_-_
y Pcce 1 w
IML-A3h Revision 0 SFWOYA'i NUCLEAR PIAI'T 12/18/79 IGII;Tn;AMCE SEC2IOd
--e LIPTI!!G DEVICL PREVI:.I;TIVE I'.AII:TE*:E!CE PRO?,Eh.
Thi: maintennnec Ocetion letter describec.the inspection program conducted by thc.maintenanec section on cverheed craner, mobile cranen, fork lifts, chain fall:
and lover haintn. Pol:,r crancs, the nuniliary building crane and the turbine building crane arc excluded from this !GL but are redrcccad under Standard y
Practice S G31 and heve maintenance inctruct.4ons written for cach r,pecific crane.
Overhead cronec, m> bile crancs and fork lifts vill be inspected es near annually as pos::ible with the results of the incpection documented cn the attached data chects numbern J23L-A34-1,14SL-A314-2, and 13L-434-3 Fucre applicabic, the inspecticn chall inclub:
~
1.
Visual incpection of hooks, shee.vcs, cnd drum for deformation or crr.chs.
2.
Visual inspection of vire ropes for near, hinking, crushing, and broken strands.
3.
Visual incpection for cil leaks.
4.
Visual inspection of brahes for proper seating and vcar.
5 Without a load, operate all controln for proper function,
..j 6.
Chech primary lir.it suitches for each notion.
7 Vicuany in pect for all structural derage.
8.
Visually incpect load brake and motor brake for uear.
~
Portable lifting devices such as chaini' alls and lever hoints shall be ctored in the toolroom and chall be inspected on a continuing basic by the toolroom attendt.nt who shall be a journeyman craftsman trained in the use, function and condition of all connon power plant maintenance toole. JIaintenance Section,
=
Letter A-28 delineatec the maintenance re:ponsibilities of the toolroom attendant, All lifting devices fcund defective by the toolroom attendant chall be repaired ty or destroyed. No additional docunentation of the toolrcom inspection is required than that covered by I'.SL-A28.
The followint; overhead crancs and hoists shall be inspected as near nnnually ar_
_Doscible with the results of the incoections documentect,[on Data Shcot IGL-A31+-1..
Major defectn chall be repaired undei our normal'TE$LYl Ieport procedure. 1.!inor 4cfects chall be corrected at the time of the inspection and documented on the data cheet.
CRMES AliD '-iOISTS DATA UH1'?
!%R. NO.
CAPACITY LOCATION EIEVATICU LUILDING UO.
SfN 44N375-2 8 ton-IEPT Condenser 685 Turbine 1
Later 44N375-2 8 ten 2ErT condenser-685 Turbine 1
Later 44N375-2 8 ton 172T condensers 68s Turbine 2
Later oN o ensers 6$
MMnc 2
U.ter
[
at 8203040564 820301
~~
PDR ADOCK 05000327 P
r L
Pa62 2
~
MSL-A34 Revision 1 6/9/76
~
CRANES AND HOISTS DATA UNIT MARI: NO.
CAPACITY IDCATION EIIVATION BUILDING NO.
S/N MIG 76-2 8 ton Condensate Pu=p 662.5 Turbine 1
Later MIG 76-2 8 ton Condensate Pu=p 662.5 Turbine 2
Later MIG 76 4 1/2 ton Lube 011 Dispensing Room 706 Turbine O
Later MIG 80-1 1 ton Sheetmetc1 Shop 706 Service O
AP198766 MN380-2 2 ton Electric Shop 706 Service O
AD198762 N*
MIG 80-3 3 ton Power Stores 690 Service O
AP199758 i
MIG 80-4 3 ton Power Stores 706 Service O
AP198760 MN380-5 1 ton Paint Shop 718 Service O
AP198768 b
MIG 80-5 1 ton Insulation Shop 718 Service 0
-AP198770 x MIG 30-5 1 ton Carpenter Shop 718 Service O
AP198769 MIG 80-6' 1 ton Waste Baler Shipping Room 706 Service O
Later MN380-7 1 ton Boilermaker Shop Stq.
690 Service O
Later WN380-8 1 ton Paint Shop 706 Service O
AP198768 MN380-9 5 ton Main Shop 690 Service O
V-35143 C MIGS 2-1 1/2 ton Diesel Building 722 Diesel Gen-O Later 1
o MIG 82-1 1/2 ton Diesel Building 722 Diesel Gen.
