Text
f.; y ,
g/hu.)
MAR 0 21982
Carolina Power and Light Company
ATTN: Mr. J. A. Jones, Senior Executive
Vice President and Chief
Operating Officer
411 Fayetteville Street
Raleigh, NC 27602
Gentlemen:
Subject: Report NosM24/82-033nd 50-325/82-03
This refers to the routine safety inspection conducted by Mr. J. R. Wray of this
office on January 25-29, 1982, of activities authorized by NRC Operating License
Nos. DPR-71 and DPR-62 for the Brunswick facility. Our preliminary findings were
discussed with Mr. C. R. Dietz, General Manager, at the conclusion of the inspec-
tion.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report.
Within these areas, the inspection consisted of
selective examinations of procedures-and representative records, interviews with
personnel, and observations by the inspectors.
During the inspection, it was found that certain activities under your license
appear to violate NRC requirements.
This and references to pertinent
requirements are listed in the Notice of Violation enclosed herewith as
Appendix A.
Elements to be included in your response are delineated in
Appendix A.
In accordance with 10 CFR 2.790(a), ' copy of this letter and the enclosures will
a
be placed in the NRC's Public Document Room unless you notify this office, by
telephone, within ten days of the date of this letter and submit written
application to withhold information contained therein within thirty days of the
date of this letter. Such' application must be consistent with the requirements
of 2.790(b)(1).
'
The responses directed by this letter and the enclosures are not subject to the
clearance procedures of the Office of Management and Budget as required by the
Paperwork Reduction Act of 1980, PL 96-511.
1
8205040730 820420
-
DR ADOCK 050003g4
f;:
' -
__
._
-
-
.
. -
~
MAR 0 21982
'
'
Carolina Power and Light Co.
2
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
F. S. Cantrell, Acting Chief
Reactor Projects Branch 1
Division of Resident and
Reactor Project Inspection
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report Nos. 50-324/82-03
and 50-325/82-03
cc w/ encl:
C. R. Dietz, Plant Manager
bec w/ encl:
Document Management Branch
State of North Carolina
NRC Resident Inspector
,
RII
RI
RII
RII
RII
1 P
.
74
g ,)
JNYy:es
K rr
A 'h
C
an
FSCantrell
f6l/82
2/g/82
2 2 82
l i32-
}/g/82
/
sju8v
,