CHICAGO: SAginaw l-7036 HAMMOND, INDIAN A TRANSMITTAL FOQCS-479 Tu Date: 3/09/78 K. NA.lDU Subjeet: ....U. S ,.M,. R,3.C. COPIES DESCRIPTION 1 PC-13, Rev. 2, dated 6/30/76 Morrison Construction Company ' Weld Data Report' O APPROVAL 0 YOUR FILES @ INFORMATION @ AS REQUESTED 0 FABRICATION O ESTIMATING O ACTION REQUIRED: RETU RN.. .. COPIES BEARING CORRECTIONS OR APPROYAL FURNISH.. .. COPIES FOR FILE & DISTRIBUTION REMARKS: This is per your request of March 9,1978, regarding your investination of a worker's comment - "that on individual did not pass his qualification test, but was allowed to perform welding.' CC-D. Carlson VERY TRULY YOURS, MORRISON C i T10N CO.. INC. y k p> h ~l$ f"^ " ' 3 6/ak. DISTRIBUTION: y Original to Addreinee M Pink - Main Office Job File Yellow - Field Copy q J7-

D 4 e A. &-/ s / AJJ sy+ (A Am f/a - jh/n..% @ A .A .et& a Vg w..se~j a fs Ar -A h h A* l M D a p :s ApAm Mn,- s-s n ~ 4.,, Vr 1 i (. y,

  1. nd-:::7 O. 3 M / ?. C

,n

' " ^ ' NUCi rAR I NI'l(GY SI:HVICIS. INC ~ " ^ " ~ ~' CONAM INSPECTION DIVISION ~ (j y g }{j g ** - - ,. / l,) UN,11 NO P.O.tieeIGO .....,. i t.,,......., G i ns ,,,,,,m,; g,. ,,,y, ,, n,,, _,,,,,,.,2 [j COMPANY k ~ REPORT OF RADIOGRAPHIC EXAMINAIl0N COMMONWEALTH EDISON CO 1PANY ,h((O c u,n,in.., C on i r.io n. p o no. ,ni,no 3 Q[ P,o,cu LaSalle Station N. +i.5. zu :Aj) ; ;. s.4p.i N..),,,, 2 * - - T ECHNIOUE DATA ' - - - - -- 2 -- W I b. 4 '..? RT Procetture No. - ~ ' f[ REV Item Deu ription Pipe Welits? O ther - RISuinmer b Mat'l T hec k ness. Y 0, / T yise Matre.at _ b _ E nem'.nition S candant,- 'M '. d : YH. 7# [] Winter Pipe OD ~ P-es mer Acceptznce Standard S't '.E LhJ'If Yn. 7 F4+aeer SFD 7.O M ' [s C// ' Source to otticct No. of Film per Cassette Pe trameter / 7 7 Shim.O /i Source Type 3'E - N k Curies *?*v [, Y8 d j VeI*ing Single I Superimposed Physical Source Site, f" Y. !" E f f ective F ocal Spot [ '[ Pt,Scseins Feont Wb Center B ack, O /O Geometric unsharpness lual, OD'/

  • N' ll Dev. Time /-] s \\C, a

Film Type Mf Enposure Time B:cking or Blocking used Contractor Req. No.: 1* !3 S Density Range: N. 2 E. To 3* 3Y L en2 or Dw y xL .g No,s 1 / 'p / '/p /// ?ur^?.+i.$l'iflll//f ll. "T " 'fhp//// f y,m_) ///e Q -~.. ~7 / Is / / .~ / [/ if / /6 i l IG / 6 v / w> / / / / / / / / / / Conim F = aminen / [N :^ d 8 _ A c plance d j N' 'M ~ Leven uals n.atuie Y /d * / $ '77 Com 2any $,gnaio,, 0,,, b',

  • Ccnam E naminer c.'A, Customtr Acceptance

.gpe e L even Date signature Dale Crnim Interpreter NJAS M I'MI o ~I Y ~ U, Al Review Si azure Level Date Note-Reference F elm E nvelope for geometrec outt.nc and addition.it enf or mation. F gem No. 823 0 fiev.1 reven

MORRISON CONSTRUCTION COMPANY Hammond, Indiana _ RECORD OF WELDERS QUALIFICATION TEST WPS NO. P8-1LS Weider Name - S t amp No.. O ~4 9 Welding Process __SilAW Type._MANU AL_ _.. . Code No. 9-0-5_-1._ _ B acking (QW-402) Backing Rind Material (QW-403) Spec. A 106 B. To __A_106_B. _ to P No. 1 Thickness Range _J/_16" t o Milxu_ Dia. Range 21;" ancLnver Pipe Dia. 6" _ Wall Thickness . 8 6_4_ _ Filler Metal (QW 404) Spec. No. SFA 5.4 F No. f5 O t h e r ___ Position (QW-405) 6G (1G,7G,6G) Electrical Characteristics (QW-409) Current Direct Current _ rolarity Reversed Weld Progression (QW-410) _ Uphill FOR INFORMATION ONLY Filler Metal Diameter and Trade Name Flux for Submerged Arc or Gas for inert Gas Shicided Arc 3/32", 1/8" 308 Chemtron welding GUIDED GEND TEST RESULTStdW462-2MW462.-3(e}70 V4 62J(b)___.__ Type and Type and Figure No. Result Fi ure No. Result F l Radiographic Results: For alternative qualification of groove welds by radiography in accordance with QW-3n4 and QW 305 Accept _ed_# 3248 Test Conducted by MCCo. Laboratory-Test No. _2250 Kurt Kranz Witness M_W_ 7_. _. per l FILLET WELD TEST RESULTS (See QW462.4(a), QW462.4(b)) Fracture Test (Describe the location, nature and size of any crack or tearing of the specimen) Length and Per Cent of Defects inches Macro Test-Fusion Appearance-Fillet Size in. X in. Convexity or Concavity in. Test Conducted by I.aboratory-Test No. per We certify that the statements in this record are correct and that the test welds were prepared, welded and tested in accordance with the requirements of Sections IX of the ASMF. code. /[ NMM 'MSigned _Morrison Construction Company M I te J0].10.77 3//Ml]f. Ef (Detail of record of tests are illustrative only and may be modified to conforrn to the type and num-ber of tests required by the Code.) NOTE: Any essential variables in addition to thcne above shall be recorded. Form MCCO/PC 5 Rev. 5-I-75 Form QW-454

t cN$Non STANDARD OPERATING PROCEDURE PC-17

  • Co u r A'N Y PROCEDURE NO.

