'o UNITED STATES
'. [d
~,j NUCLEAR REGULATORY COMMISSION 3,
E WASHINGTON, D. C. 20555
+
\\
,* /
- a.
PHILADELPHIA ELECTRIC COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-277 PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 2 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No.178 License No. DPR-44 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by Philadelphia Electric Company, et.
al. (the licensee) dated February 26, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the A:t), and the Commission's rules and regulations set forth in 10 CFR Chapter I.
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health or safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-44 is hereby amended to read as follcws:
ph[ ADO O
7 P
. (2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 178, are hereby incorporated in the license.
PECO shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION M
^
pCharles L.
ler, Director Project Directorate I-2
/
Division of Reactor Projects - 1/II Office of Nuclear Reactor, Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
July 15, 1993
ATTACHMENT TO LICENSE AMENDMENT NO.178-FACILITY OPERATING LICENSE NO. OPR-44 DOCKET NO. 50-277 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages.
The revised areas are indicated by marginal lines.
Remove Insert 4
4 80 80 82 82 83 83 84 84
~
[
i I
f P
l i
I
A i
Unit 2 PBAPS 1.0 DEFINITIONS (Cont'd)
(a) Initiating - A logic that receives signals from channels and produces decision outputs to the actuation logic.
(b) Actuation - A logic that receives signals (either from Initiation logic or channels) and produces decision outputs to accomplish a protective action.
Logic System Functional Test - A Logic System Functional Test shall be a test of all logic components, i.e., all relays and contacts, all trip units, solid state logic elements etc., of a logic circuit, from sensor through and including the actuated device, to verify Operability.
The Logic System Functional Test may be performed by any series of sequential, overlapping or total system steps such that the entire logic system is tested.
Maximum F. action of Limiting Power Density (MPLPD) - The Maximum Fraction of Limiting Power Density (MFLPD) is the highest value existing in the core of the Fraction of Limiting Power Density (FLPD).
i MEMBERS OF THE PUBLIC - Members of the public shall include all persons who are not occupationally associated with the plant.
This category does not include employees of the utility, its contractors, or vendors.
Also excluded from this category are persons who enter the site to service equipment or to make deliveries.
This category does include persons who use portions of the site for recreational, occupational, or other purposes not associated with the plant.
Minimum Critical Power Ratio (MCPR) - The minimum in-core critical power ratio corresponding to the most limiting fuel assembly in the core.
Mode of Operation - A reactor mode switch selects the proper interlocks for the operational status of the unit.
The following are the modes and interlocks provided: Refuel Mode, Run Mode, Shutdown Mode, Startup/ Hot Standby Mode.
. Amendment No. 702, 178
^
f
Unit 2' TABLE 4.2.A MINIMUM TEST AND CAllBRATION FREQUENCY FOR PCIS Instrument Channel (5)
Instrument functional Test Calibration Frequency Instrument Check
- 1) Reactor-High Pressure (1)
Once/3 months None (Shutdown Cooling Permissive)
.2) Reactor. Low-Low-Low (1)(3)
Once/ operating cycle Once/ day Water Level (7) 3)'MainSteamHighTemp.
(1)(3)
Once/ operating cycle Once/ day
- 4) MainSteamHighflow(7)
(1)(3)
'Once/ operating cycle Once/ day
- 5) Main Steam Low Pressure (1)
Once/3 months None'
- 6) Reactor Water Cleanup (1)
Once/3 months Once/ day High Flow
- 7) Reactor Water Cleanup (1)
Once/3 months None High Temp.
- 8) Reactor Pressure (1)(3)
Once/ operating cycle Once/ day (FeedwaterFlushPermissive) o
.t i
logic System functior,a1 Test (4) (6)
Frequency
- 1) Main Steam Line Isolation Vvs.
Once/ Operating Cycle i
Main Steam Line Drain Vvs.
Reactor Water Sample Vvs.
2). RHR
.lsolation Vv. Control Once/ Operating Cycle g.
Shutdown Cooling Vvs.
4 Head Spray
- 3) Reactor Water Cleanup Isolation Once/ Operating Cycle
- 4) Drywell Isolation Vvs.
Once/ Operating Cycle TIP Withdrawal
-M Atmospheric' Control Vvs.
