ML20049A769
| ML20049A769 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 09/25/1981 |
| From: | Crouse R TOLEDO EDISON CO. |
| To: | Stolz J Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML20049A770 | List: |
| References | |
| 738, TAC-47040, TAC-47041, TAC-47043, NUDOCS 8110020252 | |
| Download: ML20049A769 (2) | |
Text
..
TOLEDO
%mm EDISON Docket No. 50-346 RcHAno P. CROUSE License No. NPF-3 Vg'**
f Serial No. 738 i4,si23S.s22i in\\ @i I ry September 25, 1981 g
7 t.,
Director of Nuclear Reactor Regulation k
6 Lj
,h Dg6 C-Attention:
Mr. John F. Stolz q'q,h #
Operating Reactors Branch No. 4 37
)
Division of Operating Reactors United States Nuclear Regulatory Commission
/X sd d
Washington, D.C.
20555
Dear Mr. Stolz:
Under separate cover, we are transmitting three (3) original and forty (40) conformed copies of an application for Amendment to Facility Oper-ating License No. NPF-3 for the Davis-Besse Nuclear Power Station Unit No. 1.
This application requests that the Davis-Besse Nuclear Power Station Unit 1 Technical Specifications, Appendix A, be revised to reflect the c'tanges attached.
The proposed changes include:
1.
Changes in Table 3.6-2; 2.
Changes in Bases 3/4.3.3.7; 3.
Changes in Section 4.4.6.2.2 and 6,9.1.9; 4.
Changes in Section 3.4.8, Table 4.4-4, Figure 3.4-1 and Bases.
The four attachments identify the proposed changes and their safety evaluation.
Item 1 concerns Steam Generator Containment Isolation Valves.
Item 2 concerns Chlorine Latector and the Control Room Ventila-tion.
Item 3 concerns Combined Leakage Test and Reporting Requirements.
Item 4 concerns the limits for Dose Equivalent I-131.
The present Dose Equivalent I-131 (Item 4) limit in the Technical Specifications was based on conservative estimates. The new limits proposed by Toledo Edison will not result in violation of the off-site dose limits in 10CFR100 and the total operating time of the unit beyond the proposed specific activity levels will be restricced to no more than 800 hours0.00926 days <br />0.222 hours <br />0.00132 weeks <br />3.044e-4 months <br /> per year of the unit's operating time.
Ol 5
/ /
8110020252 810925 PDR ADOCK 05000346 P
PDR THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO. OHIO 43652
2-This amendme:it requests four changes of Class III type.
It is therefore determined to be a Class IV amendment request. Enclosed is a check for
$12,300 as requested by 10CFR170.22.
Very truly yours, f : ^'
RPC: GAB Attachments l
bj a/9 cc:
DB-1 hTC Resident Inspector 1
l a
l i
-*1*-rw $
p aPvfv m w e v-g w*-
wer-Ng wey.m ya--me.,h'-F
- N7+^~
7*'T T""'s+-+temurymeyg w a y vm e--r -' ve w -p m-Me Nw. w g-w+ F w's u* wv g env WvgNh n w + M - www w wwir rev 'r w w-*y+ayw-'8
'w w ww -91W7*