ML20045C106

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-266/93-09 & 50-301/93-09 on 930401-0524 & Notice of Violation
ML20045C106
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 06/11/1993
From: Greger L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Link R
WISCONSIN ELECTRIC POWER CO.
Shared Package
ML20045C107 List:
References
NUDOCS 9306220083
Download: ML20045C106 (2)


See also: IR 05000266/1993009

Text

,

i

k"

s

JUN li 1993

i

Docket Nos. 50-266; 50-301

Wisconsin Electric Power Company

ATTN: Mr. R. E. Link

>

Vice President

Nuclear Power

231 West Michigan Street - P379

Milwaukee, WI 53201

Dear Mr. Link:

(

This refers to the routine safety inspection conducted by Messrs. K. R. Jury-

and J. Gadzala of this office, from April 1 through May 24, 1993, of

activities at the Point Beach Nuclear Plant Units 1 and '2.

Our findings were

-

discussed with Mr. G. J. Maxfield and members of his staff.at the conclusion

of the inspection.

Areas examined during the inspection are identified in the report.

Within

these areas, the inspection consisted of selective examinations of procedures

g1l

and representative records, interviews with personnel, and observations.

During this inspection, certain of your activities appeared to be in violation

of NRC requirements, as specified in the enclosed-Notice.

The violation is of

concern because ineffective corrective action created the potential for a

recurrence of conditions adverse to safety.

Additionally, certain other

activities also appeared to be in violation of NRC requirements. However, as

described in the enclosed inspection report, these other violations will not

be subject to enforcement action because your efforts in identifying and

correcting the violations meet the criteria specified in Section VII.B of the

" General Statement of Policy and Procedures for NRC Enforcement Actions",

-

(10 CFR Part 2, Appendix C).

'

You are required to respond to this letter and should follow the instructions

specified in the enclosed Notice when preparing your response.

,

in accordance with 10 CFR 2.790 of the Commission's regulations, a copy of

this letter, the enclosures, and your response to this letter will be. placed

'

in the NRC Public Document Room.

j

The responses directed by this letter and the enclosed Notice are not subject

to the clearance procedures of the Office of Management'and Budget ~ as required

by the Paperwork Reduction Act of 1980, Public Law No. 96.511.

]

210004

!

./ O

'9306220083-930611

/[

PDR

ADOCK 05000266

\\

-

..

,

.

. .

=_.

._

.

.

..

4

1

.

Wisconsin Electric Power Company

2-

JUN 11 E

,

We will gladly discuss any questions you have concerning this inspection.

Your cooperation with us is appreciated.

Sincerely,

Original Signed by R. D. Lankobury

N . Robert Greger, Chief

L

1

0

Reactor Projects Branch 3

,

Enclosure:

Inspection Reports

,

No. 50-266/93009(DRP);

No. 50-301/93009(DRP)

CC W/ enclosure:

G. J. Maxfield, Plant Manager

'

OC/LFDCB

'

Resident Inspector, RIII

Virgil Kanable, Chief

Boiler Section

Cheryl L. Parrino, Chairman

Wisconsia Public Service

Commission

Robert M. Thompson, Administrator

WI Div of Emergency Govt.

bec:

PUBLIC

,

.

RIII

RIII

RIII

RIII

/d!

Op

47

7

CO

T>bS

gb5

%

'

wyer

9-

yr /

0(1teanu

Grpger-

%nttt

C4nwo

f<L

.

/

(t n/93

6ho/93

6111/93

y\\g\\p,

6/,jn

,

1

.-

-.

.