- Sump ~ Drain Valves
- 5) ' Standby Gas Treatment System Once/ Operating Cycle j
g
- Reactor Building Isolation i
1
.E c-
. ~.. - - - -
Unit 2 TABLE 4.2.B MINIMUM TEST AND CALIBRATION FREQUENCY FOR CSCS Logic System Function Test (4) (6)
Frequency 1)
Core Spray Subsystem Once/ Operating Cycle 2)
Low Pressure Coolant Injection Subsystem Once/ Operating Cycle 3)
Containment Cooling Subsystems Once/ Operating Cycle 4)
HPCI~ Subsystem Once/ Operating Cycle i
5)
HPCI Subsystem Auto Isolation Once/ Operating Cycle T
6)
ADS Subsystem Once/ Operating Cycle 7)
RCIC Subsystem Auto Isolation Once/ Operating Cycle 8)
Area Cooling for Safeguard System Once/ Operating Cycle N
a I
a W
D
Unit 2 TABLE 4.2.C r
MINIMUM TEST AND CALIBRATION FREQUENCY FOR CONTROL ROD BLOCKS ACTUATION Instrument Channel Instrument functional Test Calibration Instrument Check
- 1) APPJi - Downscale (1)(3)
Once/3 months Once/ day
- 2) APRM - Upscale (1)(3)
Once/3 months Once/ day 3)
IRM - Upscale (2)(3)
Startup or Control Shutdown (2) 4)
IRM - Downscale (2)(3)
Startup or Control Shutdown (2)
- 5) RBM - Upscale (1)(3)
Once/6 months Once/ day
- 6) RBM - Downstale (1)(3)
Once/6 months Once/ day
- 7) SRM - Upscale (2)(3)
Startup or Control Shutdown (2) 8)
SRM'- Detector Not in (2)(3)
N/A (2)
Startup Position 9)
IRM - Detector Not in (2)(3)
N/A (2)_
Startup Position
- 10) Scram Discharge Instrument Quarterly Once/ Operating Cycle N/A Volume - High Level logic System Functional Test (4) (6)
Frequency l
- 1) System Logic Check Once/ Operating Cycle
]
~$
I a
E.F O
-. ~
Unit2 TABLE 4.2.0 MINIMUM TEST & CAllBRATION FREQUENCY FOR RADIATION MONITORING SYSTEMS Instrument Channels Instrument functional Test Calibration Instrument Check (2)
- 1) Refuel Area Exhaust (1)
Once/3 months Once/ day Monitors - Upscale
- 2) Reactor Building Area (1)
Once/3 months Once/ day
- 3) Main Stack Monitor Once/3 months Once/12 months Once/ day as described in 4.8.C.4.a l
?
i Logic System Functional Frequency Test (4) (6)
- 1) Reactor Building Isolation Once/ Operating Cycle
- 2) Standby Gas Treatment Once/ Operating Cycle
. System Actuation u
a M
w nauq'o UNITED STATES 4
l' 7.
NUCLEAR REGULATORY COMMISSION g
p WASHINGTON, D. C. 20555
\\..../
PHILADELPHIA ELECTRIC COMPANY PUBLIC SERVICE ELECTRIC AND GAS COMPANY DELMARVA POWER AND LIGHT COMPANY ATLANTIC CITY ELECTRIC COMPANY DOCKET NO. 50-278 PEACH BOTTOM ATOMIC POWER STATION. UNIT NO. 3 AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 181 License No. DPR-56 1.
The Nuclear Regulatory Commission (the Commission) has found that:
~
A.
The application for amendment by Philadelphia Electric Company, et.
al. (the licensee) dated February 26, 1993, complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I.
B.
The facility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health or safety of the public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C(2) of Facility Operating License No. DPR-56 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No.181, are hereby incorporated in the license.
PEC0 shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of its date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION Charles L.
1
, Director Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation
Attachment:
Changes to the Technical Specifications Date of Issuance:
July 15, 1993 I
6
i l
ATTACHMENT TO LICENSE AMENDMENT NO. 1Ri FACILITY OPERATING LICENSE NO. DPR-56 DOCKET NO. 50-278 Replace the following pages of the Appendix A Technical Specifications with the enclosed pages. The revised areas are indicated by marginal lines.
Remove Insert 4
4 4
80 80 82 82 4
83 83 84 84 4
e I
i Y
b k
i
O i
Unit 3 PBAPS 1.0 DEFINITIONS (Cont'd) 1 (a) Initiating - A logic that receives signals from channels and produces decision outputs to the actuation logic.
(b) Actuation - A logic that receives signals (either from initiation logic or channels) and produces decision outputs to accomplish a protective action.
Logic System Functional Test - A Logic System Functional Test shall be a test of all logic components, i.e.,
all relays and contacts, all trip units, solid state logic elements etc., of a logic circuit, from sensor through and including the actuated device, to verify Operability.
The Logic System Functional Test may be performed by any series of sequential, overlapping or total system steps such that the entire logic system is tested.
Maximum Fraction of Limiting Power Density (MFLPD) --The Maximum Fraction of Limiting Power Density (MFLPD) is the highest value existing in the core of the Fraction of Limiting Power Density (FLPD).
MEMBERS OF THE PUBLIC - Members of the public shall include all persons who are not occupationally associated with the plant.
This category does not include employees of the utility, its contractors, or vendors.
Also excluded from this category are persons who enter the site to service equipment or to make deliveries.
This. category does include persons who use portions of the site for recreational, occupational, or other purposes not associated with the plant.
