Proposed Tech Specs 3/4.3.3 Re Leakage Limiting Condition for Operation & Surveillance Requirements & Table 4.14.1 Re Process & Internal Monitoring
ML20052F534
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 05/06/1982
From:
COMMONWEALTH EDISON CO.
To:
Shared Package
ML20052F530 List:
References
NUDOCS 8205130160
Download: ML20052F534 (2)


Text

. '.

LIMITING C0toITION FOR OPERATION SURVEILLANCE REQUIREMENTS 3.3.3 Leakage (per unit) 4.3.3 Leakage (per unit)

A.

If the leakage rate, from other than A.

When Reactor Coolant System pressure is controlled leakage sources, such as the greater than 500 psig, one of the vum gg Reactor Coolant Pump Controlled Leakage following monitoring requirements shall u

Seals, exceeds 1 gpm and the source of the be performed (4.3.3.A.1 or 4.3.3.A.2):

E

' leakage is not identified within oo twenty-four hours of detection, the 1.

Containment activity shall be 95 reactor shall be brought to hot shutdown monitored shiftly via monitor o

within four hours. If the source of the ORIA-PR 4 0 Oc3 leakage is not identified within an gg additional 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />, the reactor shall be 2.

Manual sampling of the containment ou brought to a cold shutdown condition atmosphere shall t.e performed once a M

within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br />.

shift.

.cii y

./

Br If the sources of leakage are identified B. ~ When Reactor Coolant System pressure is 5

and the results of the evaluations are greater than 500 psig at least three of the following monitoring requirements

-that continued operaticn is safs,'

1 operation of the reactor with a total shall be performed (4.3.3.B.1, 2, 3, 4, leakage, other than leakage from and 5):

f.

,r controlled sources, not exceeding 10 gpm

/

shall be permitted except as specified in 3.3.3.C below.

.e 4

4

{

95 0077t 0098A

.4 I

MONITORED LOCATION INSTRtNENT NLNBER UNIT 1 or 2 COPNON Control Room RE-0001_

Control Room l

ORIA-PR29 Fuel Building ORT-AR03 Fuel Building RE-0005 Steam Pipe Tunnel RT-PR07A RT-PR078 RT-PRIS Condensor Air Ejector RE-0015 Containment Ventilation l-RIA-PR40 Containment Purge RT PR09A Containment Purge RT PR098 Aux Bldg Area Monitor ORT-AR04 Aux Bldg Area Monitor ORT-AR08 Aux Bldg Area Monitor ORT-AR09 Process and Internal Monitoring TABLE 4.14-1 252 0077t

.