ML20052G182
| ML20052G182 | |
| Person / Time | |
|---|---|
| Site: | Catawba |
| Issue date: | 03/18/1982 |
| From: | Long F NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML20052G178 | List: |
| References | |
| NUDOCS 8205140382 | |
| Download: ML20052G182 (2) | |
See also: IR 05000413/1982001
Text
?
"
-
% 1
c.
-
,
j-
.. /co
'
=
/
w
. *
s
y
/,
7
.
...
.
,
' . ' .
MAR 18 1982
~
.
Duke ~ Power Company
ATTN:
Mr. W. O. Parker, Jr.
,
Vice President. Steam Production
P. O. Box 2178
Charlotte, NC 28242
Gentlemen:
,
-
Subject:
Report nog 0-413/82%dspd 50-414/82-01
This refers to the routine safety inspection conducted by Mr. A. B. Ruff of this
office on February 23-26, 1982, of activities authorized by NRC. Construction
Permit Nos. CPPR-116 and CPPR-117 for ~ the Catawba Nuclear facility.
Our
preliminagy . findings were discussed with Mr. T. H.
Robertson, Acting Site
Manager, at the conclusion of the inspection.
Areas examined during the~ inspection and our findings are. discussed in the
enclosed inspection report.
Within these areas,. the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by' the inspector.
-
.During the inspection,- it was found that 'certain activities under your license
appear to violate NRC requirements.
This item and -references. to pertinent
requirements are listed in the Notice of Violation enclosed herewith as -
Appendix A.
. Elements to be included in your r'esponse are delineated in-
.
~
Appendix A.
s
We have examined actions you have -taken with regard to previously identified- -
enforcement matters and unresolved items. The status of these items is discussed
in the enclosed report.
s
_ ,
In accordance with 10 CFR 2.790(a), a copy of this letter and'the enclosure's will
'
be placed in the NRC's Public Document Room unless you notify this office,- by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such application must be consistent with this requirements
of 2.790(b)(1).
,
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by .the
-
Paperwork Reduction Act of 1980, PL 96-511.
_
.*
B205140382 820416
_
PDR ADOCK 05000413
G
<
_
j
,
-
.
.
,.
..
.
Duke Fower Company
2
MAR I 8 1982
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
F. J. Long, Acting Chief
Reactor Projects Branch 2
Division of Project and
Resident Programs
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-413/82-01
and 50-414/82-01 _
cc w/ encl:
J. W. Hampton, Station Manager
J. C. Rogers, Project Manager
bcc w/ encl:
Document Management Branch
State of South Carolina
NRC Resident Inspector
RII
RI [
RI
RII
RI
-
Af
l)c{
Alg(nttonis
FJ[o
U.
ABRutt:es
TEconlan
AR rdt
3/4 /d2
3/ #8
3/g/82
3//g/82
3/ /82
.