TITLE: USE OF WELD DATA REPORT FOR P! PING 4 "' /76 4 ' I'g SUBASSEMBLIES FOR SIZES 21" O.D. AND f.'M). e j LARGER 8 l e40u O, ~ ~ lffg}[ ~1

  • +ce #

C.E.CO. LaSalle County Station & gerwn h o-7t Approved By i, n92( a-g u hjm sm& M. & L - J M L, n 1.0 SCOPE v The purpose of the Weld Data Report is to provide information and instructions necessary to accomplish and control, through completion, the requirements of a specific weld joint; to retain a record that the activity was in accordance with the requirements of the spec-ifications and goveming codes. The Weld Data Report ~may, at th'e discretion of the Morrison Construction Company, be utilized when controlling activities other than stated above.

2.0 REFERENCES

The Quality Assurance Program, Section 7 - Process Control, Field Fabrication and Erection. 3.0 RESPONSIBILITY The Project Engineer, Welding Supervisor, Quality Control Supervisor, and P! ping . Superintendent are responsible for implementing the designated functions described in this procedure. 4.0 INSTRUCTION 4.1 The Weld Data Report (MCCO Fonn PC-13) is utilized as a traveler or is included in a traveler package as a Process Control Checklist. 4.2 The approved Mini Spec will be used to complete the basic instructbn requirements on the Weld Data Report. The Mini Spec will include the requirements of the Design A IT

...,n... ._4 .co aNos STANDARD OPERATING PROCEDURE PC-17 Co kip AN y Pnocrount N O. -~ ~ TITLE: USE OF DATA REPORT FOR PIPING ~ ~~ ' 4 ---" ""fryg ff 't SUBASSEMBLIES FOR SIZES 2A" O.D. AND

~i g'i' t LARGER rio,2 8.,

Ice.L }lgygg C.E.CO. LaSalle County Station A,,no m y Specification, applicable codes, approved welding procedures, and the Quality Assurance Program. 4.3 The Weld Data Report consists of eight identical, separate, colored sheets, each sheet separated by a carbon insert. Caution should be exercised in handling or marking, as each indication will transpose on all sheets. 4.4 A Weld Data Report will be issued for each production weld of nominal pipe size 21" and larger for piping systems governed by Section ill of the ASME Boiler & Pressure, Vessel Code. 4.5 The Quality Control Review Log (MCCO Form PC-58) will be utilized and maintained \\, in conjunction with the Weld Data Report to monitor the work. 5.0 PREPARATION OF WELD DATA REPCRT 5.1 The designated Project' Engineering Department personnel, utilizing the approved Mini-Spec,will complete the assigned responsibilities as detailed on Sections A,G, and I of the Weld Data Report, and sign the completed sections. Similarly~, columns 1 through 5, and 11 through 14 when applicable, on the Quality Control Review Lcg will be completed by the designated personnel of the Project Engineering Department. The revision numbers for the Mini Spec and Field Procedure should be included in Section A of the Weld Data Report. Revision numbers to the drawing, shall be indicated on the Weld Data Report at the time of fabrication. The Project Engineering Department will then transfer to the Welding Department the Weld Data Report and the Quality Control Review Log, MCCO PC-58.

p..._._._._.. ~ No.s STANDARD OPERATING PROCEDURE PC-17 Co ' COMPANY .PmocaDUKr ND. TITLEFUSE OF WELD DATA ~ REPORT FOR PIPING---- ~ ~ ~(' ^" /76~ 4 -~ f." SUBASSEMBLIES FOR SIZES 21" O.D. AND LARGER raa n _ 3 8,, i e i i khb '% [ C.E.CO. LaSalle County Station erso m g 5.2 The designated Welding Department Personnel, utilizing the approved Mini Spec, will complete the assigned responsibilities as detailed in Section B of the Weld Data Report and sign the section when completed. Column 6 of the Quality Centrol Review log shall be completed by the Welding Department. Section B of the Weld Data Report and Column 6 of the Quality Control Review Log should indicate the revision of the d welding procedure to be used. The Welding Department will then transfer to the Quality Control Department the Weld Data Report and the Quality Control Review g Log, MCCO PC-58. [ 5.3 The Quality Control inspector shall review the completed sections cf the Weld Data (. Report, and shall enter the Quality Control and Authorized I.n spector's inspection / Hold Points, when applicable, in Section J of the Weld Data Report. When the review of the Weld Data Report for compliance with Section til of the ASME Boiler & Pressure Vessel Code and the D' sign Specification is satisfactory, the Quality Control Inspector e shall also review columns 1 through 6 of the Quality Control Review Log with the con-tents of the Weld Data Report at this time. 5.4 Should any revisions or corrections.be made to the Weld Data Report, these changes shall be made and initialed by the person responsible for the affected section of the Weld Data Report. Quality Control shall review all changes and revisions to the Weld Data Reports for correctness and compliance. These revisions and/or changes shall be made available to the Authorized. inspector. L \\