Minimum Critical Power Ratio (MCPR) - The minimum in-core critical power ratio corresponding to the most limiting fuel assembly in the Core.
Mode of Operation - A reactor mode switch selects the proper interlocks for the operational status of the unit.
The following are the modes and interlocks provided: Refuel Mode, Run Mode, Shutdown Mode, Startup/ Hot Standby Mode.
)
i I Amendment No. 104,181
.]
)
4
. Unit 3-TABLE 4.2.A i
MINIMUM TEST AND CAllBRATION FREQUENCY FOR PCIS
_,:s Instrument Channel (5)
Instrument Functional Test Calibration Frequency Instrument Check
- 1) Reactor High Pressure (1)
Once/3 months None (Shutdown Cooling Permissive)
-2) Reactor Low-Low-Low (1)(3)
Once/ operating cycle Once/ day Water Level (7)
- 3) Main Steam High Temp.
(1)(3)
Once/ operating cycle Once/ day
- 4) Main Steam High Flow (7)
(1)(3)
Once/ operating cycle Once/ day
- 5) Main Steam Low. Pressure (1)
Once/3 months None
- 6) Reactor Water Cleanup (1)
Once/3 months Once/ day q
High Flow
- 7) Reactor Water Cleanup (1)
Once/3 months None High Temp.
- 8) Reactor Pressure (1)(3)
Once/ operating cycle Once/ day (Feedwater Flush Permissive) b Logic System Functional Test (4) (6)
Frequency
'1) Main Steam Line Isolation Vvs.
Once/ Operating Cycle i
Main Steam Line Drain Vvs.
Reactor Water Sample Vvs.
k' o
- 2) RHR - Isolation Vv. Control Once/ Operating Cycle I
k Shutdown Cooling Vvs.
?,
Reactor Water Cleanup Isolation Once/ Operating Cycle I
3) 1
- 4) Drywell. Isolation Vvs.
Once/ Operating Cycle I
, $?
_TIP Withdrawal Atmospheric Control Vvs.
_y-O Sump Drain. Valves O
5): Standby Gas Treatment System Once/ Operating' Cycle l
P Reactor Building Isolation-g.-
p
. _ _, ~.
~..
..,_a____...,_
Unit 3 TABLE 4.2.B MINIMUM TEST AND CALIBRATION FREQUENCY FOR CSCS Logic System Function Test (4) (6)
Frequency 1)
Core Spray Subsystem Once/ Operating Cycle 2)
Low Pressure Coolant Injection Subsystem Once/ Operating Cycle 3)
Containment Cooling Subsystems Once/ Operating Cycle 4)
HPCI Subsystem Once/ Operating Cycle j,
5)
HPCI Subsystem Auto Isolation Once/ Operating Cycle
'T 6)
ADS Subsystem Once/ Operating Cycle 7)
RCIC Subsystem Auto isolation Once/ Operating Cycle 8)
Area Cooling for Safeguard System Once/ Operating Cycle kn$
a
!?
L M
4,.
_l
Unit 3 TABLE 4.2.C MINIMUM TEST AND CALIBRATION FREQUENCY FOR CONTROL ROD BLOCKS ACTUATION Instrument Channel Instrument Functional Test Calibration Instrument Check
-1) APRM - Downscale (1)(3)
Once/3 months Once/ day
- 2) APRM - Upscale (1)(3)
Once/3 months Once/ day 3)
IRM - Upscale (2)(3)
Startup or Control Shutdown (2) 4)
IRM - Downscale (2)(3)
Startup or Control Shutdown (2)
- 5) RBM - Upscale (1)(3)
Once/6 months Once/ day
- 6) RBM - Downscale (1)(3)
Once/6 months Once/ day
- 7) SRM - Upscale (2)(3)
Startup or Control Shutdown (2)
- 8) SRM - Detector Not in (2)(3)
N/A (2)
Startup Position 9)
IRM - Detector Not in (2)(3)
N/A (2)
Startup Position
- 10) Scram Discharge Instrument Quarterly Once/ Operating Cycle N/A h
Volume - High Level i
logic System functional Test (4) (6)
Frequency l
- 1) System logic Check Once/ Operating Cycle
{
F m
s P.
?
~
Unit' 3 TABLE 4.2.0 MINIMUM TEST & CAllBRATION FREQUENCY FOR RADIATION MONITORING SYSTEMS Instrument Channels Instrument functional Test Calibration Instrument Check (2)
- 1) Refuel Area Exhaust (1)
Once/3 months Once/ day Monitors - Upscale
- 2) Reactor Building Area (1)
Once/3 months Once/ day
- 3) Main Stack Monitor Once/3 months Once/12 months Once/ day as described in 4.8.C.4.a i
E I
logic System Functional Frequency Test (4) (6)
- 1) Reactor Building Isolation Once/ Operating Cycle
- 2) Standby Gas Treatment Once/ Operating Cycle
(
System Actuation o
a
.EF
?
m.