O Later j
o MIG 82-1 1/2 ton Diesel Building 722 Di,esel Gen.
O Later o MIGB2-1 1/2 ton Diesel Building 722 Diesel Gen.
O Later mfg 82-4 1 ton Equipnent Room 740.5 Diesel Gen.
O Iater MN387-2 1 ton Behind Elevator 653 Auxiliary 0
Later MN387-3 2 ton Safety Injection Pumps 669 Auxiliary 2
Later
! y1 MN387-10 h ton RHR Pumps 653 Auxiliary 1
Later l
WN387-10 4 ton Rim Pumps 653 Auxiliary 1
Later 1.
Pat. number only.
l, GRevision
r Page 3 10L-A34 EcVision 0 12/18/75 M
CE/J.rt:S 1G3) UOIJi'3 DATA UlTAT l' ARK !!O, CAPACI"5 IOC.1TICII ELWATION BUILDI:'S I!0 S/I!
441G87-lo 4 ton RIa Pumps 653 Auxiliary 2
Later h417387-lo 4 ton RF2 Pups 653 Auxiliary 2
Later 44H387-11 2 ton out ide, rim Pump 2a-a 653 Auxiliary o
Later h4N387-12 5 ton Aa:, uncte Evap, reed Filter 653 Auxiliary o
T-47214 44IG88-1 5 ton Concentrate Filter 669 Aux 111e y o
T-47213 441G88-2 5 ton outcide Safety Injection 669 Auxiliary 1
Later Puup JA-A 141G89-1 4 ten Control Rod Drive 759 Auxiliary 1
Later 1
Equipment Room 3
s 44H389-1 h ton Control nod Drive 759 Auxiliary 2
Later Equipment Rooms
~
h41G89-2 3 ton Befueling Room 734 Auxiliary 1
Later hh:G89-2 3 ton Refuelins Room 734 Auxiliary 2
Later w
441G89-3 6 ton 480-v soard noom JA & 2a, 749 Auxiliary 1
Later
}
A12, U e
4hN389-3 6 ton 400-v Board Room la & 2a, 749 Auxiliary 2
Later A12, U
~
44H389-4 3 ton Corridor A5, U 714 Auxiliary 1
Later 4h G89-4 3 ton Corridor All, U 714 Auxiliary 2
Later 441G89-6 6 ton Corridor AS, T 714 Auxiliary 1
Later 441689-6 6 ton Corridor A12, T 714 Auxiliary 2
Later 44!G89-7 6 ton Corridor AS, T 714 Auxiliary 1
Later 441589-7 6 ton Corridor A12, T 714 Auxiliary 2
Later G
hhIG89-8 5 ton' Corridor Hearent 71h Auxiliary 0
Later
~
Reactor AB, X
~
-me
i F
Page If t :-
r.3L-/>34 Revision 3 3/15/77 5
i b
CICd;ES AND E01GT3 DATA i
UdiT f
MARK UO.
Cf.PACITY IDCA" ION ELEVATIC:!
BUILDINO I!0.
Sh!
I hhM389-10 5 ton Corridor AB, R 714 Auxilicry 0
Later 441G89-H 5 ten Corridor Alh, R 690 Auxiliary o
Later 4hN389-14 3 ton Deconterination Fcca 690 Auxilia:y 0
Later 44N389-16 5 ton Corridor AB, R 714 Auxiliary 0
Lster 441G07 6 ten Waste Handling at Railroad 7C6 Auxiliary 0
306h0 t-441G92-2 5 ton Additional Equipment Roon 763.5 Auxiliary 0
T-47210 44U395-2 2 ton To Mech. noen 669 Control 0
Later
=
(
The follouing fork lifts shall be insnected annually with th6 results of the inspections documented on bata Sheet :/.SL-A34-2.
Any major defecta chall be repaired under our normal'Troub1c Report procedure. Minor defects shall be corrected ht the time of the inspection aa.d documented on the data chect,s.
r-Idli TJyy pr n l
e NOR /AL LOCAT10U l T!A TAG MO.