E0[Em STANDARD OPERATING PROCEDURE PC-17 co COkf rANY rROCEDURE NO. ,j TITLE: USE OF WELD DATA REPORT FOR PIPING 4 oy,4/76 ,,y, t SUBASSEMBLIES FOR SIZES 21" O.D.' AND l LARGER raos 3 - or e 0 Y I [ * u $*. C.E.CO LaSalle County Statia, '~ - ~-4rrRo m g 5.5 The Quality Control Department will then remove copy Il of the Weld Data Report and maintain it in the system files. The remaining seven copies will be transfered to the Project Engineering Department to be included in the Traveler and transmited to the Document Stations. 5.6 The applicable columns of the Osality Control Reviewlog will be maintained by the Quality Control Department. Entries to the Log shall be madc following receipt and review of th.e completed sections of the W<.ld Data Report from the field. 6.0 CONTROL OF THE WELD DATA REPORT IN THE FIELD (- 6.1 The Area Supervisor and the Quality Control Inspector at the Document Station will be responsible for maintaining the system travelers that are in process in a controlled, fireproof cabinet. 6.2 Following the receipt of the system travelers, fabrication / installation controlled by the Traveler will be processed by the Area Supervisor or his designees. The Area Supervisor will assign craftsmen to prepare each component to comply with the instructions of the Weld Data Report. Copies 2,3,4,5 and 6 shall be placed on the subassembly in a clear protective envelope in the vicinity of the weld by the crafts-Copies 7 and 8 shall be maintained in the Document Station files. The men. craft foreman will request the Quality Control Weld Inspector to complete the field inspection as required in Section C of the Weld Data Report. If there is on Authorized in pector's inspection / Hold Point, the construction foreman 6.3 s ,.= 9

-~ ,cS[d"$[oy - '5TANDARD OPERATING PROCEDURE ~l - PC-17 -- W _ courany _ ..oceouar o. TITLE: USE OF WELD DATA REPORT FOR PIPING "" 4 ^"4/76 fY ' SUBASSEMBLIES FOR SIZES 21" O.D. AND { -- - g g%j -- tARGER 8 __ i rior_S. g

  • +ce #

C.E.CO. LaSalle County Station l} f {},j ni.E. J m- ,,,.oni. 7 should notify the Quality Control Department who will notify the Authorized inspector. Work cannot proceed beyond the inspection / Hold Point until the Authorized Inspector has given an approval to proceed with or without his examination. 6.4 Upon acceptance of Section C of the Weld Data Report by the Quality Control Welding inspector, the Craftsman will obtain the specified consumable insert / backing ring from 8 the rod issue room by utilizing copy 2 of the Weld Data Report. Section D of the Weld Data Report will be completed by the craft foreman. 6.5 Upon completion of the final alignment, the craft foreman will request the Quality {, Control Welding inspector to perform a field inspection of the joint as required in Section E of the Weld Data Report. The Quality Control Welding in spector will examine the alignment of the joint, check the identification of the consumable insert / backing ring used in the joint, and indicate his approval by signing Section E (and J when applicable) of the Welding Data Report permitting cruftsmen to weld root pass. The Quality Control Welding inspector shall transfer, via the Document 8 Station, copy 3 of the Weld Data Report to the Quality Control Department. The applicable data shall be reviewed, and documentation entered on the Quality Control Review l og, and copy #3 of the Weld Data Report will be placed in the systems file with' copy #. 1 6.6 Copy #2 of the Weld Data Report shall be utilized for withdrawing the weld rod from the rod issue room by the craft foreman to complete the root weld. Upon completion of the root weld, the cruft foreman will contact the Quality Control Weld in5Pector

. ~.. ~, .coI[$$m STANDARD OPERATING PROCEDURE PC-17 CO Af PANY. ~. ,enOCEDURE MO. TITLE: USE OF WELD DATA REPORT FOR PIPING "" 4 " 4//6 h /# '.)'g SUBASSEMBLIES FOR SIZES 2i" O.D. AND '- 2 LARGER 6 8~ -~ I ~i l~i raar - or - - .ffg}[ u C.E.CO. LaSalle County Station 4rrao s 7 "'~ to examine the root pass. The Quality Control Welding Inspector shall examine the root pass using the nondestructive examination technique (s) specified in Section G (and J when applicable) of the Weld Data Report. Upon acceptance of the root pass, the Quality Control Welding Inspector shall enter the NDE procedure revision and sign for applicable examinations performed with his level of qualification in Section G of the Weld Data Report. Then copy # of the Weld Data Report will be transferred, 5 via the Document Station Clerk, to the Quality Control Department. The appropriate, 8 information of copy 5 will be reviewed and entered on the Quality Control Review log by the designated Quality Control Inspector. 6.7 Upon acceptance of the root weld by the Quality Control Welding Inspector, the craft a foreman will withdraw the specified welding rod from the rod issue room and complete the weld as specified in Section H of the Weld Data Report. The Quality Control Welding Inspector shall visually examine the final weld, indicate his acceptance for final NDE on Section H, and visual examination of final weld on Section J of the l I ' Weld Data Report. 6.8 8 Copy 2 of the Weld Data Report will be removed from the protective envelope when 1 the weld is verified as complete, and transferred, via the Document Station, to the Quality Control Department. The designated Quality Control Inspector shall review and transfer the informati-i from copy 2 to the Quality Control Review Log and file f f copy 2 with copies 1, 3, and 5 of the Weld Data Report in the systems file. 6.9 Quality Control at the Document Station will complete the NDE Request Form for final nondestructive examination utilizing information on Section I of copy #6 of the Weld l Data Report. The qualified Nondestructive Testing Laboratory Subcontracted

