Forwards Monthly Operating Repts for Mar 1982
ML20052G158
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 04/15/1982
From: Leasburg R
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: Haller N
NRC OFFICE OF MANAGEMENT AND PROGRAM ANALYSIS (MPA)
Shared Package
ML20052G159 List:
References
224, NUDOCS 8205140359
Download: ML20052G158 (1)


Text

. . . , . - -- .-

p ..  !

/ l -

VIRGINI A' LECTRIC AND Powsm CoxPANY Ricnwown, Vsmo NEA 20261

~

4 M. H. Ls Assti30 - .

vic p......., Apri1 . 15, 1982

- Noct a. Dr . arson.

Mr. N. M. Haller, Director Serial No. 224 Office of Management and Program Analysis N0/JHL:acm U. S. Nuclear Regulatory Commission Docket Nos.'50-338 Washington, D. C. 20555 50-339 License Nos.-NPF-4 NPF-7

Dear Mr. Haller:

r Enclosed is the Monthly Operating Report for North Anna Power Station Unit --

Nos. 1 and 2 for.the month of March, 1982.

cp g Very.truly yours.

.b Dxuak -

(

RECEIVED .tg R. H. Leasburg O MAY 131982> -

9- a sm94 tas:n cmsa-

m m auau I

. mc

  • >. p
Enclosure (3 copies) a g cc
Mr. R. C. DeYoung, Director (12 copies)

Office of Inspection and Enforcement Mr. James P. O'Reilly (1 copy)

Regional Administrator.

Region II 1

i t

sy

-F ff R

a Os 4

es --.,--%,

, y-.-_ ..m - _ . , ,, , .,. y4 , . ,_.,-4 y _,

-_.,.1-...--___-,.-y ,m,.-_w.., _ , , , . 7 ,- . , , ,,,.-,,,,m.g 7-

e VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION MONTHLY OPERATING REPORT MOFTH MARCH YEAR 1982 d

l

\

l APPROVED:

o ,

O%

STATION MANAGER y l

L. _ _ _ .- . - - - - --- . - -

v -

OPERATING DATA REPORT DOCKET NO. 50-338 DATE 04-05-82 COMPLETED BY L.L. Rogers TELEPHONE (703) 894-5151 X2505 OPERATING STATUS Notes

1. Unit Name: North Anna 1 1 2. Reporting Period: March 1982
3. Licensed Thermal Power (MWt): 2775
4. Nameplate Rating (Gross MWe): 947
5. Design Electrical Rating (Net MWe): 907
6. Maximum Dependable Capacity (Gross MWe): 918-
7. Maximum Dependable Capacity (Net MWe): 865
8. If Changes Occur in Capacity Ratings (Items No. 3 thru 7) Since Last Report, Give Reasons-NA
9. Power Level To Which Restricted, If Any (Net MWe): N/A
10. Reasons For Restrictions, If Any: N/A This Month Yr.-to-Date Cumulative
11. Hours In Reporting Period 744 2,160 33,481
12. Number of Hours Reactor Was Critical 744 2,138.5 25,966.8
13. Reactor Reserve Shutdown Hours- 0 21.5 256.4
14. Hours Generator On-Line 744 2,126.2 25,479.2
15. Unit Reserve Shutdown Hours 0 0 0
16. Gross Thermal Energy Generated (MWH) 2,062,037 5,756,249 66,070,501
17. Gross Electrical Energy Generated (MWH) 661,525 1,845,185 21,090,707
18. Net Electrical Energy Generated (MWH) 626,064 1,746,367 19,869,283
19. Unit Service Factor 100 98.4 76.1
20. Unit Availability Factor 100 98.4 76.1
21. Unit Capacity Factor (Using MDC Net) 97.3 93.4 68.6
22. Unit Capacity Factor (Using DER Net) 92.8 89.1 65.4
23. Unit Forced Outage Rate 0 1.3 4.5
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

Refueling Outage 05-21-82 thru 07-02-82

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIAL CRITICALITY INITIAL ELECTRICITY COMMERCIAL OPERATION

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-338 UNIT NA-1 DATE 04-05-82

. COMPLETED BY L.L. Rogers TELEPHONE 703-894-5151X250 MONTH March DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 1 843 17 841

~

2 845 18 842 3 843 .19 838 4 849 20 835 5 848 21 839 6 845 22 839 7 841 23 840 8 842 24 840 9 847 25 842 10 845 26 842 11 841 27 841 12 842 28 841 13 835 29 840 14 839 30 839 15 842 31 840 16 842 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

UNIT SIIUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-338 UNIT NAME North Anna 1 DATE 04-05-82 REPORT MONTH MARCII COMPLETED BY L. L. K0GERS TELEPHONE (703) 894-5151 X2505 Type Duration Reason 2 l

No. Date Method of Licensee System Component Cause & Corrective (Hours) Shutting 3

vent de 4

Code Action to 5

Down Reactor Report # Prevent Recurrence For the period from March I through March 31, 1982 there were no shutdown or significant power reductions.

1 2 3 4 F: Forced Reason: Method: Exhibit F - Instructions S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continuations (NUREG-0161)

E-Operator Training & License Examination 5-Load Reduction F-Administrative 9-Other 5

G-Operational Error (Explain)

H-Other (Explain) Exhibit H - Same Source

-