TOLEDO
%mm EDISON RCHAno P. CROUSE Docket No. 50-346 U.
License No. NPF-3 wisi ass s22i Serial No. 1081 September 11, 1984 Director of Nuclear Reactor Regulation Attention:
Mr. John F. Stolz Operating Reactor Branch No. 4 Division of Operating Reactors United States Nuclear Regulatory Commission.
Washington, DC 20555
Dear Mr. Stolz:
Under separate cover, we are transmitting three (3) original and forty (40) conformed copies of an application for Amendment to Facility Operating License No. NPF-3 for the Davis-Besse Nuclear Power Station Unit No. 1.
This application req nsts that the Davis-Besse Nuclear Power Station Unit 1 Technical Spedtications, Appendix A, be revised to reflect the changes attached. The proposed changes involve Table 3.6-2 and bases.
The attachments identify the changes, Safety Evaluation and Significant Hazard Conditions for the revised amendment request submittal dated September 25, 1981 (Serial No. 738) concerning containment isolation valves in the steam generator drain line. This submittal adds the requirement for closure time for the isolation valves MS 603 and MS 611.
This amendment request involves a change to the License. Enclosed is a check for $150 as requested by 10 CFR 170.12.
Very truly yours, ffh = ~
Enclosure
-ks d/7 cc: DB-1 NRC Resident Inspector State of Ohio O
34~g goor THE TOLEDO EDISON COMPANY EDISON PLAZA 300 MADISON AVENUE TOLEDO, OHIO 43652 g