ML20049J875

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-508/82-02 & 50-509/82-01 on 820101-31.No Noncompliance Noted
ML20049J875
Person / Time
Site: Satsop
Issue date: 03/09/1982
From: Bishop T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Leddick R
WASHINGTON PUBLIC POWER SUPPLY SYSTEM
Shared Package
ML20049J876 List:
References
NUDOCS 8203290178
Download: ML20049J875 (2)


See also: IR 05000508/1982002

Text

.

$

f'

E

([

j"

..

MAR

C Bc2

O

IQ.Ij

O

i

Docket No. 50-508, 50-509

$$

g

RECEIVED

C4

-::

MAR 2 G 19829-

-

9 ruxau mumman

'

I

Washington Public Power Supply System

=u gyam it

P.

O.

Box 1223

s'g

.

Elma, Washington 98541

6

A

u

Attention:

Mr.

R.

S. Leddick

Program Director, WNP-3/5

Gentlemen:

Subject:

NRC Inspection at Washington Nuclear Projects Nos. 3 and 5

(WNP-3/5)

This refers to the inspection conducted by Mr.

W.

G. Albert of this

office on January 1-31, 1982 of activities authorized by NRC Construc-

tion Permit Nos. CPPR-154 and CPPR-155, and to the discussion of our

findings with Mr.

R.

S.

Leddick and other members of your staff at the

conclusion of the inspection.

Areas examined during this inspection are described in the enclosed

inspection report.

Within these areas, the inspection consisted of

celective examinations of procedures and representative records, in-

tarviews with personnel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identified

within the scope of this inspection.

In accordance with 10 CFR 2.790(a), a copy of this letter and the

enclosure will be placed in the NRC Public Document Rcom unless

you notify this office, by telephone, within ten days of the date

of this letter and submit written application to withhold information

contained therein within thirty days of the date of this letter.

Such application must be consistent with the requirements of

2.790(b)(1).

O hhhhog

l

PDR

,

"'#'> . .R.y.: e gh. .

~ h. . . .

~ .

.

.

~ . . - . - . ~ . . .

~ . . . . . . . ~ . -

- .- -..

~~ .-~~~.

Ju "^**> . .W ... A.1 b ,e r ty R .,, D o d d .s , ,,T,.

,B,i s,h.9,p ...

..

,,, ... ..

..

.. ... . . .......

. ..

. . . .

.. ... .... ....

'#'I .1/.4../.8.2.... .3/.d/&2...... 1/

../.8.2....

..

......... .........

. . . . . . . . . . . . . . ~ . .

. - -

. . . - - -

- ~ - ~ ~ -

dFFICIAL RECORD COPY

N?.'C FORM 318 stO 80l NRCM O240

  • " '** - 29 e24

t

,

.

Weehington Publ c Power Supply System ~2-

MAR

S 1982

Should you have any questions concerning this inspection, we will

be glad to discuss them with you.

Sincerely,

s

l

'

'

-

T.

W.

f.s h o p , Acting Chief

Reactor Construction Projects Etanch

Enclosure:

HRC Inspection Report

No. 50-500/82-02 and 50-509/82-01

cc w/o enclosure:

R.

L.

Glasscock, Quality Assurance Director

D.

E.

Dobson, Project Manager

G. C. Sorensen, WPPSS

bcc:

DMB/ Document Control Desk (RIDS)

Distributed by RV:

Resident Inspectors

RHE

State of WA (Lewis)