i_. .f cI)I2E"on SThNDARD OPERATING PROCEDURE PC-17 ~ CokiPANY - PitOC*DUR E N D. TITLE: USE OF WELD DATA REPORT FOR PIPING 4',,,, 4 76 [ / /. % 4 SUBASSEMBLIES FOR SIZES 2 3" O.D. AND ,, m } l LARGER raar 8 ,et l C.E.CO. LaSalle County Station ~ ~~ f arraovat ' by the Commonwealth Edison Company shall perform the final nondestructive examina-tion (radiographic, magnetic particle, and/or ultrasonic). When the test report of the j nondestructiveexamination performed by the Subcontmeter employed by the Owner is { attached to the Weld Data Report, Section I of the Weld Data Report need not be completed. When nondestructive examination is performed by the Morrison Construction Company, Section I of copy #6 will be completed by the qualified Quality Control Inspector. The Quality Control Inspector interpreting and accepting the nondestructive examination results shall indicate the applicable revision of the NDE procedure and his level of qualification in the method of examination along with his signature. I' 6.10 When Post Weld Heat Treatment (PWHT) is required, the Quality Control Inspector will transfer copy #6 of the Weld Data Report to the Welding Department as a release for PWHT. Following the PWHT, when required, the Quality Control Welding inspector will complete the applicable portion of Section H of copy 4 of the Weld 1 Data Report. 6.11' The Quality Control Welding Inspector will transfer copy #4 to the Document Station when all the documentation requirements have been completed. The Quality Control Inspector at the Document Station shall transfer all the information from copy #4 to copies 7 and 8 of the Weld Data Report maintained at the Document Station. The Quality Control inspector at the Document Station is not permitted to transfer the Authorized Inspector's signature to copies 7 and 8 of the Weld Data Report. The IS h Authorized Inspector shall sign copies # 4,7, and 8 of the Weld Data Report after O

.d ~ =Sm. STANDARD OPERATING PROCEDURE PC-17 co

  • COMPANY PROCEDUKE N 3.

TITLE: USE OF WELD DATA REPORT FOR PIPING 4 ^" /76 4 / %. SUBASSEMBLIES FOR SIZES 25" O.D. AND " "', 8 ,,,, 8 j['W }l LARGER raa ~ [d[;((d / C.E.CO LaSalle County Station 1,., ov,o y examination of the inspection / Hold Point. Copics 4 and 7 of the Weld Data Report are then f transferred to the Quality Control Department. Copy B of the Weld Data Report is retain-ed at the Document Station for information. 6.12 The designated Quality Control In spector will reviewond enter the information from copies 4 and 7 of the Weld Dat' Report on the Quality Control Review log and complete a all applicable columns of the Log. He shall file copy 4 or 8 f 7 of the Weld Data Report, final NDE reader sheet, and PWHT charts, if applicable, as part of the permanent record. 3 f t

v -e \\ e s ,, UNIT 1 __ UNIT 2 11 19 1 7 12 15 18 23 31 1 E he:t 2!: i ,R ADWASTE y S.Q.g .l st'DG' 8 B l $ E RVJC,E! '15.t D G.T' [f ~ l . l@l.15[is?5?!58-5.--hbhAT' W l. %,. p;,:..?p*.:.*.:k.l'Dtb1N C,? - b.L D Q.cs:.Y.. wriir.,,.K-;*s ye

  1. f.-h;.. r.
.i-?.p et

$,4 r. s ,....c; ;, ' t.: - _.,-.- 4. ; U ~,"E ' pf - t _. e y ;3. &., f. i 'j c.y4j* ,., v Tri;',2f'$ 'h 53 % 3k.jE5 din m 3 M"4 y't%",',.K:d;, -}.;2;- 1, j. 8 , {, i: 1 R die SE t. l 1 I I DIESE L I.O EY,, 00] -6EN.W. l O GEN.RM. i ~ a l J-Jij s Lc 1 ;- REACTOR BLDG. / Q RE ACTOR 5 _ug.3-sm I x Orr gas FILTf R t. hh 15 71 1 24 29 W L M ghr;."h b p/

== Lid lE ri KEY PL AN / i

==-.-==. o--r-o-,__~ b* ~ 4.A s% A l6

t 'f

  • 10 p *-

.. -M g.r y g Tom W. Miller. P.E. ' se

  • (

Professional Consulting Services d W, Government = Busineu

  • Industry II26 Franelm Rd Louisville, Ky. 40214 Quality Assurance Spec. list 502-367 2454 ia e

i e t 4 4" t I L U I l

1. Concrete vibration a.

Interview individual, b, check for NCR's related to concrete surface conditions

c. Inspect the surface of any recent pours, inspect any pours named 'by individual,
d. If any pours in progress, observe vibration, have concrete sampled.
2. Weldingt
a. Interview individual, need more specific information.
b. Inspect any specific welds mentioned, check documentation,
c. Discuss with QC inspectors ; any such instances?
d. Review site welder qualification procedures.
3. Electrical cable pulls a.

Interview individual, need more specific information.

b. Inspect any specific junction boxes mentioned.
c. Discuss with QC; any such instances?
d. Check for any NCR's reflecting cable pull problems.

e. Review site procedures. I I

4. Cable tray welding.

a. Interview individual; need more specific information. i

b. Find sequence of events concerning 1 hour procedure review.
c. Interview his foreman (7).
d. Inspect cable trays he has made (EL 715, lines 25,26,27) e.

Inspect hanger arm mentioned (find out location),

f. determine which water intake valves were indicated.
g. Inspect the subject pipe valve and associated pipe,
h. Check for NCR's regarding the pipe, valve, ect.
5. Cable tray welding

~ a. Interview individual

b. Get specific location of questioned cable tray supports.
c. Insper_t cable tray supports.
d. Check of identity of the welder, check qualifications 4
e. Check site welding procedure: can one welder start weld, another finish?

A IE

Items to be inspected (af ter intervie' s).,

1. Concrete vibration A. Inspect concrete surfaces'at jolns fo'r' chalk ^y. conditions'.

/ B. Check for any NCR's related 'to concrete surface conditions. V[C.Reviewsiteproceduresforconcretepkacement, vibration. D. If any pours in progress',. observe, gd, g2apic, abg v1bnitiw.. u n . Welding (Morrison) . Check documentation for weld on RH-99, unit 2 Diese: generator room. Closure plate. B. Which weld rod is listed on above? /p(,C. Revisions to drawings are not documented? Check revisions, procedures. D. Check for procedure qualifying welder to close " window" on weld. e y 11s 1. u t n C. Review le putt procedures. D for any NCR"s on cables pulling of f junction boxes, exceeding - it.

