ML20052G160

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Mar 1982
ML20052G160
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/05/1982
From: Rogers L
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
Shared Package
ML20052G159 List:
References
NUDOCS 8205140360
Download: ML20052G160 (7)


Text

r y

o OPERATING DATA REPORT DOCKET NO.

50-339 DATE 04-05-82 COMPLETED BY L.L. Rogers TELEPHONE (703) 894-5151 X2505 OPERATING STATUS Notes 1.

Unit Name:

North Anna 2 2.

Reporting Period:

March 1982 3.

Licensed Thermal Power (MWt):

2775 4.

Nameplate Rating (Gross MWe):

947 5.

Design Electrical Rating (Net MWe):

907 6.

Maximum Dependable capacity (Gross MWe):

939 7.

M.ximum Dependable Capacity (Net MWe):

890 8.

If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since.Last Report, Give Reasons NA 9.

Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A This honth Yr.-to-Date Cumulative 11.

Hours In Reporting Period 744 2,160 11,352 12.

Number of Hours Reactor Was Critical 144.9 1,481.7 8,896.5 13.

Reactor Reserve Shutdown Hours 0

46.4 1,679.6 14.

Hours Generator On-Line 144.7 1,437.1 8,667.2 15.

Unit Reserve Shutdown Hours 0

0 0

16.

Gross Thermal Energy Generated (MWH) 391,608 3,727,404 22,510,245 17.

Gross Electrical Energy Generated (MWH) 132,083 1,233,691 7,570,923 18.

Net Electrical Energy Generated (MWH) 125,711 1,171,660 7,174,076 19.

Unit Service Factor 19.4 66.5 76.3 20.

Unit Availability Factor 19.4 66.5 76.3 21.

Unit Capacity Factor (Using MDC Net) 19.0 60.9 71.0 22.

Unit Capacity Factor (Using DER Net) 18.6 59.8 69.7 23.

Unit Forced Outage Rate 0

7.1 16.9 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

None 25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

05-16-82 26.

Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION 8205140360 8204158 PDR ADOCK 05000 R

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-339 UNIT NA-2 DATE 04-05-82 COMPLETED BY L.L. Rogers TELEPHONE 703-894-5151X2505 MONTH March DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 868 17 0

2 879 18 0

3 883

'19 0

4 885 20 0

5 885 21 0

6 837 22 0

7 3

23 0

8 0

24 0

9 0

25 0

10 0

26 0

11 0

27 0

12 0

28 0

13 0

29 0

14 0

30 0

15 0

31 0

16 0

INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

n

e UNIT SHITTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-339 UNIT NAME North Anna 2 DATE 04-05-82 REPORT MONTH March COMPLETED BY L. L. ROGERS TELEPHONE (703) 894-5151 X2505 Date Typel 2

Duration Reason Method of Licensee System Component Cause & Corrective (Hours)

Shutting Event Code Code ACli "

  • 3 4

5 Down Reactor Report //

Prevent Recurrence 82-09 820307 S

599.3 C

1 NA NA NA Comomenced scheduled refueling outage.

I 2

3 4

F: Forced Reason:

Method:

Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for. Preparation of Data B-Maintenance or Test 2-Manual. Scram.

Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)

E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other G-Operational Error (Explain) -

H-Other (Explain)

Exhibit H - Same Source a