Concludes That 811210 Draft Evaluation of SEP Topics VI-2.D Re Mass & Energy Release for Possible Pipe Break Inside Containment & VI-3 Re Containment Pressure & Heat Removal Capability,Was Factually Correct
ML20052D123
Person / Time
Site: Oyster Creek
Issue date: 04/30/1982
From: Crutchfield D
Office of Nuclear Reactor Regulation
To: Fiedler P
JERSEY CENTRAL POWER & LIGHT CO.
References
TASK-06-02.D, TASK-06-03, TASK-6-2.D, TASK-6-3, TASK-RR LSO5-82-04-088, LSO5-82-4-88, NUDOCS 8205060295
Download: ML20052D123 (2)


Text

.,

N M

April 30,1982

\\ 32L1"t '

Docket No. 50-219 fge'/

Q, LS05-82-04-088 v

Q g',,'-

D V

,,.s p

a s

Mr. P. B. Fiedler (61 ~. +

9, j

Vice President and Director-Oyster Creek

\\h g/

Oyster Creek Nuclear Generating Station

'A y

Post Office Box 388 A

Forked River, New Jersey 08731 M

Dear Mr. Fiedler:

SUBJECT:

SYSTEMATIC EVALUATION PROGRAM (SEP) FOR THE OYSTER CREEK NUCLEAR POWER PLANT - EVALUATION REPORT ON TOPICS VI-2.0 AND VI-3 By letter dated December 10, 1981, you were sent a copy of our draft evaluation of SEP Topics VI-2.D, " Mass and Energy Release for Possible Pipe Break Inside Containment," and VI-3, " Containment Pressure and Heat Removal Capability." That evaluation compared your facility, as described in Docket No. 50-219 with the criteria currently used by the regulatory staff for licensing new facilities. Also, included in that letter was a request that you inform us if your as-built facility differed from the licensing basis assumed in our assessment and comments were requested within 30 days of the receipt of that letter so that they could be considered in our final evaluation. Since no comments have been received we have concluded that our draft evaluation was factually M

correct, therefore, we now consider it final.

bs That evaluation will be a basic input to bhe integrated safety assess-

/ /

ment for your facility. That assessment may be revised in the future gE[St) if your facility design is changed or if NRC criteria relating to this p subject are modified before the integrcted assessment is completed.

ADW.

Sincerely,

2. b Dennis M. Crutchfield, Chief Operating Reactors Branch No. 5 Division of Licensing cc: See next page 8205060295 820430 AD:,A:DL PDR ADOCK 05000219 GL 'nas P

PDR i,

$ n%/

hion a i4

..S.EP.QL 'k..S.Ef.B.iD SD

.S Mk......

OFFICE) c..........

..R.F..e..l.l.............

..RHe. rmann...... W..Ru..s.s.e.l..l....

JLomb D

c 1 eld

. S.B.r..o..s..< d k g,,,>

g

...sua.8i...... 44L82..........9hwI8.......9uW82......

  • !n!8

. *!MLB2 om>

IFICIAL RECORD COPY uso m nu - m om sac ronu m oo-eai nneu oao

(

s

[

Mr. P. B. Fiedler cc G. F. Trowbridge, Esquire Resident Inspector t

Shaw, Pittman, Potts and Trowbridge c/o U. S. NRC 1800 M Street, N. W.

Post Office Box 445 Washington, D. C.

20036 Forked River, New Jersey 08731 l

J. B. Lieberman, Esquire Commissioner Carlack, Israels & Lieberman New Jersey Department of Energy 26 Broadway 101 Commerce Street New York, New York 10004 Newark,-New Jersey 07102

, Ronald C. Haynes, Regional Administrator Nuclear Regulatory Commission, Region I 631 Park Avenue King of Prussia, Pennsyl.vania 19406 J..Knubel BWR Licensing Manager GPU Nuclear 100 Interplace Parkway

(

Parsippany, New Jersey 07054 Deputy Attorney General l

State of New Jersey

(

Department of Law and Public Safety l

36 West State Street - CN 112 j

Trenton, New Jersey 08625 Mayor Lacey Township 818 Lacey Road Fatrked River, New Jersey 08731 U. S. Environmental Protection Agency Region II Office

(

ATTN:

Regional Radiation Repr'esentative 26 Federal Plaza

. New York, New York 10007 Licensing Supervisor Oyster Creek Nuclear Generating Station Post Office Box 388 Forked River, New Jersey 08731 l

l