4. Cable tray welding, ect.

C A. Review welding qualification for one (Jan. '77), areas worked. /B. Check areas where individual (stamp D '79) worked foi-Q,- Aof/4dA/ q/. Check function & class of hold-up tanks directly under reactor,-du a A D. Genera l check of Foley, Morrison procedures, g &0

5. Cable tray welding A. Inspect welds on I-beams supporteing cable trays p# NN *y B. Inspect brackets welded to containment wall and cut-out.

g/2/,P[ . At 99 vertical member misaligned. M.170 el. 750 welded leg in wrong place, cut out - inspect.260 el. 744 +8% column hanger supp ~ F. 130 el. 757 +6 inspect cut bracket. c - G. 115 bracket above airlock door - cut-inspect. H. Find out how many QC inspectors for Foley. /,/ I. Is design for cable tray supports (I_ beams) appropriate? Ad#M, it e wt ut HNb-Uf.gp IIPAD 767 -O/e ? pf r]52 / w9 aun A 6

O INDIVIDUAL IDENTIFIER CODE REPORTS 50-373/78-06 50-374/78-05 Individual Name Position Company "A" concrete Finisher Walsh "B" QC inspector Morrison "C" electrician Foley "D" welder PSI (former Morrison, Foley) "E" electrician Foley (terminated before investigation j concluded) s h2c u-

mismaJ W .h.... ._n > n 4p.in. f&s /n c-4zas,y.).e._. . -.M M .3K.-J46.-d:Arkc.9-{C-31 -.-_..A&QM.) A--A-L W. ene m m-N 4' Wemw m d~ g .>. y.2,b. pA.z~r hrs ~a. -a .m-- e* r d a n. m._. ~ M& & Adm V M Q .dt/A m. . w & m &m M A:::. M4'AJ (fG"-6~~)k& A n.L a. J < 2 A 4 --< & x & h wA 4-h /~.- n- & J</ m m. ) + s-ttk A .n 21Y wf / UWd.i,, A* mas m TA_R.44(X HQ-Wd g g7r* J 5m ne4-e e . =.m wam-l

e .ff _<AJ~y - wm \\ 7x Ji _ w py, A4 t us4,-c=: f2 M'- alf-M:bst '7'l As L <a f sn p C r j d & -. .i-., 6 i w M h w c-.dz ?- h w_ ~6_a__er' .w wg,, //r {Aw_yyM -M Ae 4 & A _ m 4 dT m cax-r Jr N am+w :Ja m p - Mn - p.- 71 31.2M4-92-DVV AVd?Y N_


.m

,,n,-

L 4. 3 l l /71 Af M - t I N rm/ . o-rJ4L- = l h ~ 4Yf ! M& M k--- amaass_ / w.. O e A -._ - = - _. A s:~ =n:,, ~' m eJr<JFNO 7-r W L-. _..- f/) A _, p A.J~ n m u j.. G =mee e* .w.e-w M e.pm .+. M e i ~ ee o P e - ~ - " - - - - - -

4 ( .\\ e g 8 a v a. .aw)_ 6: .._.291 __. sea LMex . A --. L. f_ pp-..--.-.-._. pudd&%.db2 - w 4 l \\ Ma_rdu ^ %- 2w y s .L' .p_ /4..& LM/de&.5-l ^ l s -.#_.,ec~a e x+. x A d m a k. l g. - 7 l \\ W '. "*/*k' .-..s .w

  • N
  • W" I

h@d. & & h%. I $AA

l. ;-

M i .,./ / / l,j .~ \\ =O M k 't I J A. a; ..AWM zi./p-c_d_ M 2 3 - I - AW nsAfm z u 3._- O .D c4 M _A, A.. Q - -.Mg AAMa. i ~ l~~~]' h.' A "A & -WNp l ~ ~ i

..a g s M -y f s :x y e O em .6 'M-e e any e p g -gy+ ,r-w1 e + - p.

ooen= "

  • 9 l

~ 1 fNdNZ C& 1 .1. l ((f ~ ro 44WKK 4Qcf - f k/ - Gn/44A1V7) ~dtgf_ Q_.f/d/LA c&__ @y17-A' bx N-lm 4 .% &. Murr racy L.the-y LED B/KC-_$ - fBAWJ_Aff_Mq),_fAm_ Misc 1jsu ^ Med,mh / J .M_m._. A t = s As az n4 e<~ ad = ~pf a =M w w"

  1. 6

-/4/ m m m9 { ema me ,,up. e m e me_m-m m9 !MAA_mAM JJA-A& %tAsx~n-s/ / m m a L.. N ,g = g, 'f a# 'I ea ,},

  • /

'hif$_ y. .e s ~ :3 s,<. ,,,m p--

u t t L y yr/n r.m ./V... & W n M f.. rs M - A A==c

  1. Q M ee o e

w..m 4;..- A.. w y n-nd-w SA _.. nma my,w~ As 4.x C .s.&.4 m. f 6 m @em +=

  • eu.

hee==i e elumagem w -. m ee w-,eg G <=wm+ e .e

  • N&-N -

6 m9 ,, ame ..~.

== e A 4e9 6-me 6 46 mgm e e-rnGe 4e

4. m me-y 6=

m e =*W96T*# w6 W-m te m en n-e 8h aww - emper-h hemM

l' O ~ $66/4. .. &2 n/A W ni.. ._ w wN'!-7 lm

  1. . S E ~.T.

. f

M

, ro. .m (** ^ e 7* ' + m v e M-:J-M i T" h:s Wo 4d ? ,ag Wp-AA l n c a-J A A w y=&7 i . pp.

