Forwards Application for Amend to License NPF-3,revising App a Tech Specs.Class III Amend Fee Encl
ML20049A769
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/25/1981
From: Crouse R
TOLEDO EDISON CO.
To: Stolz J
Office of Nuclear Reactor Regulation
Shared Package
ML20049A770 List:
References
738, TAC-47040, TAC-47041, TAC-47043, NUDOCS 8110020252
Download: ML20049A769 (2)


Text

..

TOLEDO

%mm EDISON Docket No. 50-346 RcHAno P. CROUSE License No. NPF-3

  • Vg'**

f Serial No. 738 i4,si23S.s22i in\ @i I ry September 25, 1981 g 7 t.,

Director of Nuclear Reactor Regulation Attention: Mr. John F. Stolz ,h k 6 Lj Operating Reactors Branch No. 4 Dg6 3 C-

) Division of Operating Reactors q'q,h # 7 United States Nuclear Regulatory Commission /X sd d

Washington, D.C. 20555

Dear Mr. Stolz:

Under separate cover, we are transmitting three (3) original and forty (40) conformed copies of an application for Amendment to Facility Oper-ating License No. NPF-3 for the Davis-Besse Nuclear Power Station Unit No. 1.

This application requests that the Davis-Besse Nuclear Power Station Unit 1 Technical Specifications, Appendix A, be revised to reflect the c'tanges attached. The proposed changes include:

1. Changes in Table 3.6-2;
2. Changes in Bases 3/4.3.3.7;
3. Changes in Section 4.4.6.2.2 and 6,9.1.9;
4. Changes in Section 3.4.8, Table 4.4-4, Figure 3.4-1 and Bases.

The four attachments identify the proposed changes and their safety evaluation. Item 1 concerns Steam Generator Containment Isolation Valves. Item 2 concerns Chlorine Latector and the Control Room Ventila-tion. Item 3 concerns Combined Leakage Test and Reporting Requirements.

Item 4 concerns the limits for Dose Equivalent I-131. The present Dose Equivalent I-131 (Item 4) limit in the Technical Specifications was based on conservative estimates. The new limits proposed by Toledo Edison will not result in violation of the off-site dose limits in 10CFR100 and the total operating time of the unit beyond the proposed specific activity levels will be restricced to no more than 800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> per year of the unit's operating time. Ol 5

//

8110020252 810925

, PDR ADOCK 05000346 P PDR THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652

2-This amendme:it requests four changes of Class III type. It is therefore

' determined to be a Class IV amendment request. Enclosed is a check for

$12,300 as requested by 10CFR170.22.

Very truly yours, f : ^'

RPC: GAB Attachments l

bj a/9 cc:

DB-1 hTC Resident Inspector 1

l

< a l

i