Forwards IE Insp Repts 50-400/82-02 & 50-401/82-02 on 811220-820120 & Notice of Violation
ML20050A606
Person / Time
Site: Harris  Duke Energy icon.png
Issue date: 02/09/1982
From: Cantrell F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Jackie Jones
CAROLINA POWER & LIGHT CO.
Shared Package
ML20050A594 List:
References
NUDOCS 8204010480
Download: ML20050A606 (2)


See also: IR 05000400/1982002

Text

s

', _ .,

ftI} Q td

~

.

'

FEB 0 9199g

>

Carolina Power and Light Company

-ATTN: Mr. J. A. Jones, Senior Executive

Vice President and Chief

Operating Officer

411 Fayetteville Street

Raleigh, NC 27602

Gentlemen:

Subject: Report NosG-400/8F02 band 50-401/82-02

This refers to the routine safety inspection conducted by Mr. G. F. Maxwell of

this office on December 20, 1981 - January 20, 1982, of activities authorized by

NRC Construction Permit Nos. CPPR-158 and CPPR-159 for the Shearon Harris

facility. Our preliminary findings were discussed with Mr. R. M. Parsons, Site

Manager, at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enc!osed inspection report. Within these areas, the inspection consisted of

"

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to violate NRC requirements. This item and raferences to pertinent

requirements are listed in the Notice of Violatio,e anclosed herewith as

Appendix A.

Elements to be included in your response are delineated in

Apper. dix A.

One new unresolved item is identified in the enclosed inspection report. This

item will be exmined during subsequent inspections.

t

In accordance with 10 CFR 2.790(a), a copy of this letter and the enclosures will

.

be plar.ed in the NRC's Public Document Room unless you notify this office, by

telephoce, within ten days of the date of this letter and submit written

applicai. ion to withhold information contained therein within thirty days of the

date of this letter. Such applicatinn must be consistent with the requirements

'

of2.790(b)(1).

The responses directed by this letter and the enclosures are not subject to the

clearance procedures of the Office of Management and Budget as required by the

Paperwork Reduction Act of 1980, PL 96-511.

n

B204010480 820323

PDR ADOCK 05000400

G.

PDR

.

-

-

_

_

.-

!

.

. *

,

.

+

FEi

Carolina Power'& Light Company

2

.;82

,

k

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

!

F. S. Cantrell, Acting Chief

Reactor Project Branch 1

f

Division of Resident and

l

Reactor Project Inspection

,

!

Enclosures:

1.

Appendix A, Notice of Violation

'

2.

Inspection Report Nos. 50-400/82-02

'

and 50-401/82-02

,

cc w/ encl:

l

R. Parsons, Site flanager

-

i

i

i

bcc w/ encl:

NRC Resident Inspector

Dccument Management Branch

i

State of North Carolina

.

!

.

,

.

I

L

'

,

i

!

RII

RII

RI

RII

Gita% '

l

'C

(W

L

'

'

f

xwe

t

CJtfTian

CBu ger

FSCantrell

i

j

-1/ /3r

1/ /82

Wf /82

yf/82

1[k[3b'

~ h'9pt-

't

--

,

.w--

, - -

, . -

,,

, - . -