Docket No. 50-508, 50-509
$$
g
RECEIVED
C4
-::
MAR 2 G 19829-
-
9 ruxau mumman
'
I
Washington Public Power Supply System
=u gyam it
P.
O.
Box 1223
s'g
.
Elma, Washington 98541
6
A
u
Attention:
Mr.
R.
S. Leddick
Program Director, WNP-3/5
Gentlemen:
Subject:
NRC Inspection at Washington Nuclear Projects Nos. 3 and 5
(WNP-3/5)
This refers to the inspection conducted by Mr.
W.
G. Albert of this
office on January 1-31, 1982 of activities authorized by NRC Construc-
tion Permit Nos. CPPR-154 and CPPR-155, and to the discussion of our
findings with Mr.
R.
S.
Leddick and other members of your staff at the
conclusion of the inspection.
Areas examined during this inspection are described in the enclosed
inspection report.
Within these areas, the inspection consisted of
celective examinations of procedures and representative records, in-
tarviews with personnel, and observations by the inspectors.
No items of noncompliance with NRC requirements were identified
within the scope of this inspection.
In accordance with 10 CFR 2.790(a), a copy of this letter and the
enclosure will be placed in the NRC Public Document Rcom unless
you notify this office, by telephone, within ten days of the date
of this letter and submit written application to withhold information
contained therein within thirty days of the date of this letter.
Such application must be consistent with the requirements of
2.790(b)(1).
O hhhhog
l
,
"'#'> . .R.y.: e gh. .
~ h. . . .
~ .
.
.
~ . . - . - . ~ . . .
~ . . . . . . . ~ . -
- .- -..
~~ .-~~~.
Ju "^**> . .W ... A.1 b ,e r ty R .,, D o d d .s , ,,T,.
,B,i s,h.9,p ...
..
,,, ... ..
..
.. ... . . .......
. ..
. . . .
.. ... .... ....
'#'I .1/.4../.8.2.... .3/.d/&2...... 1/
../.8.2....
..
......... .........
. . . . . . . . . . . . . . ~ . .
. - -
. . . - - -
- ~ - ~ ~ -
dFFICIAL RECORD COPY
N?.'C FORM 318 stO 80l NRCM O240
- " '** - 29 e24
t
,
.
Weehington Publ c Power Supply System ~2-
S 1982
Should you have any questions concerning this inspection, we will
be glad to discuss them with you.
Sincerely,
s
l
'
'
-
T.
W.
f.s h o p , Acting Chief
Reactor Construction Projects Etanch
Enclosure:
HRC Inspection Report
No. 50-500/82-02 and 50-509/82-01
cc w/o enclosure:
R.
L.
Glasscock, Quality Assurance Director
D.
E.
Dobson, Project Manager
G. C. Sorensen, WPPSS