, ~ -,

i ll i! l i j N i

l N '~ z W J 7 4 4 / s'le a. - A fad Ky -AA /p 's 7n,e w - u y ar*(2) w.A., - A .ir- -wy 40~ y/f}p f au f y. nf A m Yn Ljf W L Mff-y.ff.~ f-1 sfL 4 as. (n. f,-f-/6 wacas $$N/h*we A "~ w2 sm,a m isown'.cfpy p2Kroe1/ yp1cwnMim-p#f/LW

g v j l l -A - y A~ p oc-a s sa w Q wy. M O i i I t t

IN tEILvIUV //7 f 1/N ~ W " & ' h"if^Y aasa fba~. h Accxv CaZA h-fun & en L 7Yo.o1L 4+7 DssMM ? M4AF&M&& ' @Y# Y,Y

  1. (87 ~rg sads s.L

~ pads 49 M "A xw." M M ~ Wf ~.( p A~.ycr). Mo - qs ffA A / y 1 er' >~a-bJ-4. fy/w. a yyf a Ma a2,f. 17o* 2 750. / A N a &.a m p4.u FM sLm. s/A, ni

4 ') .g a s e ,, - <--sa -p. u.rwuury - M4 +2. M =wMM,P b -w /dMA- / 6au6 m e L _.. s I to W m.. y// u sar a -91 4 ( [ A _ 1,v - e e ) m y q n ; ~ 't M C 2227~"":_ nap-gan x-( M w ln Ila I am wp I s.m m -1 \\ MAD % - n_d= a/M._1L<;,.,,7,, / \\ MM 2. M N \\ / na. / \\ .MA wn u \\ A m / \\

  1. - W t w =1 r

y A2F

4 l g, w m m,7 . f.m . g.... ._......e. Ne-m* enehe g-e x .ny nc ~A Y M m _. 7 ..m AA m {s J _& :A: -j ArAOw - ( / sew 4 s -- J f'~ W ). 7r A s e,, - 2W -8: :. _..... _. _.... 2s:-s m a.,a-as JT<r WM e w& 6 .... _._. _. 4r .O g { - -.~.-.._ _ u .e*N

  • h a

.mes v e. wee-es.N. e m W*9rW NOee e h e.m w e. g ame-e eat.ame e g e a4 .m -..eman.-e..- e m.ww.- h%e ,e ,a 9-- _ e wu. gam m ge.

co VY _5$/2r sk+ mm H y + + L_n p Lam -A. mutov _ ] ,7 7 ( ) ' f J yr 16 -p. wM, 'MMm-E + m. s _ p = p = _ A d m _.. (f/6: M J S A d d g e b y.. A rx a m_pc A [as fil A AMAm MAAK _

  • 4_c *nd_-.._

m( A M - - _ywA ^ zp,

  • 'H e

.au-e A p M m 4._- AMMA4 nrms -Ass fl Jb=-dd M AW!2 f L l & Q )- Mda _gMc am.H w

ys/ w _. w M wg & A. as4~e;rs 2.. f a A&n p_. -. -.em+-h p e 4_x a, .-_.._& q1, a. . & L 4 x s ~pcc . ~^ ~~ //~<' Sr a 4-s~9. w ff~/wg_ z a-e, n - /WbTW$W -- m _ - mp. 1 M# M ffc/f/ f,4 n ass, n,eu/

. <a ~ m - u

me-w-4 e e- -h am-y. -.-e*--. m p m-e .ewg w e.-= m.- m -e..- m e e .mm-e m +4ee w e p e e m -+6-w + e-e.-* *, ww= me.e- -e e .-se e er .e == m s

  1. 1ct*6 AOCr/ ll-/ 8 f

MWlm V AdfEK : ff41#fdffD /2. * /7 '7$ ~ /7 At tyfEp er/ / wWiten - out )f' & &w lll'l?'? ~ ~ ~'( % f & w o., r i 7 7 hff //-64.S' 7 W ~S l /' - // L [ (/9/77) 4A6 7EJT .2.30 3 4 .2367 (///2/97) fNW A## Nf'W WV] py w crak<.T /f 4,) s,4 /77 s -/- e i s 2.30 ? lllg7~7 f-/-// 4 r Q91 ja + /-/- 17Ar eo3 Aci\\ _ Ji)/77 '\\ h \\ l 28 -e. -ww px mm u ~ 9p A- _sy z-a - + _ u A 9 g-( 6 --f 2 p /G -..-. /MMAA - AF=-f y mA-=, g. M)W j i.T ~T~ ja M . M J _ 2 0.... M > >'J', '7_z / priars_ pM nAAJA-4Jvy gn) As_ OALL AA - ~- &DA A __ W f}fW' foo_ s / m -A n. f oc k - A -Q&MDX4,x/ i m m P 9 e g aw T f 3/7W. m%n-Ihmo k;_ - A A d h @,n n n ;=. +. .= ~j h_ _,, _ [-.~/ As J ' % A:sjr4-Q d. J. l ~~~ l era n,asa i c g M. y ~2 J t //ho-w-3szx2 (@Y-a a n~ 4 -A l s ._. W & & t w f e u .. f.py f esr. i: n.m n - _r-M m/6 p -p.... - f'- " f 7._,, j j __.. a Y g .. ~~~Il~l[ A $./f E__2d2 A $.__ __5 .__I..-.-- ee 4 -e e m. Me_ e -

  • E1E31

.fl f WY a-a-< M- (Fi vfd). 1

  • ~

Wf f an &.m n 25 & - W l M.hM.- Z~: :.. _..... - h. & [0- _ /]$._ Y.. fm Wm AN b, ~ A ^! .ig.s-Sm _ C W 7 'MM l /G f/S~ - fd ~0~ l YYww S72E 3/f e //f Acf M FMW C-33 ~cammr Uz6

  1. 1 lYi> 3 xts b

co n s t u. /736 15 to 68.5 asor.a J.2 o2_ _i 1 ^^w-Y Y ^ (wepv -me e 9 2 2 .m w. D h6 l [ 7. k i V 6tr3 Y YW /Awrcm-l"#

