_
t s
I N
~
V G CT Carolina Power & Light Company J
6 NI
,cn,-
Brunswick Steam Electric Plant P. O.~ Box 10429
- -Southport,.NC 28461-0429 IN2rch 31, 1982 FILE: B09-13510 SERIAL:
BSEP/82-629 Mr...ames P. O'Reilly,.Diregtor U. S. Nuclear Regulatory Commission _
..s
-Region II, Suite 3100 101 Marietta Street N.W.
~
Atlanta, GA 30303 t
BRUNSWICK STEAM ELECTRIC PLANT, UNIT NOS. 1&2 LICENSE NOS. DPR-71 AND DPR-62
" ^ ^ '
DOCKET NOS. 50-325 AND 50-324 RESPONSE TO INFRACTIONS OF NRC REQUIREMENTS
Dear Mr. O'Reilly:
i'
.' The Brunswick Steam Electric Planc (BSEP) has received IE Inspection Report 50-324/82-03 and 50-325/32-03 and finds that it does not contain any infordation,of a proprietary natura.
The.rchort identified one item that appears to be in noncompliance with NRC reqbirements. This item and Carolina Power & Light Company's response are addr'essed in the followingstext:
Violation (Severity Level V):
Technical Specification 6.11 states that written procedures shall be prepared consistent with the requirements of 10CFR20 and shall be approved, maintained and adhered to for all operations involving personnel radiation exposure.
ContEary to the above,; procedures involving personnel radiation exposure were not adhered to in that:'-
11.
On anuary 19, 1982, an individual was issued a respirator without documentation in his exposure file indicating that he had received practical training in the wearing of a respirator as required by procedure E&RC-0220, paragraph 8.3.2.
x v
8205040724 0 0420 PDR ADOCK 05000324 0
PDR 4
([l
[
g j5 )
Mr. James P. O'Reilly March 31, 1982 2.
During January,1982, five individuals entered the Unit No. 2 drivell while the reactor was critical and did not have a specific RWP for their drywell entry as required by paragraph 8 of procedure E&RC-0261. These individuals were signed in on a seven-day standing RWP for routing inspections and operations.
Carolina Power & Light Company's Response:
Carolina Power & Light Company acknowledges that the two examples of the identified violation violates NRC requirements.
An investigation into the first event determined that the Radiation Control technicians responsible for administering the respirator training failed to make the required entry in the individuals exposure file on December 4, 1981, when the individual received his personal qualification card showing that he had received the required training. This parsonal qualification card is used by Radiation Control personnel responsible for issuing respiratory equipment to verify that the person receiving the respirator is qualified. When the discrepancy was noted in the individuals exposure file, the individual was given another respirator booth test and appropriate entries in the exposure file were made.
Radiation Control personnel responsible for administering respirator qualification training have been instructed to update each individual's exposure file concurrent with the issuance of the individual's qualification card. Compliance with this item is considered complete.
An invastigation of the second event determined that the Operations personnel involved failed to recognize that their standard seven-day RWP for inspection and operation was not adequate for entry into the drywell while at power. To prevent a similar problem in the future, copies of procedure E&RC-0261, Drywell Entry, and E&RC-0230, Issue and Use of Radiation Work Permits, have been forwarded to the Manager - Operations for incorporation into Operations training. Additionally, personnel from the Environmental and Radiation Control Subunit will meet with Operations management personnel to discuss the use of the seven-day inspection and operation RWP and when a job-specific RWP is applicable. These actions will be completed by May 15, 1982.
Very truly yours, c3..=y-C. R. Dietz, General Manager Brunswick Steam Electric Plant RMP/mcg C. R. Dietz, having been duly sworn, did depose and say that the information contained herein is true and correct to his own personal knowledge or based upon information and belief.
My commission expires:
hhha M.
ru Notary Public cc:
Mr. V. Stello, Jr.