Informs That Addl Info Needed to Continue Review of Util Re SEP Topic III-7B Concerning Shield Wall Temp
ML20046C931
Person / Time
Site: Oyster Creek
Issue date: 07/26/1993
From: Dromerick A
Office of Nuclear Reactor Regulation
To: J. J. Barton
GENERAL PUBLIC UTILITIES CORP.
References
TASK-03-07.B, TASK-3-7.B, TASK-RR TAC-M76879, NUDOCS 9308130051
Download: ML20046C931 (3)


Text

July 26, 1993 Docket No. 50-219 Distribution:

. Docket File NRC & Local PDRs Mr. John J. Barton PD I-4 Plant Vice President r.nd Director SVarga GPU Nuclear Corporation JCalvo Oyster Creek Nuclear Generating Station SNorris Post Office Box 388 ADromerick Forked River, New Jersey 08731 OGC ACRS (10)

Dear Mr. Barton:

JFRogge, RI

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION - SEP TOPIC III-7B, SHIELD WALL TEMPERATURE (TAC NO. M76879)

The staff has reviewed your letter of June 30, 1993, regarding SEP Topic III-78, Shield Wall Temperature. As a result of our review we have determined that additional information is required for us to complete the review. The information required is as follows:

Provide stresses (numerical values) in the concrete and reinforcing bars in the drywell shield wall, above elevation 95 ft. The stresses should be provided under load combinations 3.3.2c and 3.3.2d (p. 39 of Impell Report). Demonstrate that the stresses are below the allowables, considering the existing (cracked) condition of the shield wall. Also, discuss the measures taken (if any) to prevent the migration of moisture thru the cracks to alleviate rebar corrosion.

We request that you provide the information within 30 days of receipt of this letter.

This requirement affects one respondent and, therefore, is not subject to Office of Management and Budget review under P.L.96-511, Sincerely, Original signed by Alexander W. Dromerick, Senior Project Manager Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc: See next page 280005 OFFICE LA:PDI-4 PRtPDh4/)

bMI-4 4Norrib NNierick:cn JSfoh NAME /

fg DATE 7 /pt/93

'T/1[,/93 9 / dd93

/ /

/ /

E ID OFFICIAL RECORD COPY i

Document Name: G:\\DROMERIC\\M76879.RAI

.,. m.vem r@!W i

U.' '"" [ ;,I bbb b b N 9308130051 930726 PDR ADOCK 05000219 P

PDR u

I

  • /'E UNITED STATES l'

NUCLEAR REGULATORY COMMISSION

\\v j/

WASHINGTON, D.C. 2055fHXC1 July 26, 1993 Docket No. 50-219 Mr. John J. Barton Vice President and Director GPU Nuclear Cirporation Oyster Creek Nt. clear Generating Station Post Office Box 308 Forked River, New Jersey 08731

Dear Mr. Barton:

SUBJECT:

REQUEST FOR ADDITIONAL INFORMATION - SEP TOPIC III-7B, SHIELD WALL TEMPERATURE (TAC N0. M768/9)

The staff has reviewed your letter of June 30, 1993, regarding SEP Topic III-7B, Shield Wall Temperature. As a result of our review we have determined that additional information is required for us to complete the review. The information required is as follows:

Provide stresses (numerical values) in the concrete and reinforcing bars in the drywell shield wall, above elevation 95 ft.

The stresses should be provided under load combinations 3.3.2c and 3.3.2d (p. 39 of Impell Report). Demonstrate that the stresses are below the allowables, considering the existing (cracked) condition of the shield wall. Also, discuss the measures taken (if any) to prevent the migration of moisture thru the cracks to alleviate rebar corrosion.

We request that you provide the information within 30 days of receipt of this letter.

This requirement affects one respondent and, therefore, is not subject to Office of Management and Budget review under P.L.96-511.

Sincerely, k$

J')

lexand r W. Dromerick, Senior Project Manager Project Directorate I-4 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation cc:

See next page

Mr. John J. Barton Oyster Creek Nuclear GPU Nuclear Corporation Generating Station cc:

Ernest L. Blake, Jr., Esquire Resident Inspector Shaw, Pittman, Potts & Trowbridge c/o U.S. Nuclear Regulatory Commission 2300 N Street, NW.

Post Office Box 445 Washington, DC 20037 Forked River, New Jersey 08731 Regional Administrator, Region I Kent Tosch, Chief U.S. Nuclear Regulatory Commission New Jersey Department of 475 Allendale Road Environmental Protection King of Prussia, Pennsylvania 19406 Bureau of Nuclear Engineering CN 415 BWR Licensing Manager Trenton, New Jersey 08625 GPU Nuclear Corporation 1 Upper Pond Road Parsippany, New Jersey 07054 Mayor Lacey Township 818 West Lacey Road Forked River, New Jersey 08731 Licensing Manager Oyster Creek Nuclear Generating Station Mail Stop:

Site Emergency Bldg.

Post Office Box 388 Forked River, New Jersey 08731