Letter Sequence Request |
|---|
|
Results
Other: 05000346/LER-1980-089, Forwards LER 80-089/03L-0, 05000346/LER-1980-089-03, /03L-0:on 801203,following Reactor Trip,Rcs Sample Revealed Dose Equivalent I-131 Level Was Greater than Tech Specs.Caused by Gas Leakage Through Fuel Cladding.Levels Monitored to Ensure That Gas Decayed to Below Limits, 05000346/LER-1981-016, Forwards LER 81-016/03L-0, 05000346/LER-1981-016-03, /03L-0:on 810308,dose Equivalent I-131 Level Exceeded Tech Spec Limit.Caused by Gas Leakage Through Fuel Cladding.Levels Monitored, ML20049A784
|
MONTHYEAR05000346/LER-1980-089, Forwards LER 80-089/03L-01981-01-0202 January 1981 Forwards LER 80-089/03L-0 Project stage: Other 05000346/LER-1980-089-03, /03L-0:on 801203,following Reactor Trip,Rcs Sample Revealed Dose Equivalent I-131 Level Was Greater than Tech Specs.Caused by Gas Leakage Through Fuel Cladding.Levels Monitored to Ensure That Gas Decayed to Below Limits1981-01-0202 January 1981 /03L-0:on 801203,following Reactor Trip,Rcs Sample Revealed Dose Equivalent I-131 Level Was Greater than Tech Specs.Caused by Gas Leakage Through Fuel Cladding.Levels Monitored to Ensure That Gas Decayed to Below Limits Project stage: Other 05000346/LER-1981-016-03, /03L-0:on 810308,dose Equivalent I-131 Level Exceeded Tech Spec Limit.Caused by Gas Leakage Through Fuel Cladding.Levels Monitored1981-04-0303 April 1981 /03L-0:on 810308,dose Equivalent I-131 Level Exceeded Tech Spec Limit.Caused by Gas Leakage Through Fuel Cladding.Levels Monitored Project stage: Other 05000346/LER-1981-016, Forwards LER 81-016/03L-01981-04-0303 April 1981 Forwards LER 81-016/03L-0 Project stage: Other ML20049A7691981-09-25025 September 1981 Forwards Application for Amend to License NPF-3,revising App a Tech Specs.Class III Amend Fee Encl Project stage: Request ML20049A7841981-09-25025 September 1981 Proposed Tech Specs 3/4.3,4.4.6.2.1,3.4.8 & 3/4.4.7 Re Instrumentation Surveillance Requirements,Limiting Condition for Operation & Bases,Respectively Project stage: Other ML20049A7761981-09-25025 September 1981 Application for Amend to License NPF-3,revising App a Tech Specs Re Steam Generator Containment Isolation Valves, Chlorine Detector & Control Room Ventilation & I-131 Dose Equivalent.Safety Evaluations Encl Project stage: Request ML20095A3751984-08-13013 August 1984 Withdraws Item 4 of 810925 Application for Amend to License NPF-3,per Project stage: Request 1981-04-03
[Table View] |
Text
TOLEDO
% EDISDN Docket No. 50-346
$.f," O h "
rua
}
"'*'***~5**'
License No. NPF-3 Serial No. 1073 August 13, 1984 Director of Nuclear Reactor Regulation Attention:
Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission Washington, D.C.
20555
Dear Mr. Stolz:
This is in response to your letter dated April 19, 1984 (Log No. 1496) concerning Application for Amendment - September 25,s1981. Your letter requested for Toledo Edison to inform you formally of our withdrawal of Item 4 of our September 25, 1981 (Serial-No. 738) Amendment Application.
Toledo Edison hereby withdraws its Application for Amendment _on Item 4 dated September 25, 1981 for the Davis-Besse Nuclear Power Station Unit No. 1.
Very truly yours, kg :=r '
RPC: GAB:lah cc: DB-l'NRC Resident-Inspector State of Ohio 0\\
8408210456 840813 0
PDR ADOCK 05000346 p
PDR gQ THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OH!O 43652
.