  1. 44

/ $(MN/WG &T4 M'/r- #/ VE -wouw se m ~ m g,pg, 4 MAc#///K S/f40 Ws2NM& MceP#af ow* W W aeyEK ~ f 6 / Y W/(ts mysebr app ~ owacst das sveto' ws sure putt-cear /zMA Bln. Ed /s74 nzo Wark Au *BX / bat N Mat /cov 3 ?? hs S& -9d ore s. A,. 9c muaz_.. @@m eesmme m omen e

4. p.

n ec. -mw.ew a me

  • an,.e p

w [ a -.e K. =..- 2. $ K. z. f4. . M, 9 c.. e 03... ._e.20. S zz. - M. w. a. - n < <. g _ ~, s >. - e-e e m k e w -- - -e w - -emmmer e m, p=ep-m em m

  • e w

em. e. e meem - .p e me em e e eye-e e m em mee .-M . map e ee erg.4 -.my -.e-e m g N e. an ag6 emensa me. w ee g 9e -e meeeasw-e --hw m ammim s m.m. mm. = W ee-em.

  • e eng e

A 31 m yrpe 7,26 /V... & W n M .r. - ss sw - M. =c W # M ~ w M _.r M [ l -. m m -./2 A-DA - &A :rd l .--m-W As 4.;e V +f x M.m. MuuEme e.O e m hBus. h m-e e e 6N m 4 -em e NW "M S Se - gWe O WP 4 S* m MN6@ eum mg,,, 9 4 de 9ewwe

      • =esa

= e namin e e .e e W 9i-@ha+ em-On 6 m M h mweee ee e e eweh pmm e m um N6N= /4 6.*a' gg7e _sao,a - wa - ex--sw. MA, ~ _n a G - & = ,azm x,wp M M#*C* du,r A. ~ f' yJ. a,w v m mrM-A A-e wyn. EE~ fch_A_x6b/ETL~ n=.4nw .AA_. App. w=es,-m um.em (BG-Z=s _ 4 _ L -. p .A --e <e w me.- e6e-mum 'eD=su'l-meme- .*w w ew e ./6 &# 3)f' 't /-l h p. y .j M kN li - MMA' 4 2-W -Acrd l . y$~/ A*d. & b& aee . $,. dG .:!. M W da *< w m f M. n -a-l i l it l.' 4 9 4 e .1

  • t O

't 9 .p

4..... _.

i ~ ~ ~ kDk i n. g n, (%=M) n-

2. s a

- p.. as m w' j d!"" g.- % p - 4 -n -p.m y "$J) 4 -a9 -n-4d<J a m. 1 e W A. ~ yc -p N / / W.'AsSU58W M f ff Af-ff

  1. &V 4"~

n.12~% gA%AA.2A % & 1-4'"~- . R x ~ < p r-, p. a A 35' 4/2T/31 4 DSILY CEr03T-2111 FACILITY / LICENSEE NOTIFICAfinN ITFM OR FvENT EE310%:L LCTION. DIVISION OF ENGINFFRING & TECHNICAL INSPFCTION e LASALLE TELFCON FRON WHILE CLFANING CARLE TRAYS OtsRING THE EVENING INFORMATION. RESIDENT INSPECTOR OF A/73/Rt. CONTRACTOR EMPLOYEES DISCOVERED ON 4/24/01 $0ME RURNFD NON= SAFETY RELATFD CARLES IN THE TUR8tNE HilILDING IN THF RADWASTE AREA. APPARENTLY, THE CAHLFs IAD REEN BURNED SOME TIME AGO. THF INFORMAT8,;eN WAS PASSED ON THE THE FMI AND THF STATE FIRF. MAR?HAL. WHO ARE CONDUCTING AN INVESTIG ATION OF OT'8Ep RECENT FIRE DAMAGE AT THE FACILITY. 9 e O STATUS OF PRFLIMINARY NOTIFICATIONS 4/30/81 ' STATUS SURJECT LICENSEE DIVISION OF ENGINEERING L TECHNICAL INSPECTION LaSALLF Sil5PIC10US FIRT AND OPEN. 4% NOTED IN THE DAILY REPORT OF 4/2T/8Is WORKERS DISCOVERED PREV!0USLY (CEfe PN5-III-SI-0T SUSPECTED ARSON UNREPORTED FIRE DAMAGE To SOME NON= SAFETY RELATED CABLES IN THE TURRINE AND TAI RUILDING. SINCE 4/ll/mle THE LICEN9EE HAS REPORTED FOUR INSTANCES OF FIRE DAMAGE TO VARIOUS CABLES AND ELECTRICAL EQUIPMENT. ONE INSTANCE HAS BEEN CONFIRMED RY THE ILLIN0IS STATE FIRE MARSHAles OFFICE A5 ARSON. THE FBI AND THE STATE FIRE MARSMAL CONTINUE TO INVESTIGATEe AND THE RESIDENT INSPECTOR AND REGIONAL SAFFGUARDS STAFF WILL CONTINUE 70 NONITOR AND WILL A5515T AS NECESSARY. I ? I D 2 2 3 0 j 49F C 3 STATUS OF PHtLIMIN1HY NOTIFICATIONS 5/07/01 2-SUHJFct SIATus 'LICtNSEE DivlSION OF ENGINEEHING & TECHNICAL INSPLCTION LASiLLE SUSPIClouS FINE AND CLOSEU. THIS MATTER IS CLOSED F0H HEPORTING PUHPOSES AT THIS TIME. TMERE INEfe PNS-III-81-07 SUSPECitu ARSON MAVL oEEN No NEW INSTANCLS OF FINES REPORTLD. TML FBI AND THE ILLINOIS AND TAI STATE FINL MANSHAleS OFFICE CONTINUE 10 INVESTIGATE. THE INVESTIGATION MAY TAME SOML TIME TO COMPLETE. WHEN INF0HMATION AND/OR INVESTIGATION RLSULTS AHL PHOVIDED, THLY WILL HE REP 0HTEO. THE Rill SAFEGUARDS STAFF AND THE SHI CONTINUE TO MONITOH THE SITUATION. tr \\ ,4 Oh A at kr4,,WLaw a fm-( M... ~q )L u. AV - mity