NIGFJFI CIU!Gil CAPACIW (LE. )
FOIMt j
706 Power Storec 357C22 Clark 2000 cas
~
A 690 Power Stores 351064 Caterpillar 3100 Elcetric
~
690 Shop 341574 Caterpillar 3650 Electric 690 Shop 362647 Otis 2000 Electric 690 Shop 362646 otic 2000 Electric 3
690 Shop *
- 341573 Caterpillar 3650 Electric
- Labor Shop - Yd. Stc.
351009 Caterpillar 6000 Gas
=-
The following mobile lifting devicen shall be inspected annually with the results
,.'I of the in pection documented on Data Sheet PGA34-3. Any major defects chall be
~
repaired under our nonral Trcuble Itcport procedure. Minor defects chall be corrected at the tire of the inspection cnd documented cn the data sheet.
-~'
- Revision
r-1 Pege 5 MSL-A34 Revision 1 3/23/77 IDBILE LIFTII!G DEVICE DATA EQUIPMENT NAME ACM REES IDENT FICATION
~
o Bucket Vehicle (JIG Lift) 55569 Fulton Ind.
Telescoping Mobile Crnne TV 92337 Gellion J.~
35-Ton Mobile crone Loter Iorein
,,,h 'i'! U 'Y /.
b.
gfSupervisor, Maintenance Section v Revised: 3/23/77 JFD:SE Attechments d
~
- Revision e
M M
7 W'
O 4,
W m.
E' r
Page 6
~
ICL-A34 Revision 0 ATTACITIT 12/18/75
~
D_/ TA Cm'"I 13L-A34-1 h
CRAES /d!D E0ICTS
-=w Unit Date of Incpection j
Cranc or Heint Identification COHDJ'f30::
i INSPECTIGI! ITE.1 SATIG716i0LY U.dATICFAC'?XI RH %RKS Hooh, Sheavec, 6 Drum Safety Latch Wire Rope Wire Rope Connections J;
3 Oil Lenha (If Applicabic)
Oil Level Drches w
Controls Lirit S:dtches Structural Condition
[
Condition of Lifting Chains a
General Condition of EnSine on Incine Driven Lifts.
Craftenen Performing Inspection mo Revicued Dy Date Foreman Reviewed By Date Maint. Supv. or Aust. I.aint. Supv.
i
o Page 7 IsL-A34
~
Revision 1 ATTACHMET 7/9/76 DATA SHEET MSL-A34-2 FORK LIr7S
, ese Fort Lift Ta6 No.
Date of Inspection
~
Fork Lift Description INSPECTION ITai 3ATISFAC R l 1; I TISFACTORY Hydraulic System for Isaks Battery Specific Gravity Brushes on Drive Motor General Condition Hydraulic Pu=p Motor i
General Structurai Cont' tion
- S Brakes Horn or Alarms Inspect Electrical System Mast, Channels, Carriage,
& Attachments Lift Chains and Rollers Engine - Points, Plugs, Condenser Air Filter Carburetor
- b A*% 0 %
Craftsmen Performing Inspection
~
Reviewed By Date Foreman i
l Reviewed By Date Maint. Supv. or Asst. Maint. Supv.
- Revision l
- =.
.e Page 8 MSL-A34 f,
y Revision 1 ATTACIDIEIIT 10/27/76
[.
DATA Sim ISL-A34-3 O
~ [~.e.
1.3 Mobile Crane Tec Iro.
Date of Inspection r[
Mobile Cranc Description ia COIIDITICII f"'[
I!!SFECTIOI! ITEI SATISFACTORY UIISATISTACTORY REMA.RKS Hook Condition (uncre aimlicable) c4-Condition of Cable ld Hydraulic Leaks ry li Controls u
Linit Switches cad g
Interlocks lj Battery Level and_
Specific Gravity u"U Brakes and Hoists Brakes for Dr'ives I
General Structural Condition 5
ElectricalSystem(General)
Engine Mounts d
J'?=
Turntable Rollers 4
'3 Turntable Assc=blies
-.I Main Piston a
m.4 4-Antifreeze a
J l
'~
Craftsmen Performing Inspection J,.
32 Revimred By Date Foreman Revieved By Date a
Maint. Supv. or Asst. Maint. Supv.
T J
'CRevision.
3-A'
- -