Forwards Application for Ol,Consisting of Acceptance Review Copies of Fsar,Environ Rept (Filed in PDR Category C), Emergency Preparedness Plan (Filed in PDR Category F) & Antitrust Info (Filed in PDR Category M)
ML20053D419
Person / Time
Site: Satsop
Issue date: 05/25/1982
From: Bouchey G
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
To: Harold Denton
Office of Nuclear Reactor Regulation
Shared Package
ML20053D420 List:
References
GO3-82-529, NUDOCS 8206040412
Download: ML20053D419 (3)


Text

'

Washington Public Power Supply System P.O. Box 968 3000 GeorgeWashingto .*Nay Richland, Washington 99352 (509)372-5000 G03-82-529 Docket No: 50-508 May 25, 1982 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555

Dear Mr. Denton:

Subject:

NUCLEAR PROJECT 3 - APPLICATION FOR OPERATING LICENSE Pursuant to 10CFR2.101(a) and 50.30, the Washington Public Power Supply System (Supply System) is filing herewith its Application for an Operating License for Nuclear Project 3 (WNP-3). Authorization for the construction

$ of this project is set forth in Construction Permit CPPR-154 issued by the NRC on April 11, 1978.

c col In accordance with 10CFR50.30(c)(3), the following Operating License submittals for this Project are enclosed:

e Ten (10) copies of the general information required by 10CFR50.33; 90 e Fifteen (15) copies of the Final Safety Analysis Report g o"A (FSAR) including the Emergency Preparedness Plan required by

s. 10CFR50.34 and 50.34a; 8 /,y e Twenty (20) copies of the Environmental Report required by 10CFR Part 51.

. e Five (5) copies of a document entitled "Information for 6 Antitrust Review of Operating License Application" requested o o3 by NRC Requlatory Guide 9.3.

/

sI FO When NRC deems the tendered Application to be acceptable and complete for docketing, we will submit the additional copies of these documents as required by 10CFR50.30.

5#

Pl* N bE6V The antitrust information confirms that there have been no significant changes in our activities subsequent to completion of the construction WM afd f*

. T-fo. permit t antitrustadvice favorable review of this letters Project,by rendered and theconfirms Attorneythe conclusions General at that in yel t&lW 3 h.' be[ 9 EeN W!o b b

  • p a ada pc=

,i kN "

f l pR 8206040412 8205 Pu%y .h C.e6 . kDRADOCK05000 s PDH o.I*

J

I l

HR Denton Page 2 May 25, 1982 WNP Application for Operating License 10CFR50.34(f) establishes a requirement for Operating License Applications to include an evaluation of the facility against the Standard Review Plan (SRP). At the time this rulemaking was promulgated, the WNP-3 Application was in the final publication process and it was not feasible to include this information in the documents now being tendered. Discussions with the NRC Licensing Branch have indicated the acceptability of providing the required information in the docket version of the FSAR and subsequent amendments. We see no reason for the absence of this material to be cause for rejection of the Application.

Additionally, per discussions with the NRC staff, three copies of the FSAR are being forwarded under separate cover to EG&G Idaho for their usage in performing the acceptance review.

Sincerely, M b G. D. Bouchey, D uty Director -

J Safety and Security KWC/sm Enclosures cc: WG Albert - NRC 726 w/o NS Reynolds - D&L w/o D Smithpeter - BPA 762 w/o LL Wheeler - NRC w/o

l .

Offiliecc/rbn [or (0,0flj STATE OF WASHINGTON)

Subject:

dMereMM //cenJe

) ss COUNTY OF BENTON )

I G. D. B0UCHEY, being duly sworn, subscribe to and say that I am the Deputy Director, Safety and Security, for the WASHINGTON PUBLIC POWER SUPPLY SYSTEM, the applicant herein; that I have full authority to execute this oath; that I have reviewed the foregoing; and that to the best of my knowledge, information and belief the statements made in it

.are true.

DATED A7ay c28 , 1982 y

W S w cEen G. D. BOUCHEY, Dep(ty Director Safety & SecuritfJ Or, this day personally appeared before me G. D. BOUCHEY to me known to be the individual who executed the foregoing instrument and acknowledged that he signed the same as his free act and deed for the uses and purposes therein mentioned.

GIVEN under my hand and seal this cf5 M day af ///a / 1982.

Y refa f Y? d W Lg Notary Public in and for the State of Washington Residing at N E nt a Ve d