1. W a

.;g'.4 - & f-w ~ a w Y A f tw rpA -m-anpnw au sLnn k A A Arm s 3 L / ens. A&&'AarS -M2 N'M ff8 7 sur fM /YtB k i f } i /M sAF-fAr. 72 E' & a f~ J y ' M d " 9 'd s ys-la s a wyp-n a p-r]/ O ' &. 2 M - y g - A~bC= os ? L J' 73[' Q-6sa-M a w -zas

9

/srdwt - y - JAe +;& - p A /;n J T Mw p>rlm 9 - se~n ",7" n,a-w -cw a 577-L N "# } F"- p ' A4=y aw-4. &s&aw u w -w W. A Aeas& As<xM-wn.ir.L M cae-Ad/MAdx L yl's: - \\3 0 . /f "@J zwun a s/ en-vvn. M-Ma w Otcr /Vs fo/ko/Hf +&xA !"f*"' M DA) &4t A6esN-u f7C m. f @/7ja. /fz 4/A(4 <~ MA m ,60 A j ofm.p& - ff

  • V RKf "M44 -

Y? /4L fy & N' m-A- /f@ &7 6 4- .M f fc -- FA f4 A A, .a &,.ra u s ,44 3 se st M -A M a[f 6/J)f-Awanc-e:3z A s' A37 L ~ l hl{ A e p-Tf mp & / [ AuoGr pe Zr n apag- -n W)V M k A n & m p n-fy-Q ??? / gse ~ 3 24/P f/~ &# clubit# G w E - /LL #1Ydd?V A ' xr M M y =;r yn M /WO f*h s u ,,s q a m +g - ac a en W M W NDAer W sp-r/NA fern W y [' 4,.,, M a.ds 4 Azad t -w f t l AM L DAILY REPORT-RI!! 4/15/81 FACILITY / LICENSEE NOTIFICATION ITEM OR EvFNT REGIONAL ACTION DIVISION OF ENSINEERING & TFCHNICAL INSPECTION LASALLE 2 TELECON FRON THF SRI REPORTED THAT A NON-SAFETY RELATED INFORMATION. SENIOR RESIDENT PANEL IN THF UNIT ? TURRINE RUILDING CAUGHT INSPECTOR ISRIl FIRE ON 4/13/81. DURING THE LATE AFTERNOON OR EVENING. BLUEPRINTS BEING USED RY THE CON-STRUCTION DEPARTHENT PRIOR TO THE FIRE WERE FOUND IN THE PANEL ON FIRE. THFRE IS A SLIGHT SUSPICION As 70 HOW THE RLUEPRINTS 00T INTO THF PANEL THAT WAS ON FIRE. THE LOCAL STATION FIRE WATCH EETINGUISHED THE FIRE AND NO DAMAGE WAS INCORoFD TO BUILDING OR PHOPERTY. THE $RI WAS INFORMED BY THE STATION SUPERINTENDENT DURING AND AFTER THE MORNING MEETING ON 4/04/81. to 4 ~.-' e ?- 4/21/81 ~ ILY CEPnNT-Rill .CILITV/LICENSFE NOTIFICATION ITFM OR EVFNT REGIONAL ACTION '] VISION OF ENGINFFRING & TECHNICAL INSPFrTION JSALLE I L 2 TELECON FROM THF AT APPHOEIMATELY Til5 4.M. ON 4/70/Al A FIRF PNS-Ill-RI-07 ISSUE 0 FOR LICENSEE-4/20/RI WAS DISCnVEREO IN A SAFETY RFLATED CARLE TRAY INFORMATION. FOLLOWUP pl%FR LOCATED RETWEEN THF CAHLE SPHFADING ROOM PFR MC 2515. AND THE AUXILIARY ELFCTRIC ROOM. THIS FIRF WAs culCMLY FXTINGUISHED RY SITE PENSONNFL. RFCAUSE WHAT APPEARED TO BE A PETROLEUM PRODUCT WAS FOUND IN THE C4HLE TRAY, THE LICENSEE AND THF STATE FIRE MAR $ HALL WILL CONDUCT AN INVESTI-GAT 10N. THE LICENSEF Mane A PRESS RELEASE ON 6/20/RS. e G e 0 9 e 6 e l \\ STATUS OF PRFLIMINARY NOTIF ICAT IONS 2-4/24/81 LICENSEF SUBJECT %TATUS DIVISICN OF ENGINF.ERING L TECHNICAL INSPECTION LISALLE SUSPICIOUS FIRE AND OPEN. RIII LEARNED THAT THE FBI HAS OPENED A FORMAL INVESTIGATION INTO (CEF. PNS-!!!-81-07 SUSPECTED ARSON THE SUSPECTED ARSON THAT HAS BEEN ASSUMED AT THE FACILITY. THEY ARE AND TAl C00Rn!NATING WITH THE LICENSEE AND ILLINDIS STATE FIRE NARSHAL. LA8-ORATORY ANALYS!$ OF LIQUIn RESIDUE FOUND AT THE SITE OF THE FIRE ON 4/20/81 WAS UNLFADEn GASOLINE. THE RFSIDENT INSPECTOR AND RF.GIONAL SAFEGUARDS STAFF WILL MONITOR THE INVESTIGATION. M h\\ V l l +2- c /4,./s e m ? .b ;{ g "a N '4: fit bil. %U b p' N. y.. .'( ( [3.. f Sk Y[ 5 [ + p Q7 6s : 4;Ye4, G. e, sa l-l s.Mi P itt L; y '?f. Qx t I i9.x o,- vs. ^31 'e -., f 3, .....w._,_,,,,a_g,-. MESUCd$4;.-(as,a 4.

  • S ~- - s, r s '.

,_,,}}