Forwards IE Insp Rept 50-508/82-03 on 820201-05.No Noncompliance Noted
ML20049K068
Person / Time
Site: Satsop
Issue date: 03/01/1982
From: Faulkenberry B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20049K069 List:
References
NUDOCS 8203290369
Download: ML20049K068 (1)


See also: IR 05000508/1982003

Text

. . _ _ -

--

D

W2

27

7

&y'

?

,

("

.?

%-

V

W

C

O

4

.

1 1982

.

Docket No. 50-508

h-

f,0

q

/

s

-

Washington Public Power Supply System

<d

RECEW?D

4

-

P. O. Box 1223

2

' 'J ' - 42

M/lR 2 G1982>-

L

Elma, Washington 98541

-

9' tememne.nn

4

Attention: Mr. R. S. Leddick

ca s'w n .

J

'

"

Program Director WNP-3

c3

Gentlemen:

A

g

Subject:

NRC Inspection at Washington Nuclear Project flo. 3 (WNP-3)

This refers to the routine inspection conducted by Mr. D. P. Haist of

,

this office on February 1-5, 1982 of activities authorized by NRC

i

Construction Permit No. CPPR-154, and to the discussion of our findings

i

held by Mr. Haist with you and other members of your staff at the

conclusion of the inspection.

'

Areas examined during this inspection are described in the enclosed

inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, inter-

views with personnel, and observations by the inspector.

tio itens of noncompliance with NRC requirements were identified within

the scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the

enclosure will be placed in the NRC Public Document Room unless you

notify this office, by telephone, within ten days of the date of this

letter and submit written application to withhold information contained

therein within thirty days of the date of this letter. Such application

must be consistent with the requirements of 2.790(b)(1).

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

bec:

DMB/ Document Control Desk (RIDS)

Sincerely,

Original signed by

Distributed b RV:

T. W. Bishop for

Engelken(ltr

B. H. Faulkenberry, Chief

ResidentInspector(5)

Reactor Construction Projects Branch

State of WA (Lewis)

Enclosure:

Inspection Report

'

No. 50-508/82-03

l

cc w/ enclosure:

D. E. Dobson, Pro ect Manager

gOj

R. B. Glasscock. uality Assurance

A

Direc tor

p

~

F

f

g

omer)

l"

-

8205565 6 52656i"

3A.....~..--.. " biM5""'"

"FX0EKENBERRY

'

" " ' " " ' " "

'"

, su,

PDR ADOCK 05000508

. ........-.... . .

.

.. . .. ...

.

... ..

.

. . , , , ,.

......[.........,, ,,g,,,,,,,,

G

PDR

2/2 /82

/82

. . . . . . . . . . 2. ././.f. ./. 82

.......... ....i........

, , . . . , , , , , , ,

,, ,,

,

......

l NRC F

RM IB M 8 INRCMO24

OFFICIAL RECOFiD COPY

4 uscro i.eo_329

2.

-

_ _ . _ . . _ _ _ __

.

_

_

-.

.- -

-

. .