Text
.
- %
UNilFD e,TATES
.
y
g
NUCLEAR REGULATORY COMMisslON
[
i*e'(
E
RFGION I
7 h
'f
631 Pr.R K AVENUE
( '
niNo or Pauss: A. PENNSVLVANI A 19406
.....
ggttsld{
Docket No. 50-293
Boston Edison Company M/C Nuclear
ATTN: Mr. William D. Harrington
Senior Vice President, Nuclear
800 Boylston Street
Boston, Massachusetts 02199
Gentlemen:
Subject:
Inspection 50-293/82-10
This refers to the routine safety inspection conducted by Mr. J. Johnson of
this office on March 1 - April 4, 1982, at the Pilgrim Nuclear Power Station,
Plymouth, Massachusetts, of activities authorized by NRC License No. DPR-35
and to the discussions of our findings held by Mr. Johnson with Mr. R. Machon
and other members of your staff periodically during the inspection and at the
conclusion of the inspection.
Areas examined during this inspection are described in the NRC Region I In-
spection Report enclosed with this letter. Within these areas, the inspection
consisted of selective examinations of procedures and representative records,
interviews with personnel, and observations by the inspector.
In addition, our inspector examined the items discussed in our letter to you
dated February 18, 1982, regarding actions to be taken by Boston Edison Com-
pany prior to plant restart from the current refueling outage.
Based on the results of this inspection, it appears that one of your activi-
ties was not conducted in full compliance with NRC requirements, as set forth
in the Notice of Violation, enclosed herewith as ?.ppendix A.
This item of
noncompliance has been categorized into the level described in the Federal
Register Notice (47 FR 9987) dated March 9, 1982.
You are required to respond
,
to this letter; and, in preparing your response, you should follow the instruc-
tions in Appendix A.
In addition, it appears that one of your activities was not conducted in con-
formance with your connitment to the NRC contained in a letter dated January
1
25, 1982, concerning actions taken to assure personnel access to the reactor
building truck lock door control panel. You are requested to respond to this
item; and, in preparing your response, you should follow the instructions in
Appendix B.
,
1%k
8205240475 820505
-
-:
PDR ADOCK 05000293
O
CFFICI AI,I?E00ED COPY
fg
E.
.
l
MAY 0 51982
Boston Edison Company M/C Nuclear
2
In acc'
- e with 10 CFR 2.790(a), a copy of this letter and the enclosures
will br
1 in the NRC Public Document Room, unless you notify this office,
by te'
Uthin ten days of the date of this letter and submit written
applb
.ithhold information contained therein within thirty days of
the -
c
letter.
Such application must be consistent with the requirements
of 2
.
Your
.aration with us in this matter is appreciated.
Sincerely,
Original Signed Bys
Richard W. Starostecki, Director,
Division of Project and Resident Programs
Enclosures:
1.
Appendix A, Notice of Violation
2.
Appendix B, Notice of Deviation
3.
NRC Region I Inspection Report Number 50-293/82-10
cc w/encls:
J. N. Bonsall, Chairman, Department of Public Utilities
J. E. Howard, Vice President, Nuclear
R. D. Machon, Nuclear Operations Manager - Pilgrim Station
'
A. V. Morisi, Manager, Nuclear Operations Support
Joanne Shotwell, Assistant Attorney General
l
Plymouth Board of Selectmen
Public Document Room (PDR)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector
Commonwealth of Massachusetts (2)
'
bcc w/encls:
Region I Docket Room (w/ concurrences)
Chief, Operational Support Section (w/o EnCls)
/
4%h
d
RI:DP P
DP
'DPRP
Db
s
. Johnson
Elsasser
Brunner
Starostecki
V
b
tt
f
d' & $b
OFFICIAL RECORD COPY
-
,
_
..
.
_