SAFETY EVALUATION REPORT BY THE OFFICE OF NUCLEAR REACTOR REGULATION SEQUOYAH UNIT 2 DOCKET NO. 50-328 RELIEF FROM INSERVICE INSPECTION REQUIREMENT INTRODUCTION The licensee requested relief from perforining the hydrostatic testing require-ments of Article IWC-5000 under ASME Section XI, following the repair of the by-pass line on the main steam line. Tae licensee found it necessary to remove a portion of the by-pass line in order to perfonn some repcir on a feedwater check valve.

EVALUATION We agree with the licensee that a hydrostatic test in compliance with Section XI (Article IllC-5000) to demonstrate the integrity of the welds is an unneces-sary requirement for the repair of the 2-inch line and its socket welds. The test would require filling the steam generatoo and main steam line with water out to the main steam line check valve.

Such a test could damage support structures and safety-related valves in the main steam line. We conclude that for the repair work in question a leak test at operating pressure and temperature is adequate. The examination of the replacement weld areas shall be aarried out in accordance with Region II requirements.

8206030310 820527 PDR ADOCK 05000328 0

PDR omcc) suance >

omy NRC FORM 318 (1CHO) NRCM Om OFFICIAL RECORD COPY usam mi m.

.--