Informs Commission That NUREG-0705, Identification of New Unresolved Safety Issues Re Nuclear Power Plants,Special Rept to Congress, Completed
ML20049A468
Person / Time
Issue date: 03/19/1981
From: Dircks W
NRC OFFICE OF THE EXECUTIVE DIRECTOR FOR OPERATIONS (EDO)
To:
Shared Package
ML20049A471 List:
References
FOIA-82-176, RTR-NUREG-0705, RTR-NUREG-705, TASK-PII, TASK-SE SECY-81-180, NUDOCS 8103250369
Download: ML20049A468 (2)


Text

n.: m n --

a

_ 3.q +

.;r

,, y.m

,.3 3-

=

%h \\8o

y. m f.)

IL$

March 19,1981

';, \\5 m

'e

., f N g *...

POLICY ISSUE (Information)

V.

.L.

E :.i =: =:. :z5

.:. t ::-

Fo:r;:. i ;;;

u; The-Comini' sioners

~

~

' 5:

s '

=. E ' t - ' -

~ ~

.: n - :-- - ;' ---:

. = - - - - - '

a't:7 :::: ~:hi5

~

Ti Or: '; ; F:.

I' --": = i:-

Fr'oin 6 fi35 "

Wimanf JirDircks T vide ir. :he i;nec'utFv'e 'Dii-sctor for Operations. ' I:7 : - - h : 12 :' e :.

Eq'1:y 1 :*

  • a.'15 : ' '-f.t u 'si :

Subject:

SPECIAL REPORT TO CONGRESS ON NEW UNRESOLVED SAFETY ISSUES U

i::

t..

7 Purcose:

To inform the Commissioners of the completion of 5::r NUREG-070S: entitled, " Identification of New Unresolved

i: t: 2

..:. :52: t;; E2 Safety. Issues Relating to Nuclear. Power P.lants;;

~

- n.,::nf ::: Spec _ial.: Report to Congress."

.5

- ;E : :: :

t. : ::: : -

Discussion: ?? - i' In resp ~onse to a Comission directive to prepare a g

report in the fom of a NUREG document which will contain a complete and comprehensive discussion of each of the new USIs for forwarding to Congress (580-325), the staff has prepared NUREG-0705.

e.......... Advanre. copies of the report are provided in Enclosure 2 5. ' :'..;

r:

_ l.c,Jnis special report is intended to enlarge on e

1 :: : 5.-

, :.1 e

the short_ summary of this infonnation provided in.

5 :is: ' tic.

ethe
1980 NRC. Annual Report...The report. is now being

s 5: 35:: < 51.

-printed, and-when published, copies will.be forwarded to Congress. Transmittal letters are provided in

7. 2 :. - n c ::

The 1970 Annual Report indicated that such a special report would be submitted to Congress in July 1980.

The report was delayed to accomodate the extended collegial consultations and investigations that the Commission deemed necessary for their selection and approval of new Unresolved Safety Issues. This report describes the process used to evaluate the larae number of concerns and reccmmendations which resiJited from the major investigations of the Three liile Island-2 accident, as well as:'other, events and investigations of the past year, and the report identif.ies whicha these new issues are designated

yg ry's Unresolved Safety Issues.

a,

/

Contact:

g -

g 3 g ')(p XKniel, yRR c 7

27141 3,

s n

<t x ~i j q u

~..

o The Come.issioners.

As a result of this review process, the four issues listed below have bee'n designated by the Commission

~

as new Unresolved Safety Issues. These issues are:

(1) Shutdown decay heat removal requirements (Task A-45)

~

(2). Seismic qualificati,on-of-equ,ippnat-e operating plants (TaspAd6):.:.;.337,'eactor.=TTasic:ica ul=

~

(3)

Safety implications of control systems As 47)

~

(4) Hydrogen control measures and effects of hydrogen'

~

burns on safety equipment (Task A-48) f

~

" ~ ~

Appendix A of the report. presents an expanded discussion of each new Unresolved Safety Issue including issue definition, a preliminary discussion of the action plan and a basis for continued.p.lant ppera. tion 3 and.331,, -. -,

i licensing.

p::. :e 33 -, E.,3, -.. ;.n e gn..{ 3-,3 -

.:r- ::se :

.n er:m sne

r. sular Appendix B of the report provides;a; brief discussion of each of the candidate safety. -ismnot-de.signated 333 3p. ss as an Unresolved Safety Issuec --- :n,

-), c,

c515

\\

A Task Action Plan is being developed for eac.h new Unresolved Safety Issue which will present a detailed

discussion of the work necessary (broken down..into iridividual tasks) to achieve a -techp.ilcal. rejoJu' tion:-ii-.,y of the issue. The staff and contractor resources required and detailed schedufes'-wi[thi;ntst;ned.iatej. 3,.--.37:3 milestones will also be included 'in-aach plajb

-. pres n a-'.es

..9,;;:n, :. ^.

1:5'.S

[

,'. asa.-ta.ive 'C -!:s " orhad

~

William J. Dircks Executive Director for Operations

Enclosures:

  • l.

NUREG-0705, " Identification of New Unresolved Safety Issues Relating to Nuclear Power: Plants, :

Special Report to Congress" 2.

Transmittal Letters to Congress

  • Commissioners, Secy, PE & GC only.

O e

  • l

,